Replacement Work Of 36 Kv Circuit Breaker Of 33 Kv T/F-Ii Feeder At 132 Kv Substation Handia & Maintenance, Replacement Of Damaged Components Other Associated Work Of 1.5 Ton Hitachi Make Air Conditioner & Supply, Fixing Of 2 Ton Split Air Conditioner Of
Tender Overview
Project Description
Replacement work of 36 KV Circuit breaker of 33 KV T/F-II feeder at 132 KV Substation Handia & Maintenance, Replacement of damaged components other associated work of 1.5 Ton Hitachi make Air Conditioner & Supply, fixing of 2 Ton Split Air conditioner of voltas/Carrier/Hitachi make at 132 KV Substation Saidabad, under Electy. Trans. Dicision-I, Prayagraj
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Aug-2023 | 82DATE | Date | 11-Sep-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Carriage, Dismantling, erection, loading, proper earthing of 01 No. 36 KV Breaker at 132 KV S/S Handia under ETD-I, Prayagraj. |
| 2 | Dismantling of 01 Nos. 36 KV VCB (BHEL make) of T/F-II bay at 132 KV S/S Handia under ETD-I, Prayagraj. This job includes dismantling of outdated circuit breaker and existing BHEL structure and shifting of material after dismantling to substation store and also required to complete the job satisfactorily including arrangement of all labour & T&P at his own cost. |
| 3 | Proper erection of structure of 33 KV STELMEC Make VCB by fabricating the old structure grouting with channel as per requirement of STELMEC Make VCB structure. This job also includes making of proper matching hole in the channels as per requirement. Contractor shall arrange all labour & T&P at his own cost. |
| 4 | Proper and safe Erection of 36 KV Breaker (STELMEC Make) after dismentaling of damaged 36 KV VCB (BHEL make) at 132 KV S/S Handia under ETD-I, Prayagraj. This job includes shifting of material from substation store to loading site and associated workrequired to complete the job satisfactorily including arrangement of all labour & T&P at his own cost. |
| 5 | Proper and safe earthing of equipment with MS Flat as per technical specification for 36 KV Circuit Breaker safe replacement of 06 No. new jumpers as per required size, after proper erection of new 36 KV VCB at 132 KV S/S Handia under ETD-I, Prayagraj. This work also includes cutting, fabrication of jumper along with allassociated works. ( All labour, fitter and welding machine for earthing and T&P will be provided by contractor on their own risk and cost). |
| 6 | Proper and safe dismantling of cable termination from old 36 KV BHEL circuit Breaker of 33 KV T/F-II bay and safe cable termination of new 36 KV circuit breaker (STELMEC Make) of 33 KV T/F-II bay including proper ferruling with required T&P for completion of work as per drawing. This job includes making necessary required supply and ferule of appropriate size and no respectively for each core of cable and its termination with crimping type lugs and all associated work to complete the job satisfactorily. Contractor will arrange lugs, gland all labour and T&P at his own cost. |
| 7 | Maintenance, replacement of damaged components, other associated work of 1.5 Ton Hitachi make Air Conditioner & Supply, fixing of 2 Ton Split Air conditioner of Voltas/Carrier/ Hitachi make at 132 KV S/S Saidabad, Prayagraj. |
| 8 | Proper and safe replacement of 1.5 ton Hitachi make split AC PCB plate from new indoor unit all T&P material and labour shall be provided by contractor at his own cost at 132 KV S/S Saidabad. |
| 9 | Proper and save attending leakage of gas in 1.5 ton Hitachi make split AC compressor then feeling R-22 gas. All T&P material and labour shall be provided by contractor at his own cost. |
| 10 | Changing of capacitor CD- 65/CB-65 capacity 25 MF. |
| 11 | Changing of damaged fan blade from new. |
| 12 | Repairing of fan motor. |
| 13 | Supply and fixing of 2 ton Split Air Conditioner of Voltas/ Carrier/ Hitachi make in control / kiosk room t 132 KV S/S Saidabad Prayagraj, after dismentling of damage 1.5 ton Split Air Conditioner including all man, material and T&P shall be arranged by contractor at his own cost. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents