Tripura State Electricity Corporation Limited-TSECL has published Capacity Addition Of 1 X 25 Mva Power Transformer At Missiontilla By Transhipment Of The Said Transformer From Banduar 132 Kv Sub-Station To Missiontilla 132 Kv Sub-Station In/C Loading, Unloading, Dragging, Testing, Filtration & Required Dismantling.. Submission Date for this Tender is 21-08-2023. Power Transformer Tenders in Unakoti Tripura. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Dismantling, dragging, loading, unloading, transportation from Banduar 132 KV Sub-station to Missiontilla 132 KV Sub-station and commissioning of 25 MVA, 132/33 KV Power Transformer Transportation mass (65.100 MT - 17.200 MT) = 47.900 MT |
2 | De-tanking of oil from transformer tank to empty barrels and storage tank with simultaneously filling Nitrogen (N?) Gas into the transformer tank as required. |
3 | i) Dismantling of Transformer HV bushing and accessories etc. as required. |
4 | ii) Dragging of Transformer from plinth to unloading point (Distance = 100 mtr) |
5 | iii) Loading of Transformer and accessories like bushings with packing & oil etc. on low bed tailor at Banduar |
6 | iv) Transportation of above Transformer with necessary accessories & oil by low bed tailor from Banduar 132 KV Sub-station to Missiontilla 132 KV Sub-station (Distance = 217 KM) (Total transportation mass = 47.900 MT) |
7 | a) 1st 50 Km (47.900 MT x 50 KM) = 2395 |
8 | b) Next 51 Km to 150 Km (47.900 MT x 100 KM) = 4790 |
9 | b) Next 151 KM to 217 KM (47.900 MT x 67 KM) = 3209.3 |
10 | v) Unloading of Transformer & accessories like bushings with packing & oil etc. from low bed tailor at Missiontilla 132 KV Sub-station |
11 | vi) Dragging of Transformer from unloading point to pinth (Distance = 100 Mtr) |
12 | vii) Transit Insurance |
13 | Vaccuming the transformer main tank and filling of Nitrogen alternatively up-to complete cycle as required. |
14 | Refitting & fixing of Transformer HV Bushing and accessories etc. as required. |
15 | Filling of oil and oil filtration will be done up-to achieving satisfcatory IR value. |
16 | Carrying of 25 nos. Transfromer oil barrel from Banduar 132 KV Sub-station to Missiontilla Sub-station including loading, unloading, staking, manual carraige and mechanical carraige etc. (for 217 KM @ Rs. 9.48 Per Km/ Per Barrel) |
17 | Carrying of 25 nos. Transfromer oil barrel from Missiontilla Sub-station to Banduar 132 KV Sub-station including loading, unloading, staking, manual carraige and mechanical carraige etc. after succesful commissioning of Power Transformer (for 217 KM @ Rs. 9.48 Per Km/ Per Barrel) |
18 | Dragging of 20 MVA Power Transformer from plinth to safe place for to make passage (Distance = 20 mtr) (Transportation mass = 40 MT) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail