| 1 | The Work for Laying of 33KV3x300 sq.mm XLPE cable for 33KV Tarna line from 220/33KV Satomahua S.S., Increasing Capacity of 33/11 KV S/s New Daulatpur from 1x10 to 10+5 MVA, & Special Pipe Earthing of 5 MVA & 10 MVA Power T/ F under EE, UECD-II, Varanasi on Semi Turn-Key Basis in System Strengthening Scheme |
| 2 | M.S. holding clamp/X-arm clamp for ST Pole 11 Mtr with N&B |
| 3 | M.S. Nut & Bolts off size |
| 4 | HDPE pipe 160mm |
| 5 | GI pipe 150mm |
| 6 | Allu Lug 300sq.mm |
| 7 | 4x2.5 mm sq copper control cable |
| 8 | 2x2.5 mm sq copper control cable |
| 9 | 6x2.5 mm sq copper control cable |
| 10 | P.G. Clamp for Panther |
| 11 | Isolator clamp for Panther |
| 12 | H.S. Jointing kit for 33 KV 3x300 XLPE cable box O/D |
| 13 | H.S. Jointing kit for 11 KV 3x300 XLPE cable box O/D |
| 14 | H.S. Jointing kit for 11 KV 3x300 XLPE cable box I/D |
| 15 | Loading unloading and transportation of 33 KV 3x300 sq mm XLPE Cable from Raja Talab central store to site |
| 16 | Loading unloading & carriage of all required materials includingCT, Isolators,Structures, M.S. Channel, Angle, CRP,11kv vcb,33kv vcb & Decentralised material etc. from Raja Talab central store to dump store anddump store to site |
| 17 | Laying of Under Ground single 33 KV 3x300 sq mm XLPE cableBy HDD Method in HDPE pipe after Laying of HDPE pipe thorough HDD Method as required for Raod crossing |
| 18 | Laying & Dressing of Under Ground single 33 KV 3x300 sq mm XLPE cable after digging of roadincluding in cost of brick, Patiya & sand as per NORMS includin cost of civil material. |
| 19 | Laying and connection of control cable 4x2.5 sq mm, 2x2.5 sq mm & 6x2.5 sq mm from switchyard to control Pannel in Control Room including construction of trench and providing stone cover with materail |
| 20 | Laying of 11 KV cable 3x300 sq mm XLPE cable with brick, stone & sandincluding hanging of cable. |
| 21 | Jointing of HS O/D cable jointing kit for 33 KV 3x300sq mm XLPE cable |
| 22 | Jointing ofOut Door/ In Door 11 KV 3x300 XLPE cable box. Including cost of jointing box |
| 23 | Hoisting of 33 KV 3x300sq mm cable on Double Pole through G.I.Pipe of size 6\" dia, 3 mtr long |
| 24 | Jumpering and connection of 33kv line |
| 25 | Grouting, Errection of following structure and fitting with mounting of equipments. Complete in all respect. |
| 26 | 33 KV Isolator |
| 27 | 33 KV lightening Arresters |
| 28 | 33 KV Post Insulator |
| 29 | 33 kv CT |
| 30 | Errection of plinth & foundation of power T/F Plinth including cost of material 3.5x3.5x1.5 m as per standred. |
| 31 | Plinth & foundation of 33 KV VCB/ Pannel and plinth of operation in S.yard with material |
| 32 | Installation of 11 KV switch gear & control panel in control Room complete work including |
| 33 | Febrication & Fitting fixing and grouting of cable stand with grouting material etc |
| 34 | Earthing of indoor equipment including cost of material complete as per desing prescribed by RESSPO. |
| 35 | Painting of All structure 01 Coat red-Oxide & 2 Coat Paint of good quality including material. |
| 36 | Leveling of switchyard & laying of stone blast in S-yard As Per Norms |
| 37 | Construction of Path way & lighting of Switchyard complete with cost of material |
| 38 | Febracation & fixing of fire stand with 04 No fire bucket |
| 39 | Sp. Pipe earthing of Power T/F Nutral & Body Seperatewith 60\" deep G.I. pipe 40 mm dia including material |
| 40 | Sp. Type earthing of 5 MVA & 10 MVA Power T/Fof capacity at UECD-II by using B-class, GI Pipe of 1.5\" dia and making hand pipe type earth boaring 60\" deep. Neutral & body separately with the help of GI Strip 50x5 mm duly galvanized shall be used. Every DT shall have to such earthing one earthing for T/F Body and Second for Neutral both these points shall be connected to earth through GI strip (50x5 mm) separately. All required materials shall be supplied by the contractor. |