New Town Kolkata Development Authority-NKDA has published Maintenance Of Arboriculture Of Nazrul Tirtha Sishu Uddyan, Around New Town Plaza & Solar Power Plantat New Town Kolkata, ( For 01 Year. Submission Date for this Tender is 22-08-2023. Horticulture Tenders in kolkata West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Maintenance of lawn including regular weeding, watering, application ofmanure, spraying of different pesticides, insecticide, dewatering & shearing of lawn, replacement of dead patches, gap and earth filling/sand filling (if required) dressingetc. all complete as per direction of E.I.C. |
2 | Maintenance of hedge & edge including regular weeding, watering, application ofmanure, spraying of different pesticides, insecticide, trimming (as per required), replacement of dead patches, gap and earth filling/sand filling (if required) dressingetc. all complete as per direction of E.I.C. |
3 | Mowing of ground, as and when instructed under detailed supervision of the department and instruction of E.I.C. by deployingmowing machine including machinery, labour, cost of fuel, lubricant all included, cleaning the ground and removal of cut off grass (two time inevery month) from the ground etc. all complete as per direction of the E.I.C. |
4 | Supply of pesticides, insecticides, manure as and when required to maintain the plants, lawn and trees etc.complete as per direction of E.I.C. |
5 | Spreading of sludge, dump manure/farm yard manure/animal dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials. ( Flower bed). |
6 | Preparation and Maintenance of seasonal flower bed including supply and plantation of new flower plants, regular de-weeding ,watering, application of manure fertilizer, spraying of different pesticides training and staking ,application of folair nutrients, removal of dead leaves and plant, replacement of dead plants etc. all complete. Before planting the next crop of seasonal flowers the beds are to be dug up to 30cm deep and roots ,stems of pervious crop removed. the excavated earth is to be placed on the side of the bed. Fresh manure is to beaded and the soil refilled back after drying for 3/4 days(except during rains)and seasonal flower of particular section be planted in every season all complete as per direction of EIC. |
7 | Washing and cleaning with soap water and rubbing with oil cloth in all types of floor and dado. |
8 | Cleaning glazed tiles with acid. |
9 | Cleaning E.P. or Anglo-Indian W.C. with acid. |
10 | Cleaning urinal with channel with acid. |
11 | Supplying, fitting & fixing of various sanitary plumbing related items i.e. CPVC/UPVC pipes at various dia, wash basin, W.C, PVC Connector, flushing pipe, waste pipe, PVC water tank, bib/stop cock, angular stop cock etc. of approved quality & as per requirement and direction of EIC as and when required, including necessary all accessories complete. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail