|
| 1 | Construction of cement concrete Drainage with Filter at Pudhuppattinam AD street in PudhuppattainamPanchayat ( 119 m ) |
| 2 | Earth work excavation in all class of Soil except hard rock requiring blastingwith intial lead and lift etc. Complete for foundation as per SS 20B. |
| 3 | Supplying and filling with Good Quality M.sand including Cost and conveyance, labour charges etc, Complete., |
| 4 | C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete. |
| 5 | Supplying and and erection of steel centering using mild steel sheetsincluding Cost and conveyance, labour charges etc, Complete., |
| 6 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor bed blocksfor10 cum |
| 7 | Plastering with cement morter 1;4 mix 20mm thick inludingcost and conveyance etc. |
| 8 | SUB ESTIMATE VERTICAL FILTER |
| 9 | Drilling borewellanywhere in tamuilnadu including transportatio from one place to anothere with in tamilnadu in alluvial soiletc, |
| 10 | cost and supply of special Blue slotted Pvc pipes for borewell |
| 11 | cost and supply of Pvc End cap |
| 12 | Earth work excavation in all class of Soil except hard rock requiring blastingwith intial lead and lift etc. Complete for foundation as per SS 20B. |
| 13 | supply and filling in basement with fillter river sand in layer of not more than 15 cm thick well rammed etc, |
| 14 | C.C.(1:4:8) Mix using 40 mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete. |
| 15 | C.C.(1:3:6) Mix using 20 mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete. |
| 16 | Supplying and and erection of steel centering using mild steel sheetsincluding Cost and conveyance, labour charges etc, Complete., |
| 17 | Filling the soak pit 40mm metal / Boulders Following material as per specification etc . Complete . |
| 18 | Filling the soak pit 20 mm metal / Boulders Following material as per specification etc . Complete |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |