Housing Urban and Rular Development Government Departments Closing in 0 days TDR #39042148

Tender For Construction Of New Primary Health Centre Building At Kavanur In Ranipet District.

Issued by Government Departments · uthiramerur, Tamil Nadu
Tender Value
93 Lakhs
Estimated cost
Bid Submission
18 Aug 2023
0 days left
EMD
56500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
uthiramerur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Construction Of New Primary Health Centre Building At Kavanur In Ranipet District.

BOQ

Name of Work: Construction of New Primary Health Centre building at Kavanur in Ranipet District.
Sl. No. Item Description
1Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with with metal box and 6A 1way modularSwitchin flush with wall with suitable modular front plate cover for making good of the concealed portionfor PVC concealedlight point /fan point for Electronic Regulator) (5 Points Per Coil)
2Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with with metal box and 6A 1way modularSwitch in flush with wall with suitable modular front plate cover for making good of the concealed portionfor PVC concealedlight point /fan point for Electronic Regulator) (6 Points Per Coil)
3Wiring with2x1.5sqmm (22/0.3) PVC insulatedunsheathed Sc cu. Conductorof 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories with 3 modular flush type metal box with 3 modular front plate with 6A 3pinmodular socket and with 6A 1 way switch with continuous earth wire connection of 14SWG TC wire and making good of theconcealed portion with suitable color for PVC plug point.
4Supply and fixing of single box type4\"18W LED fitting with TW round blocks on wall or ceilingwith PVC unsheathed copper leads from terminals to the fitting
5Supply and fixing of single box type4\" 18W LED fitting (Orbit make) with suitable Conducitpipe Suspensionand check nuts with TW round blocks on wall or ceilingwith PVC unsheathed copper leads from terminals to the fitting
6supply and fixing of 24W LED 2x2 square type Recessed fitting with LED (Higher end) on false Ceiling with suitable hanging support from ceiling with PVC unsheathed copper leads from terminals to the fitting.
7Supply and fixing of11 watts CFL lamp for BH point
8Supply and fixing of 1200mm (48\") Crompton makeHigh speed AC ceiling fan complete with stepped electronic 100W regulator with 300mm down rod on the existing fan clamp
9Supply and fixing of 300 mm (12\") sweep (light duty) AC exhaust fan complete without provision of hole in the wall
10Supply and fixing of 1 no.6/16A two module socket , 1 no. 16A one module switch with module cover plate (plastic) on suitable module concealed Box (GI ) in flush with wall with connections.
11Supply and fixing of 1 no12 modular metal box with 1 no 12 modulare plate,3 no 6 A switch, 3 no 6Asocket,in flush and makinggoodof the concealed portion for computer plug
12Supply and fixing of 20Amps DP Plug and Socket in sheet enclosure with 32A DP MCB inflush withwallwith earth connection(For AC Plug)[Legrand(MDS)/Hager(L&T)make]
13Supply and Run of 2 of 4 sq.mm. (56/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire and making good of the concealed portion with suitable colour.
14Supply and Run of 2 of 6 sq.mm. (84/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire and making good of the concealed portion with suitable colour.
15Supply and Run of 2 of 10 sq.mm. (140/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with continuous earth wire connection of 14 SWG TC wire with painting of suitable colour.
16Supply and Run of 2 of 2.5 sq.mm. (36/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour.
17Supply and run of 4 of 16 sq.mm (101/0.45) PVC insulated SC unsheathed Cu Conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with continuous earth wire connection by 14 SWG TC wire and making good of the concealed portion with suitable colour
18Supply and Run of 4 of 10 sq.mm. (140/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with continuous earth wire connection by 4 sq.mm. PVC insulated SC unsheathed copper wire with painting of suitable colour.
19Supply and fixing of 12 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 no. 32A DP MCB switch as incoming and 10 nos. 6A to 32A SP MCB as outgoing on wall with earth connection only. Higher end
20Supply and fixing of 8 way 3 phase Vertical type MCCBDB with metal door cover with IP 42 Protection in flush with wall with 1no 63A Four pole MCCB as incoming and 32 and 24 nos 32A SPMCB as outgoing and making good of the concealed portion with earth connection only. The MCBDB and MCB\"s should be with ISI mark(Like Legrand/MDS)
21Supplyand erection of 400 A Capacity dust and vermin proof floor mounting cubical panel board Size (5.0 \"x5.0\"x1.5\")fabricated out of 16 SWG CRCA sheet for outer body ,stifness and doors and with supply and fixing of following interior switches with centre bus bar chamber and vertical now of switches one over the other on both sides of bus bar chamber with cable adapter chamber of the extreme and of both sides with two coats of quality paint over one coat of red oxide primer superscription of incoming and outgoing feeding cable details capacity of switches etc, with white paint and 2 nos metallic danger board affixed complete on base chennel supports to satisfy the latest CEIG rules with the following switches confirming to IS Specification. (DATA-10)1) 400 AFP swicthes disconnector fuse interior only with HRC fuses double break - 1 No (L & T/Siemens) 2)100A TP swicthes disconnector fuse interior only with HRC fuses double break - 2 No (L & T/Siemens)3)63A TP swicthes disconnector fuse interior only with HRC fuses double break - 5 No (L & T/Siemens) 4)200A TP swicthes disconnector fuse interior only with HRC fuses double break - 1 No (L & T/Siemens) A Separate chamber disconnector on the top of one side should be fixed with 0-500V voltmeter ,0-500A Ammeter ,C.T, selector switches with one set LED pilot lamp with HRC fuses. The bus bar chamber should have 4 Nos of 2\" x 1/4 \" tinned copper flat for 3 phases and neutraland 1\" x 1/8 \" tinned copper flat for earth bus must be run all round the panel to provide earth connection to the cubicle
22Supplyand erection of 200 A Capacity dust and vermin proof floor mounting cubical panel board Size (5.0 \"x5.0\"x1.5\")fabricated out of 16 SWG CRCA sheet for outer body ,stifness and doors and with supply and fixing of following interior switches with centre bus bar chamber and vertical now of switches one over the other on both sides of bus bar chamber with cable adapter chamber of the extreme and of both sides with two coats of quality paint over one coat of red oxide primer superscription of incoming and outgoing feeding cable details capacity of switches etc, with white paint and 2 nos metallic danger board affixed complete on base chennel supports to satisfy the latest CEIG rules with the following switches confirming to IS Specification.1) 200 AFP swicthes disconnector fuse interior only with HRC fuses double break - 1 No (L & T/Siemens) 2)63A TP swicthes disconnector fuse interior only with HRC fuses double break - 8 No (L & T/Siemens) A Separate chamber disconnector on the top of one side should be fixed with 0-500V voltmeter ,0-500A Ammeter ,C.T, selector switches with one set LED pilot lamp with HRC fuses. The bus bar chamber should have 3 Nos of 1\" x 1/4 \" tinned copper flat for 3 phases and neutraland 1\" x 1/8 \" tinned copper flat for earth bus must be run all round the panel to provide earth connection to the cubicle
23CT meter box of size 1.25m x 1.0m x 0.23m consisting of 3 chambers 1) meter board with hylem sheet of 12mm thick with ms sheet of size 45cm x 45 cm2)measuring kit consisting accessaries needed by TNEB 3) Bus bar arrangements with 40mm x 6mm tinned copper bar with bus supports, S & F of CT coils of suitable rating as required by TNEB 4)Erection of the box with suitable AI frame work and suitable masanary pedestal 5)Painting and marking 6)2 nos. earthings as per PWD standard
24supply and fixing of 48W LED street light fitting with LED (Higher end) with 32mm dia. GI pipe (class B) with 1 no.32 mm GI bend complete on the existing post/ on wall with PVC unsheathed copper leads with MS clamps and with painting.
25supply and fixing of 65 mm dia. (2 -1/2\") GI pipe (class B) of 6 metre length with 300mm x 300mm x 6mm MS base plate duly welded at the bottom with concreting with construction of masonary pedestal with suitable SMC box with door arrangement to house 6A SP MCB switch, 2/4 way connector on suitable hylem sheet and supply and fixing of 60W LED street light fitting with LED (Lower end) with 1 metre 32mm dia. GI pipe (class B) Complete with suitable MS clamps for LED steet light fitting and SMC box with PVC unsheathed copper leads from SMC box to fitting and with painting of suitable colour.
26Supply and laying of of 2X10sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 mt. Layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good.
27Supply and clamping of of 2 x 10 sq.mm PVC LTUG armoured LTUG cableon post or on wall with MS Clamps.
28Supply and clamping of of 2 x 10 sq.mm PVC LTUG armoured LTUG cable through GIpipe on post or on wall with MS Clamps
29Supply and clarnping of 31/2X25sq.mm PVC LTUG armoured LTUG cableon post or on wall with MS Clamps.
30Supply and fixing of brass cable gland for 3 1/2 x 25sqmm PVC armoured LTUG cable with earth connection
31Supply and providing cable end termination of 31/2 X25Sqmm PVC LTUG Alu.armoured cable with necessary alu.cable sockets by crimping etc with electrical connection complete
32supply and laying of of 31 /2X185 sq.mm PVC armoured LTUG cablein a trench to be excavated at a depth of 0.75 metre putting 0.15 mt. Layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good.
33Supply and clarnping of31/ 2 x 185 sq.mm PVC LTUG armoured LTUG cable on post or on wall with MS Clamps.
34Supply and fixing of brass cable gland for 3 1/2 x 185 sqmm PVC armoured LTUG cable with earth connection
35Supply and providing cable end termination of 3 1/2 x185sqmm PVC LTUG Aluminium armoured cable with necessary aluminium cable sockets by crimping etc. with electrical connection complete
36supply and laying of of 31 /2X120 sq.mm PVC armoured LTUG cablein a trench to be excavated at a depth of 0.75 metre putting 0.15 mt. Layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good.
37Supply and clarnping of 31/ 2 x 120 sq.mm PVC LTUG armoured LTUG cable on post or on wall with MS Clamps.
38Supply and fixing of brass cable gland for 3 1/2 x 120 sqmm PVC armoured LTUG cable with earth connection
39Supply and providing cable end termination of 3 1/2 x120 sqmm PVC LTUG Aluminium armoured cable with necessary aluminium cable sockets by crimping etc. with electrical connection complete
40Supply and run of 25mm x 6mm tinned copper flat with necessary clamps / supports on wall / floor / ground for earth connection
41Design, Supply Installation, testing and commissioning of 5.5 TRnominal capacity ceiling suspended Ductable Air conditioner with theFollowing components.a)5.5 TR capacity ceiling suspended Ductable Air Conditioner high tech,low height, low noise level indoor unitwith fin and tube type cooling coil,Detachable type drier provided inrefrigerant circuit to reduce moisturecontent multi stage type distributorfor feeding equal quantities of theRefrigerant mixture to all the section ofthe coil, with required valves, directlycoupled blower to reduce troubles andwear & tear compared to belt driveBlower. Thermostatic expansion valve arrangement, lift and pull type aluminium framed durable, washable air filter, Integrated electrical panel with complete microprocessor control with display for easyoperation and maintenance of unit common operating conditions of 45 F suction temperature Auto reset type HP/LP safety cut sensor type to improve Reliability of compressor. stenersimported condenser fan & fan bladesto be statically and dynamicallybalanced to reduce noise andVibration. The fans are direct driven3phase motor with protection.Condensing temperature 130’f for thesystem operations. Refrigerant Compressor – Scroll, No of Compressor – 1No, Refrigerant – R22, Power supply – 415V/3Ph/50HZNo of Fan – 1Nos, Types of Mounting – Rubber mounts with sleeve.
42Supply and filling of R-22 Refrigerant Gas.
43Supply & fixing of hard drawn copper Refrigerant piping of suction line of Size 1 1/8” inches with necessary fitting and clamp etc.
44Supply & fixing of hard drawn copper Refrigerant piping of liquid line of size 5/8” inches with necessary fitting and clamp etc…
45Supply and fixing of flexible canvas connection between indoor unit and ducting and rubber pads, with ceiling Support angle rods etc.
46Supply and fixing of suitable MS angle frame if required necessary catwalk / Base frame for mounting the outdoor units for protection from the rain water with dust flow on the open trace / corridor Floor area
4722 G
4824 G
49Supply and Providing Thermal Insulation of 9mm thick–XLPE with aluminium foil./ Nitrile Rubber insulation
50Supply and providing acoustic lining for initial portion of ducting with 10mm thickXLPE insulation.
51Supply, fabrication and fixing of Volume control dampers individually across the duct
52Supply and fixing of powder coated Extruded aluminium supply air grilles/diffuser with MS volume control damper for supply.
53Supply and fixing of 1 inch PVC water drain pipe line on wall with suitable Clampas required.
54Towards charges for welding, leak testing, Nitrogen pressure testing, pressure holding, vaccummising, dehydration and other related works etc.
55Supply, fabrication and fixing of suitableangle support frame for ceiling mounted the Indoor Units.
56Supply and providing of pipeline nitral rubber insulation for section line Refrigerant pipe as required.
57Supply & providing of Power supply for MCB to Outdoor unit with 4 core 10 sq.mm copper flexible cable
58Supply & providing of control supply for Outdoor unit to Indoor unit HP and LP cut-outs with 7 core 2.5sq.mm copper flexible cable
59Supply and erection of 2.0 TR capacity 3 Star high wall mounting Split Air –conditioner conditioning to IS 1391 (part-2) 1992 with amendmentNo.1 except power consumption (norms)fixed with hermetically sealed compressor operation R 22 Non CFC for wall mounting with minimum guaranteed cooling capacity and maximum power consumption suitable for operation on 230 Volt , 50 Hz, Ac power supply complete performing following functions. (1) Cooling (2)De-humidifying, (3)Air circulating (4)Filtering
60Supply and erection of 1.5 TR capacity 3 star high wall mounting Split Air –conditioner conditioning to IS 1391 (part-2) 1992 with amendmentNo.1 except power consumption (norms)fixed with hermetically sealed compressor operation R 22 Non CFC for wall mounting with minimum guaranteed cooling capacity and maximum power consumption suitable for operation on 230 Volt , 50 Hz, Ac power supply complete performing following functions. (1)Cooling (2)De-humidifying, (3)Air circulating, (4)Filtering,
61Supply and fixing of5KVA wall mounting type Automatic voltage stabilizer with time delay arrangements suitable for operation at 230 Volt, 50 Hz, AC power supply
62Supply and fixing of4KVA wall mounting type Automatic voltage stabilizer with time delay arrangements suitable for operation at 230 Volt, 50 Hz, AC power supply
63Supply and fixing of suitable MS angle iron frame work support to theoutdoor unit
64Renewal by supply and laying of 5/8” & 3/8” copper with 3 core cord wire and insulation etc.
65Supply and fixing of 63 A TPNMC switch on suitable angle iron frame work with MS cable entry box with earth connection only.
66Supply, Testing Commissioning and Handing over of 1no 100 KVA Diesel Generator set(Make Kirlokar/Asoke Leylend/Cummins) of 0.8 PF 3 Phase 415V/420volts,50C/S 1500 RPM CPCB Approved capacity compressing ofDeveloping 156BHP Water cooled clock wise rotatingwith 100 KVA / 80KW operating capacity Brush Less Alternator close coupled underneath fuel tank ,standard safeties, LLOP With stop solenoid, battery with lead, Electric start andAnti Vibration mountings and accessories and AMF control panel as detailed below including transporting and Unloading charges (A) ENGINE: Water cooled diesel engine suitable for Generator application with a shaft output of 156 BHP 1500 RPM under NTP condition. The Engine Shall Comprise the following standard fitting flexible coupling, fly wheel, air cleaner, fan blower radiator, water pump, fuel filter and lubricatingoil filter etc (B) 12/24 Volt Electronic Starting EquipmentComplete with Starter motor dynamo standard batteries with cable flexible exhaust piping of 50cms Length (C) Engine Instrument Panel/Mounted Starting push button /starting key lubricating oil temperature gauge lubricating oil pressure gauge water temperature gauge safety controlfor low lubricating oil pressure, safety control for high water temperature safety control for over speed,
67Hour meter (mechanical) and RPM indicator battery charging ammeter. The engine shouldbe cabable of providing 10% over load for one hour for every 11hours continous run at full load D.ALTERNATOR:100 KVA /80 KW Capacity Brushless Alternator AC 3phase 50c/s 415/420V 0.8PF 1500 RPM under NTP conditions conforming to IS 13364 (part-II) 1992 to be means of coupling E.AMF CONTROL PANEL.The AMF control panel cubical should be fabricated with vermin proof and duct proof best quality sheet steel and floor mounted with removable rear panels and hinged front door with enamel paint and incorporating the following suitable provisions for connecting incoming and out going leads havingbeen made on the control panel 1) AC Ammeterandselector switch, 2) Voltmeterand selector switch, 3) 3 Nos current Transformer with suiatable ratio, 4)Frequency meter, 5) KWH meter, 6)1 No. Power factor meter, 7) Battery charging set comprising of the following for charging the battery from mains a) Transformer/Rectifier, b) DC Ammeter, c) DC Volt meter, d) ON/OFF switch, e) Charging rate selector switch, f) push botton start, g)push botton stop, h)push botton reset, 8) 1 set Air - break contactor with auxilary neutral contactor for main supply, 9) 1 set low voltage HRC fuse for short circuit protection of the main supply, 10) 1 set Air breakcontactor with auxiliary neutral contactor for Alternator Supply,
6811) 1 set three pole bimetal release for over load protection of alternator, 12) 1 set low voltage HRC fuse for the short circuit protection of the alternator, 13) 1 set DC control relay incorporating engine start/stopand failure to start/lock out, 14) 1 set selector switch auto/manual, 15) 1 NO push botton start, 16) 1 NO push botton stop, 17 ) 1 NO. push botton reset, 18) 1 No. signal lamp for indicating load ON main, 19) 1 No.signal lamp for indicating load ON set, 20)1 No.signal lamp for indicating fails to starts, 20)1 No.signal lamp for indicating fails to starts, 21) 1 No.signal lamp for indicating set running, 22) 1 No.signal lamp for indicating bettery charger ON, 23) 1 set pilot lamp of 3 Nos, 24) MCCB of suitable capacity with magnetic over load release, instant short circuit, 25) Rectangular copper bus bars (1 No. for each phase , neutral and earthing terminal) of adiquate capacity duly colour coded with heat shrinkable PVC sleaves, 26) 1 No. mains voltage monitor, 27) Hooter/Audio alarm for indication set fails to start and for DG O/L, 28) 1 set timer, 29) Audio visual indicator arrangements for a)low lubricating oil pressure, b) High water temparature,c) Over speed, 30) 1 No. earth fault relay, 31) Isolator to isolate the neutral
69Note: 1. The Control panel should be complete with necessaryfuses , cables , lables, other accessorries withneutral isolation arrangements, 2. The engine should trip for the following conditions a) Low lubricant pressure, b) High water temparature, c) Over speed, (F)Fuel tank : Fuel tank of 290 litrs a Capacity and with Inlet and Outlet connections levelindicatorwith scale etc., (G) BASE FRAME:The Base frameshould be Fabricated MS channel frame of rigidly welded constrution for mounting of Generator set. The Engine and Alternatorshould be coupled by suitably designed diaphragmtype flexiblecouplingwith guard and mounted on the base frame with proper alignment, (H) ACOUSTIC ENCLOSURE :The Acoustic enclosure self standing weather proof KG - CPCB typed Acoustic canopy KG100WS floor mounting type with modular construction with the provision to assemble and dismantleeasily and designed to suit all weather conditions . Erection of Acoustic enclosure suitable 100 KVA Diesel Generator complete with all accessories as above and suitable supports etc, 1). Supply of manuals forOperation & Maintanence of DG set with Warrantycardetc …
70ERECTION OF GENSET : Providing suitable concrete foundation with cement concrete 1:2:4 with sand cushion all around the foundation erection of 100 KVA Generatorset over the existing foundation and erection of generator set with proper alignment over the existing foundation to suit 100 KVA Genset foundation size L 4000 mm x w 1150 mm x H 1200 mm
71Supply and installation of Exhaustpiping of sufficient length with suitable M.S pipe so as to extend outside the generator with necessary thermal insulation
72Supply and run of 25mm x 3mm tinned copper flat with necessary clamps / supports on wall / floor / ground for earth connection (Generator + Panel)
73Preparation of site plan, physical layout, electrical line schematic diagram in 10 sets. Getting drawing approval from CEIG, preparation of completion report, rectification report and arranging CEIG’s inspection and obtaining safety certificate. Preparation of one set of approved drawing and a copy of safety certificate in a neat frame work to be fixed in the generator room – 1set.
74Supply and laying of 12 core x 2.5 sq.mm PVC coppercable in a trench to be excavated at a depth of 0.75 metre covering the cable completely through suitable G.I. pipe and refilling the earth to make good
75Supply and clamping of 12 core x 2.5 sq.mm PVC copper cable on post or on wall through suitable G.I. pipe with M.S. clamps.
76Providing fuel to run the DG set for 8 hours full load testing and Commissioning.
77Supply and fixing of 100A FP MCCB in flush with sheet enclosure in wall with earth connection[Legrand (MDS) / Hager (L&T) make] (X-Ray)
78Supply and fixing of 400 Amps TPN Switch with HRC Fuses Sheet Steel Double Break on suitable angle iron frame work with trunking box and with earth connection.
79Supply and installation maintenance free GI Earthing system comprising of 50 mm dia and 2 mtr long earth electrode of low carbon steel rod with 100 micron bonding and 25kgs of carbon based environment friendly backfill compound and suitable clamp (chemical Earthing)
80Earthing as per the ISI specification with an earth electrode of 2.10 metre Class \"B\" GI pipe of dia not less than 40mm with copper earth plate of size 125mm x 50mm x 6mm with necessary funneling arrangements with necessary masonry work and with 38mm RCC cover slab for the brick masonry
81Supply and Run of 1 of No.8 SWG copper wire in suitable PVC rigid pipe on wall / floor / ground for earth connection
82Supply and fixing of 10 KVA Single phase UPS with 1 hour battery backup. (Three phase IN & single phase OUT)
83SUB TOTAL
84GST @ 18 %

AI Tender Summary

OUR REF NO 39042148
AUTHORITY Government Departments
TENDER VALUE 93 Lakhs
LAST DATE 18-08-2023
Authority
Authority Name Public Works Department
Work Description Tender For Construction Of New Primary Health Centre Building At Kavanur In Ranipet District.
Basic Detail
Tender No 4/VLR-CLE/23-24/DT.20.07.23
Bidding Type Tender
Location
City uthiramerur
State Tamil Nadu
Key Dates
Publish Date 08 Aug 2023
Submission Date 18 Aug 2023
Open Date 18 Aug 2023
Finance
Tender Value 93 Lakhs
Tender Fee Ref. Documents
EMD 56500
Exemption Not Available
Document List
0ba5ed3a-648f-4309-ac22-5a7a4e4d91e9.html
BOQ_425145.xls
Condition-Ele-GH-Uthirame.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 08, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 18, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 18, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

0ba5ed3a-648f-4309-ac22-5a7a4e4d91e9.html

xls

BOQ_425145.xls

pdf

Condition-Ele-GH-Uthirame.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders