Infrastructure Development Of Tribal Area-Tourism Sector At Kareng Chapori, Jonai => Limited, jonai-Assam

Department of Welfare of Plain Tribes & Backward Classes has published Infrastructure Development Of Tribal Area-Tourism Sector At Kareng Chapori, Jonai => Limited. Submission Date for this Tender is 08-08-2023. Paver Blocking Tenders in jonai Assam. Bidders can get complete Tender details and download the document.




Tender Notice

38964158
Infrastructure Development Of Tribal Area-Tourism Sector At Kareng Chapori, Jonai => Limited
Limitted
Indian
Assam
jonai
08-08-2023

Tender Details

Infrastructure Development Of Tribal Area-Tourism Sector At Kareng Chapori, Jonai => Limited- 1 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means In Foundation Trenches Or Drains ( Not Exceeding 1.5 M In Width Or 10 Sqm On Plan ) , Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. 2 Dry Brick Pitching Half Brick Thick In Drains Including Supply Of Bricks And Preparing The Surface Complete:With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 3 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:3:6 ( 1 Cement : 3 Coarse Sand ( Zone-Iii ) : 6 Graded Stone Aggregate 20 Mm Nominal Size ) 4 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For :Foundations, Footings, Bases Of Columns, Etc. For Mass Concrete 5 Lintels, Beams, Plinth Beams, Girders, Bressumers And Cantilevers 6 Columns, Pillars, Piers, Abutments, Posts And Struts 7 Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level :1:1.5:3 ( 1 Cement : 1.5 Coarse Sand ( Zone-Iii ) : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 8 Half Brick Masonry With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 In Foundations And Plinth In :Cement Mortar 1:3 ( 1 Cement : 3 Coarse Sand ) 9 20 Mm Cement Plaster Of Mix :1:4 ( 1 Cement: 4 Fine Sand ) 10 Excavating, Supplying And Filling Of Local Earth ( Including Royalty ) By Mechanical Transport Upto A Lead Of 5Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. 11 Surface Dressing Of The Ground Including Removing Vegetation And InEqualities Not Exceeding 15 Cm Deep And Disposal Of Rubbish, Lead Up To 50 M And Lift Up To 1.5 M. 12 Providing And Fixing M.S. Grills Of Required Pattern In Frames Of Windows Etc. With M.S. Flats, Square Or Round Bars Etc. Including Priming Coat With Approved Steel Primer All Complete.Fixed To Openings / Wooden Frames With Rawl Plugs Screws Etc. 13 Providing And Laying Factory Made Chamfered Edge Cement Concrete Paver Blocks In Footpath, Parks, Lawns, Drive Ways Or Light Traffic Parking Etc, Of Required Strength, Thickness & Size / Shape, Made By Table Vibratory Method Using Pu Mould, Laid In Required Colour & Pattern Over 50Mm Thick Compacted Bed Of Sand, Compacting And Proper Embedding / Laying Of Inter Locking Paver Blocks Into The Sand Bedding Layer Through Vibratory Compaction By Using Plate Vibrator, Filling The Joints With Sand And Cutting Of Paver Blocks As Per Required Size And Pattern, Finishing And Sweeping Extra Sand. Complete All Asper Direction Of Engineer-In-Charge:60Mm Thick Cement Concrete Paver Block Of M-35 Grade With Approved Colour, Design & Pattern 14 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level.Mild Steel And Medium Tensile Steel Bars 15 Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade :New Work ( Two Or More Coat Applied @ 1.67 Ltr / 10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 2.20 Kg / 10 Sqm ) 16 Finishing Walls With Water Proofing Cement Paint Of Required Shade :New Work ( Two Or More Coats Applied @ 3.84 Kg / 10 Sqm ) 17 Applying Priming Coat:With Ready Mixed Red Oxide Zinc Chromate Primer Of Approved Brand And Manufacture On Steel Galvanised Iron / Steel Works 18 Steel Work Welded In Built Up Sections / Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer Using Structural Steel Etc. As Required.In Gratings, Frames, Guard Bar, Ladder, Railings, Brackets, Gates And Similar Works 19 Circular Swing 20 Double Swing 21 Slide 22 2 Seater See Saw 23 Cost Of Agency Charge

Key Value

Document Fees
INR 1500 /-
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Infrastructure Development of Tribal Area-Tourism Sector at Kareng Chapori,Jonai
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete:With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
4Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
5Lintels, beams, plinth beams, girders, bressumers and cantilevers
6Columns, Pillars, Piers, Abutments, Posts and Struts
7Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
8Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :Cement mortar 1:3 (1 cement : 3 coarse sand)
920 mm cement plaster of mix :1:4 (1 cement: 4 fine sand)
10Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
11Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
12Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings /wooden frames with rawl plugs screws etc.
13Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge:60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern
14Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
15Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
16Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm)
17Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
18Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
19Circular Swing
20Double Swing
21Slide
222 Seater See Saw
23Cost of Agency Charge
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail