| 1 | Making pit for attending cable faults & back filling (1 M X 1M X 1M) |
| 2 | a) Oridinary Soil |
| 3 | b) Kharanja |
| 4 | c) Soft Rock |
| 5 | d) Tarmac /Asphalt |
| 6 | e) Tiled /Cement concrete |
| 7 | f) R.C.C |
| 8 | g) Hard Rock |
| 9 | Recovery of Old Directly buried cables |
| 10 | Up to 50 pairs |
| 11 | 100 pairs /200 pairs |
| 12 | 400 pairs |
| 13 | 800 pair & above |
| 14 | Excavating trenches of A Type Including back filling, compacting (after laying the cable(s)) and removing excess earth from site. |
| 15 | a) Excavation & Refilling of trench per meter for laying of UG Cable of 10 Pairs and above at Depth 1.00 meter and Width of [(0.45+0.30)/2] meter.Pro rata applicable |
| 16 | a) Oridinary Soil |
| 17 | b) Kharanja |
| 18 | c) Soft Rock |
| 19 | d) Tarmac /Asphalt |
| 20 | e) Tiled /Cement concrete |
| 21 | f) R.C.C |
| 22 | g) Hard Rock |
| 23 | Pulling & Laying of Cables |
| 24 | upto 100 prs. |
| 25 | For cables of 200 prs. |
| 26 | For cables of 400 prs. |
| 27 | 800 prs. & above |
| 28 | Road /Rail crossing |
| 29 | Raod /Rail crossing through Horizontal boring method and inserting 65/40 mm dia G.I. pipes and pushing U/G Cable coils inside and drawing 6 mm PP rope |
| 30 | Jointing of Cable of Sizes 5/10/20/50/100/200/400/800/1200/ 1600/ 2000 Pairs - activities are involved- (i) Preparation of cable ends for jointing (ii) Making Joint using UY connector/Modular connectors/ PVC Sleeves (iii) Sealing with Jointing Kit. |
| 31 | 100 Pairs |
| 32 | 200 pairs |
| 33 | 400 pairs |
| 34 | 800 pairs & above |
| 35 | Replacement of faulty Duct Cable |
| 36 | up to 200 pairs |
| 37 | 400 pairs |
| 38 | 800 pairs |
| 39 | 1200 pairs & above |
| 40 | Laying of Half Round RCC Pipe for protection of joints to newly laid cable of 100 Pairs & above, only in cases when the faulty piece is replaced by new cable laid on different route |
| 41 | Replacement of faulty D.P. and re-termination of wires- |
| 42 | Sign writing on D.P. |
| 43 | Replacement of faulty C.T. Boxes with modules - |
| 44 | Replacement of faulty Krone Module of C.T. Box with re-termination |
| 45 | Shifting of pillar due to road widening [Erection of new Pillar with plinth foundation, earthing], including removal of old Pillar, old C.T. Box, small cable pieces, re-leveling of surface, after removal of old Pillar. |
| 46 | A) For Pillars up to 1000 Pairs |
| 47 | B) For Pillars above 1000 Pairs |
| 48 | Shifting of D.P. due to road widening NMC work [Erection of New D.P.] |
| 49 | Erection of new DP 5 pairs |
| 50 | Erection of new DP 10 pairs |
| 51 | Erection of new DP 20 pairs |
| 52 | Termination of cable in pillars-assisting for transfer of Numbers from old pillar to new pillar making T-Joints jumpering and testing of new pillar T cutting & closing joints |
| 53 | Duct |
| 54 | (a)Opening of Man Hole / Hand hole lids of cable ducts |
| 55 | (b) Removal of water / mud, cleaning of duct. |
| 56 | L&W job work |
| 57 | Recovery of Drop Wire faulty/spare |
| 58 | Erection of Post (complete)including digging hole |
| 59 | strengthning of Post |
| 60 | Recovery of post with post material |
| 61 | Rearrangemnt of Drop Wire due to road widening |
| 62 | Repairing of stay |
| 63 | Patrolling of UG Cable Route wherever earth excavation work for water/drainage/sewage pipeline work, road construction work etc carried out by MC/PWD/CPWD/Local Authority/any other agencies. |