| 1 | Construction of school toilet Building in PUES Poongudikkadu at Pudupattinam Panchayat. |
| 2 | Earthwork excavation in all clause of soils, with initial lead and lift charges etc complete |
| 3 | Supply and filling in sand in layers not more than 150 mm tk, including all cost, conveyance and labour charges etc complete |
| 4 | Cement concrete1:4:8, using 40 mm ISS metal, including all cost, conveyance and labour charges etc complete |
| 5 | Brickwork in CM 1:5, using country bricks, includingcost of material site and labour for mixing ,laying and curing charges etc complete |
| 6 | RCC 1:2:4,using 20mm ISS metal,including cost of materials at site and labour for mixing ,laying and curing charges etc complete- Below Base |
| 7 | RCC 1:2:4,using 20mm ISS metal,including cost of materials at site and labour for mixing ,laying and curing charges etc complete-Above Base |
| 8 | Supply and providing centring including with necessary scafolding and props ,including all charges etc complete |
| 9 | Supply and fabrication of steel reinforcement ,including all cost ,conveyance and labour charges etc complete |
| 10 | Plastering in CM 1:3 , 10 mm tk, including cost and of all materials to site and all labour charges for mixing , laying and curing etc complete |
| 11 | Plastering in CM 1:5 , 12 mm tk, including costof all materials to site and all labour charges for mixing , laying and curing etc complete |
| 12 | Roof top finishing with plastering in CM 1:4,20 mm tk,mixed with WPC,including all conveyance and labour charges etc complete |
| 13 | Floor finishing with anti skid ceramic tiles ,paving with CM1:3,including all cost all conveyance material to side and labour charges etc complete |
| 14 | Dadooing with glazed ceramic tiles ,paving with CM1:2,including all cost all conveyance material to side and labour charges etc complete |
| 15 | Distempering two coats using approved colour pigments and labour charges for mixing ,laying and curing charges etc complete |
| 16 | Exeror emulsion painting two coats over the prime coat ,including all cost conveyance material to side and labour charges etc complete |
| 17 | Enamel painting two coats over the prime coat,for new iron works, including all cost, conveyance and labour charges etc copmplte |
| 18 | Provision For IWC, including all charges etc complete |
| 19 | Provision For Steel Door,including all charges etc complete |
| 20 | Provision For Ventilater Arrangements, including all charges etc complete |
| 21 | Provision For Water Supply Arrangement |
| 22 | Provision For Urinal Soak pit and Leach Pit,SanitaryArrangement |
| 23 | Provision for Name board writing, including all charges etc complete |
| 24 | Provision for photo document charges, including all etc complete |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |