|
| 1 | 1.DESILTING OFOF ARUVAN KULAM(THAMARAI KULAM) AND CONSTRUCTION OFBATHING GHAT AND INLET &OUTLET |
| 2 | Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete |
| 3 | Earth work excavation and all class of soil execpt hard rock etc., completed as per std., specification etc., |
| 4 | BATHING GHATE |
| 5 | Earth work excavation in hard stiff clayee soil and all classes of soil and depositing on bank eith initial lead and lift as per SS 20B |
| 6 | Sand filling with M. sand including cost and conveyance ofmaterials to site including watering and compacting etc., complete. |
| 7 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 8 | Cement concrete 1:3:6 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 9 | Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinall floorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmild steel angles ofsize25mmx25mmx3mmforboardinglaidover silver oak(country wood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand supported by casurina props of10cm to 13cm dia spacedat 75cmcentretocentre and Complete |
| 10 | INLET &OUT LET |
| 11 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20A for fondation |
| 12 | Filling with good river sand including cost, conveyance for all materials& labour charges etc complete |
| 13 | CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete |
| 14 | CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete |
| 15 | Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinall floorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmild steel angles ofsize25mmx25mmx3mmforboardinglaidover silver oak(country wood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand supported by casurina props of10cm to 13cm dia spacedat 75cmcentretocentre and Complete |
| 16 | Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry |
| 17 | Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. |
| 18 | Provision for Name Board Charges etc |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |