| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-08-2023 | Date extention for online filling of tender on portal | Date | 29-08-2023 |
| Sl. No. | Item Description |
| 1 | Bharuhana part- A (civil) |
| 2 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 3 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 4 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 5 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 6 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 7 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 8 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 9 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 10 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 11 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 12 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 13 | 225 Kl 18 M Staging |
| 14 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 15 | Ordinary soil |
| 16 | Mixed soil with Kankar |
| 17 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 18 | 100 mm dia K-7 |
| 19 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 20 | 200 mm dia HDPE Pipe PN-6: Class PE-100 |
| 21 | 180 mm dia HDPE Pipe PN-6: Class PE-100 |
| 22 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 23 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 24 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 25 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 26 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 27 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 28 | Sluice valve - 200 mm dia |
| 29 | Sluice valve - 150 mm dia |
| 30 | Sluice valve - 125 mm dia |
| 31 | Sluice valve - 100 mm dia |
| 32 | Sluice valve - 80 mm dia |
| 33 | Scour valve - 80 mm dia |
| 34 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 35 | 50 mm |
| 36 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 37 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 38 | Sluice valve chamber (masonry Type) |
| 39 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 40 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 41 | Air Valve Chamber |
| 42 | 350 (L) x 350 (W) x 500 (H) mm |
| 43 | Scour Valve Chamber |
| 44 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 45 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 46 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 47 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 48 | Water recharge Mechanism within the water works campus |
| 49 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 50 | B.O.E. surface |
| 51 | Bituminous surface |
| 52 | Interlocking Road |
| 53 | C.C. Road |
| 54 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 55 | B.O.E. surface( 50% of existing bricks to be reused) |
| 56 | Bituminous surface |
| 57 | Interlocking Road |
| 58 | C.C. Road |
| 59 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. ( casing of pipe is done by concreting) |
| 60 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 61 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 62 | Construction of single tap pillar type stand post as per type design |
| 63 | Flow Control Valve for House Hold Connections |
| 64 | Sign Board for water work campus |
| 65 | Bharuhana part- B (E&M) |
| 66 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 67 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 68 | 200/165 MMØ (in over burden/Hard Rock) by using DTHTechnique |
| 69 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 70 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 71 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 72 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 73 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 74 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 75 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 76 | Centre guide. M.S.Ring. Of 200 mm size |
| 77 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 78 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 79 | Logging of Borehole by Electric Logging |
| 80 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 81 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 82 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 83 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 84 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 85 | PUMPING PLANT & CHLORINATING PLANT |
| 86 | SITC of Energy efficient 10 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 87 | Pressure Transmitter |
| 88 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 89 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 90 | POWER CONNECTION |
| 91 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 92 | Power Transmission Line |
| 93 | ELECTRICAL AND INSTRUMENTATION |
| 94 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 95 | Internal electrificaton of water work campus |
| 96 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 97 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 98 | Chain Pulley 1Tonne |
| 99 | FOR TUBEWELL NO-2 |
| 100 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 101 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 102 | 200/165 MMØ (in over burden/Hard Rock) by using DTHTechnique |
| 103 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 104 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 105 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 106 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 107 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 108 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 109 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 110 | Centre guide. M.S.Ring. Of 200 mm size |
| 111 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 112 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 113 | Logging of Borehole by Electric Logging |
| 114 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 115 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 116 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 117 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 118 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 119 | PUMPING PLANT & CHLORINATING PLANT |
| 120 | SITC of Energy efficient 10 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 121 | Pressure Transmitter |
| 122 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 123 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 124 | POWER CONNECTION |
| 125 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 126 | Power Transmission Line |
| 127 | ELECTRICAL AND INSTRUMENTATION |
| 128 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 129 | Internal electrificaton of water work campus |
| 130 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 131 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 132 | Chain Pulley 1Tonne |
| 133 | Haruaa Part A )Civil) |
| 134 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 135 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 136 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 137 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 138 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 139 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 140 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 141 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 142 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 143 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 144 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 145 | 100 Kl 18 M Staging |
| 146 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 147 | Ordinary soil |
| 148 | Mixed soil with Kankar |
| 149 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 150 | 100 mm dia K-7 |
| 151 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 152 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 153 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 154 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 155 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 156 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 157 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 158 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 159 | Sluice valve - 150 mm dia |
| 160 | Sluice valve - 100 mm dia |
| 161 | Sluice valve - 80 mm dia |
| 162 | Scour valve - 80 mm dia |
| 163 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 164 | 50 mm |
| 165 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 166 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 167 | Sluice valve chamber (masonry Type) |
| 168 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 169 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 170 | Air Valve Chamber |
| 171 | 350 (L) x 350 (W) x 500 (H) mm |
| 172 | Scour Valve Chamber |
| 173 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 174 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 175 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 176 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 177 | Water recharge Mechanism within the water works campus |
| 178 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 179 | B.O.E. surface |
| 180 | Bituminous surface |
| 181 | Interlocking Road |
| 182 | C.C. Road |
| 183 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 184 | B.O.E. surface( 50% of existing bricks to be reused) |
| 185 | Bituminous surface |
| 186 | Interlocking Road |
| 187 | C.C. Road |
| 188 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 189 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 190 | Construction of single tap pillar type stand post as per type design |
| 191 | Flow Control Valve for House Hold Connections |
| 192 | Sign Board for water work campus |
| 193 | Huruaa Part B (E&m) |
| 194 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 195 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 196 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 197 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 198 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 199 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 200 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 201 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 202 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 203 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 204 | Centre guide. M.S.Ring. Of 200 mm size |
| 205 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 206 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 207 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 208 | Logging of Borehole by Electric Logging |
| 209 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 210 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 211 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 212 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 213 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 214 | PUMPING PLANT & CHLORINATING PLANT |
| 215 | SITC of Energy efficient 10 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 216 | Pressure Transmitter |
| 217 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 218 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 219 | POWER CONNECTION |
| 220 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 221 | Power Transmission Line |
| 222 | ELECTRICAL AND INSTRUMENTATION |
| 223 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 224 | Internal electrificaton of water work campus |
| 225 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 226 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 227 | Chain Pulley 1Tonne |
| 228 | Kela Bela Part A (Civil) |
| 229 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 230 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 231 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 232 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 233 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 234 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 235 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 236 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 237 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 238 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 239 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 240 | 250 Kl 18 M Staging |
| 241 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 242 | Ordinary soil |
| 243 | Mixed soil with Kankar |
| 244 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 245 | 100 mm dia K-7 |
| 246 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 247 | 200 mm dia HDPE Pipe PN-6: Class PE-100 |
| 248 | 180 mm dia HDPE Pipe PN-6: Class PE-100 |
| 249 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 250 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 251 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 252 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 253 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 254 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 255 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 256 | Sluice valve - 200 mm dia |
| 257 | Sluice valve - 100 mm dia |
| 258 | Sluice valve - 80 mm dia |
| 259 | Scour valve - 80 mm dia |
| 260 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 261 | 50 mm |
| 262 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 263 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 264 | Sluice valve chamber (masonry Type) |
| 265 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 266 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 267 | Air Valve Chamber |
| 268 | 350 (L) x 350 (W) x 500 (H) mm |
| 269 | Scour Valve Chamber |
| 270 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 271 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 272 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 273 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 274 | Water recharge Mechanism within the water works campus |
| 275 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 276 | B.O.E. surface |
| 277 | Bituminous surface |
| 278 | Interlocking Road |
| 279 | C.C. Road |
| 280 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 281 | B.O.E. surface( 50% of existing bricks to be reused) |
| 282 | Bituminous surface |
| 283 | Interlocking Road |
| 284 | C.C. Road |
| 285 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. ( casing of pipe is done by concreting) |
| 286 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 287 | Trenchless crossings |
| 288 | Surveysite Investigation Planning , design Drawings as per State Road manual and vetting / checked from State Road Divisional Office and taking NOC for trenchless crossing of National highway road and Railway track(crossing length 15m to 25m ), Road for of required dia Rising main pipe with casing pipe as required for proper completion of work required size of MS casing pipe as per drawing and as per (IS:3589 & madefrom confining to IS:2062) with 750 Micron PU coating internally and 250 micron anti corrosive bituminouspaint externally by trenchless technology method at an average depth 3.60 mtr from normal ground level up to top of casing pipe including excavation & filling of Pit, Dewatering arrangement, Supporting system for soil,also including supply and fixing of 2 no Sluice valve ISI Mark, construction of sluice valve chamber etc. all complete work including supply & fixing specials in carrier pipe over main pipe, as per specification given in the bid documents including supply of all materials, labour T&P etc. for proper completion of work as per instruction of Engineer. |
| 289 | State Highway road crossing(Upto Dia 350 mm) |
| 290 | Road Crossing- Excavation in foundation of trench of proper sizein soil mixed with moorum, Shingle, Kankar, soft rock, hard rock, including refilling, dressing and ramming earth or sand or bajri, ballast, including providing, supply, carting, lowering, laying and jointing of casing pipe of RCC NP-3 withappropriate size, with rubber ring joint,sand filling in gap inside RCC pipe, insertion of distribution pipe into the encasing pipe including supply of T&P, including concrete of 150 mm thick in with 40mm gaugebrick ballastlocal sand and cement in proportion of 8:4:1, provision for barricading, labour for traffic diversion etc.Complete for proper completion of work as per instruction of Engineer. |
| 291 | 250 mm dia. Pipe |
| 292 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 293 | Construction of single tap pillar type stand post as per type design |
| 294 | Flow Control Valve for House Hold Connections |
| 295 | Sign Board for water work campus |
| 296 | Kela Bela Part B (E&M) |
| 297 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 298 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 299 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 300 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 301 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 302 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 303 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 304 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 305 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 306 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 307 | Centre guide. M.S.Ring. Of 200 mm size |
| 308 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 309 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 310 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 311 | Logging of Borehole by Electric Logging |
| 312 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 313 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 314 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 315 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 316 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 317 | PUMPING PLANT & CHLORINATING PLANT |
| 318 | SITC of Energy efficient 12.5 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 319 | Pressure Transmitter |
| 320 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 321 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 322 | POWER CONNECTION |
| 323 | 15 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 324 | Power Transmission Line |
| 325 | ELECTRICAL AND INSTRUMENTATION |
| 326 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 327 | Internal electrificaton of water work campus |
| 328 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 329 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 330 | Chain Pulley 1Tonne |
| 331 | FOR TUBEWELL NO-2 |
| 332 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 333 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 334 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 335 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 336 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 337 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 338 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 339 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 340 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 341 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 342 | Centre guide. M.S.Ring. Of 200 mm size |
| 343 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 344 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 345 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 346 | Logging of Borehole by Electric Logging |
| 347 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 348 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 349 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 350 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 351 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 352 | PUMPING PLANT & CHLORINATING PLANT |
| 353 | SITC of Energy efficient 12.5 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 354 | Pressure Transmitter |
| 355 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 356 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 357 | POWER CONNECTION |
| 358 | 15 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 359 | Power Transmission Line |
| 360 | ELECTRICAL AND INSTRUMENTATION |
| 361 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 362 | Internal electrificaton of water work campus |
| 363 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 364 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 365 | Chain Pulley 1Tonne |
| 366 | Mevali Part A (Civil) |
| 367 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 368 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 369 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 370 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 371 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 372 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 373 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 374 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 375 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 376 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 377 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 378 | 75 Kl 18 M Staging |
| 379 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 380 | Ordinary soil |
| 381 | Mixed soil with Kankar |
| 382 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 383 | 100 mm dia K-7 |
| 384 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 385 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 386 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 387 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 388 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 389 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 390 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 391 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 392 | Sluice valve - 125 mm dia |
| 393 | Sluice valve - 100 mm dia |
| 394 | Sluice valve - 80 mm dia |
| 395 | Scour valve - 80 mm dia |
| 396 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 397 | 50 mm |
| 398 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 399 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 400 | Sluice valve chamber (masonry Type) |
| 401 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 402 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 403 | Air Valve Chamber |
| 404 | 350 (L) x 350 (W) x 500 (H) mm |
| 405 | Scour Valve Chamber |
| 406 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 407 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 408 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 409 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 410 | Water recharge Mechanism within the water works campus |
| 411 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 412 | B.O.E. surface |
| 413 | Bituminous surface |
| 414 | Interlocking Road |
| 415 | C.C. Road |
| 416 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 417 | B.O.E. surface( 50% of existing bricks to be reused) |
| 418 | Bituminous surface |
| 419 | Interlocking Road |
| 420 | C.C. Road |
| 421 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. ( casing of pipe is done by concreting) |
| 422 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 423 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 424 | Construction of single tap pillar type stand post as per type design |
| 425 | Flow Control Valve for House Hold Connections |
| 426 | Sign Board for water work campus |
| 427 | Mevali Part B (E&M) |
| 428 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 429 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 430 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 431 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 432 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 433 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 434 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 435 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 436 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 437 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 438 | Centre guide. M.S.Ring. Of 200 mm size |
| 439 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 440 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 441 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 442 | Logging of Borehole by Electric Logging |
| 443 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 444 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 445 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 446 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 447 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 448 | PUMPING PLANT & CHLORINATING PLANT |
| 449 | SITC of Energy efficient 7.5 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 80 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 450 | Pressure Transmitter |
| 451 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 80 mm |
| 452 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 453 | POWER CONNECTION |
| 454 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 455 | Power Transmission Line |
| 456 | ELECTRICAL AND INSTRUMENTATION |
| 457 | SITC of Oil Cooled Servo 15 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 458 | Internal electrificaton of water work campus |
| 459 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 460 | 80 mm dia CE/UL Certified Electromagnetic flow meters |
| 461 | Chain Pulley 1Tonne |
| 462 | Piparadad Part A (Civil) |
| 463 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 464 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 465 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 466 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 467 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 468 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 469 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 470 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 471 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 472 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 473 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 474 | 200 Kl 18 M Staging |
| 475 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 476 | Ordinary soil |
| 477 | Mixed soil with Kankar |
| 478 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 479 | 100 mm dia K-7 |
| 480 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 481 | 200 mm dia HDPE Pipe PN-6: Class PE-100 |
| 482 | 180 mm dia HDPE Pipe PN-6: Class PE-100 |
| 483 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 484 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 485 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 486 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 487 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 488 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 489 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 490 | Sluice valve - 200 mm dia |
| 491 | Sluice valve - 125 mm dia |
| 492 | Sluice valve - 100 mm dia |
| 493 | Sluice valve - 80 mm dia |
| 494 | Scour valve - 80 mm dia |
| 495 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 496 | 50 mm |
| 497 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 498 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 499 | Sluice valve chamber (masonry Type) |
| 500 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 501 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 502 | Air Valve Chamber |
| 503 | 350 (L) x 350 (W) x 500 (H) mm |
| 504 | Scour Valve Chamber |
| 505 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 506 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 507 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 508 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 509 | Water recharge Mechanism within the water works campus |
| 510 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 511 | B.O.E. surface |
| 512 | Bituminous surface |
| 513 | Interlocking Road |
| 514 | C.C. Road |
| 515 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 516 | B.O.E. surface( 50% of existing bricks to be reused) |
| 517 | Bituminous surface |
| 518 | Interlocking Road |
| 519 | C.C. Road |
| 520 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. ( casing of pipe is done by concreting) |
| 521 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 522 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 523 | Construction of single tap pillar type stand post as per type design |
| 524 | Flow Control Valve for House Hold Connections |
| 525 | Sign Board for water work campus |
| 526 | Piparadad Part B (E&M) |
| 527 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 528 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 529 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 530 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 531 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 532 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 533 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 534 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 535 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 536 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 537 | Centre guide. M.S.Ring. Of 200 mm size |
| 538 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 539 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 540 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 541 | Logging of Borehole by Electric Logging |
| 542 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 543 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 544 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 545 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 546 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 547 | PUMPING PLANT & CHLORINATING PLANT |
| 548 | SITC of Energy efficient 10 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 549 | Pressure Transmitter |
| 550 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 551 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 552 | POWER CONNECTION |
| 553 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 554 | Power Transmission Line |
| 555 | ELECTRICAL AND INSTRUMENTATION |
| 556 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 557 | Internal electrificaton of water work campus |
| 558 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 559 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 560 | Chain Pulley 1Tonne |
| 561 | FOR TUBEWELL NO-2 |
| 562 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 563 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 564 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 565 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 566 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 567 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 568 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 569 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 570 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 571 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 572 | Centre guide. M.S.Ring. Of 200 mm size |
| 573 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 574 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 575 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 576 | Logging of Borehole by Electric Logging |
| 577 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 578 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 579 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 580 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 581 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 582 | PUMPING PLANT & CHLORINATING PLANT |
| 583 | SITC of Energy efficient 10 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos 100 mm dia column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve Rate from given SOR Rate of Pump)(1W +1S) |
| 584 | Pressure Transmitter |
| 585 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 100 mm |
| 586 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 587 | POWER CONNECTION |
| 588 | 10 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 589 | Power Transmission Line |
| 590 | ELECTRICAL AND INSTRUMENTATION |
| 591 | SITC of Oil Cooled Servo 20 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 592 | Internal electrificaton of water work campus |
| 593 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 594 | 100 mm dia CE/UL Certified Electromagnetic flow meters |
| 595 | Chain Pulley 1Tonne |
| 596 | Saraiya Part A (Civil) |
| 597 | Construction of 1.3 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing betweentwo pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1) (Boundary Wall(40x30m) - Gates) |
| 598 | Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm thk.around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laiddown in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. |
| 599 | Supplyandfixingof1.2mwideMSwicketgateincluding fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid downin the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in- charge. |
| 600 | ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. |
| 601 | Construction of granular sub base by providing coarse grade materials, spreadingin uniform layers including watering and compaction complete. |
| 602 | Construction of WBM by providing grade materials, spreadingin uniform layers including watering and compaction complete. |
| 603 | Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid mapof existing site enclosed (Drawing no.D-1), including leveling, dressing, excavationandfillingofearth wherenecessaryandalso including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in - charge. |
| 604 | Provisionforinsidesquaredrain including supply of all materials, labour and T & P etc. complete. |
| 605 | Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (2.5x1.8x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications forcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge. |
| 606 | Provide all materials, labour, T&P etc. complete and constructed Bye-pass chamber for pump house ( 1000 (L) x 1000 (W) x 1150 (H) mm ) drawing (drawing no.D-3)andas per thespecifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. |
| 607 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging above ground level with main components, including cost of soil testing and assuming bearingcapacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia.Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming toIS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S.specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats |
| 608 | 50 Kl 12 M Staging |
| 609 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour,T&P etc complete as per instructions of Engineer -in -charge. |
| 610 | Ordinary soil |
| 611 | Mixed soil with Kankar |
| 612 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest /relevant I.S. specifications, suitable for D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing ofpipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in - charge. |
| 613 | 100 mm dia K-7 |
| 614 | Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete asper instructions of Engineer -in - charge. |
| 615 | 140 mm dia HDPE Pipe PN-6: Class PE-100 |
| 616 | 110 mm dia HDPE Pipe PN-6: Class PE-100 |
| 617 | 90 mm dia HDPE Pipe PN-6: Class PE-100 |
| 618 | 75 mm dia HDPE Pipe PN-6: Class PE-100 |
| 619 | 63 mm dia HDPE Pipe PN-6: Class PE-100 |
| 620 | Supply and carting up to site of work of the following dia DI butterfly / sluice valves class I,workingpressure 10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 621 | Sluice valve - 125 mm dia |
| 622 | Sluice valve - 100 mm dia |
| 623 | Sluice valve - 80 mm dia |
| 624 | Scour valve - 80 mm dia |
| 625 | Supply and installation, testing etc. ofsingle/double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, cartingup to site of work and lowering them into the trenches, fixing in position and jointingthem with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 626 | 50 mm |
| 627 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makesiron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxesand insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer -in - charge. |
| 628 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete forproper completion of work as per instructions of Engineer -in -charge. |
| 629 | Sluice valve chamber (masonry Type) |
| 630 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 631 | Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) |
| 632 | Air Valve Chamber |
| 633 | 350 (L) x 350 (W) x 500 (H) mm |
| 634 | Scour Valve Chamber |
| 635 | dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm |
| 636 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T &P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 637 | Design and construct Thrust Block made in Reinforced Cement concrete (1:1.5:3), with graded stone chips (20 mm nominal size) including shuttering and reinforcement, as per technical requirements. |
| 638 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars stirrups binders etc.initial straightning and removal of loose rust ( if necessary)cutting to requisite lenght hooking and bending to correct shape placing in proper position and binding with wire at every inter-section complete asper drawing and direction |
| 639 | Water recharge Mechanism within the water works campus |
| 640 | Dismantling of the followingtype of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 641 | B.O.E. surface |
| 642 | Bituminous surface |
| 643 | Interlocking Road |
| 644 | C.C. Road |
| 645 | Reinstatement of the followingtype of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 646 | B.O.E. surface( 50% of existing bricks to be reused) |
| 647 | Bituminous surface |
| 648 | Interlocking Road |
| 649 | C.C. Road |
| 650 | Provision for following types of Culvert crossing along the alignment of pipe line complete as per instructions of Engineer -in -charge. ( casing of pipe is done by concreting) |
| 651 | Nala/Culvert Crossing ( width -3.5 m) upto Dia 300 mm |
| 652 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground )& average 5 mtr. MDPE Pipe ( 20 mm)( below ground) including specials,saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineeras per Dwg 12( excluding road restoration) |
| 653 | Construction of single tap pillar type stand post as per type design |
| 654 | Flow Control Valve for House Hold Connections |
| 655 | Sign Board for water work campus |
| 656 | Saraiya Part B (E&M) |
| 657 | DC/RC Drilling including hiring transportaion, erection, dismantling with loading and unloading of Rig and assosiated T&P complete in all respect including required all material labour and T&P etc. |
| 658 | 500 mm dia Borehole Drilling up to 100Mtr. Deep using DC/RC technique |
| 659 | 500 mm dia Borehole Drilling from 101 Mtr. To 120 Mtr.Deep using DC/RC technique |
| 660 | 200 mm.. dia. M.S. Plane Pipe thickiness 7.1 mm s per IS 7206 |
| 661 | 200 mm.. dia. M.S. slot Pipe thickiness 7.1 mm as per IS 8110 |
| 662 | 200 mm. dia. M.S.Ring. 150 mm wide x 12 mm Thick |
| 663 | 200 mm. dia. Bail Plug made by 12 mm M.S. Plate |
| 664 | 200 mm. dia. M.S. Clamp made by 12 mm M.S. Plate |
| 665 | 200 mm. dia.Tubewell assembly supporting frame structure fabricated by 150mm× 3 mts long M.S channel. |
| 666 | 200 mm. dia. well Cap made by 12 mm M.S. Plate |
| 667 | Centre guide. M.S.Ring. Of 200 mm size |
| 668 | Lowering of above Tubewell assembly including carting upto site and welding of parts complete in all respect with all required material, T&P, labour, etc. |
| 669 | 200mm.dia. Plain/slotted Pipes from G.L to 100 mbgl |
| 670 | 200mm.dia. Plain/slotted Pipes from 100 mbgl to 108 mbgl |
| 671 | Logging of Borehole by Electric Logging |
| 672 | Supply of 1.60mm to 4.80mm size per gravel duly screened and washed as per IS 4097. |
| 673 | Development of tubewell by 250 PSI compressor as per IS 11189. |
| 674 | Development of tubewell by 250 PSI compressor including Transportation of compressor and its T&P including loading & unloading etc complete,Installation of compressor including leveling & dressing of site and camp equipage,Sodium Hexametaphasphate &Dismantling of compressor after completion of work. |
| 675 | Development of tubewell by 1 cusecO.P. Unit as per IS 2800. |
| 676 | Development of tubewell by 1 cusec O.P. unit.including Transportation of O.P. unit and its T&P including loading & unloading etc complete.,Installation of O.P. unit including leveling & dressing of site and camp equipage & Dismantling ofO.P. unit after completion of work. |
| 677 | PUMPING PLANT & CHLORINATING PLANT |
| 678 | SITC of Energy efficient 5 HPAC Submmercible Pumping plant including Soft Starter with submercible flat cable of suitable length, main piping & valves with 08 nos column pipes, Distance piece for rising main and bypass side, NRV cum pump and Column pipe jointer, power wiring, chemical earthing, painting, wiring of pump house ( internal & external) and installation job of Pumping Plant complete in all respect with all required material, T&P labour complete in all respect for following duties in Grid Powered Applications(Note : Final amount of Pump taken after deduction of Respected size 2 Sluice valve and column pipe Rate from given SOR Rate of Pump)(1W+1S) |
| 679 | Pressure Transmitter |
| 680 | Electrically operated D.I Sluice Valve Metal seated PN 1.0 dia 80 mm |
| 681 | SITC of Electonic type chlorinating dosing system (1W + 1S) with 6 LPH capacity 4kg/cm2 working pressure with 200 litres tank and valves pipes with all required accessories |
| 682 | Soft Starter with Rs485 Port- 400V class, 7.5 KW, Rating |
| 683 | POWER CONNECTION |
| 684 | 7.5 KW ( Three Phase 25 KVA T/F ) Power connection from UPPCL |
| 685 | Power Transmission Line |
| 686 | ELECTRICAL AND INSTRUMENTATION |
| 687 | SITC of Oil Cooled Servo 10 KVAVoltage Stabilizer (150-460 V Range with protection devices for high low voltage cut off, overload protection included oil filling, earthing and power wiring etc) job complete in all respect with all required material, T&P labour. |
| 688 | Internal electrificaton of water work campus |
| 689 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT iwith RTU panel , 7\" HMI screen , surge device including enrgy meter inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. |
| 690 | 80 mm dia CE/UL Certified Electromagnetic flow meters |
| 691 | 3Mtr. Long Column Pipe as per IS 1239 with Necessary packing and nut & bolts etc |
| 692 | Chain Pulley 1Tonne |