|
| 1 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking various capacities up to 25 KVA |
| 2 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking63 KVA to 100 KVA |
| 3 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking 250 KVA and above |
| 4 | Loading /Unloading of Metering Sets from Lorry to the Stores Yard and Stacking Various capacities in 11KV and 33 KV |
| 5 | Unloading of Conductor drum from Lorry, leading and stacking yard |
| 6 | Leading of Conductor drum to Lorry leading point and loading |
| 7 | Uncoiling the Conductor drum, bundling and transporting to weighing scale weighing and transporting to godown and stacking |
| 8 | Loading/Unloading of RS Joists Materials |
| 9 | Loading/Unloading of Iron & Steel Materials |
| 10 | Lifting, Leading to Weighing Scale, Weighing & Stacking of Iron & Steel Materials |
| 11 | Loading/Unloading of Line Materials ( Structure Materials, X-Arm, Stay Set, G.I Wire, Stay Wire, Earth Pipe, Bolt&Nut, G.I Pin etc ) |
| 12 | Loading/Unloading of 1phase, 3phase Meters,CMRI,HHD etc |
| 13 | Loading/Unloading of HT Metering Box , LTCT Metering Box & Battery Charger |
| 14 | Loading /Unloading of chokes, LTCT\"s, LT LAS, Fuse Unit,Hut Service Kit and Other Items with Individual Packing |
| 15 | Loading/Unloading of L.T Pin Insulators, Guy Shackle, L.T Shackle and verification |
| 16 | Loading/Unloading of Crates with 11/22/33 KV Disc, 11/22/33 KV Pin Insulators verifying and stacking |
| 17 | Loading/Unloading & Stacking of Oil drums with Oil |
| 18 | Loading/Unloading & Stacking of Paint Container with Paint |
| 19 | Loading/Unloading of L.T Open Type fuse unit 11/22 KV H.G Fuse Set |
| 20 | Unpacking,Verifying, Counting and repacking, Stacking of Meters, CMRI,HHD,LAS, Chokes, Fuse Unit and Others |
| 21 | Unpacking, Verifying, Counting and repacking, Stacking of Insulators, G.I Pin, Hardware and Others |
| 22 | Loading/Unloading of all size of Tyres, LT/HT, Trivector Meters, Inoor C.T and Stacking |
| 23 | Lifting, Leading to Weighing Scale, Weighing , Releading to Stacking Point and Stacking of all Scrap Materials including Copper, Aluminium etc |
| 24 | Unloading of all kinds of Scrap from Lorry, Weighing and Stacking |
| 25 | Loading of all kinds of Scraps to Lorry |
| 26 | Unpacking, Verifying and Repacking, Stacking of M.S Bolt & nut and Others |
| 27 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 2.65 Sq.mm & 6.00 Sq.mm,50 Sq.mm and Others |
| 28 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 50,95,120 Sq.mm and others |
| 29 | Loading/Unloading & Stacking of PVC Cable - 2.65 Sq.mm, 6.00 Sq.mm and 25 Sq.mm |
| 30 | Loading/Unloading & Stacking of PVC Cable - 50 Sq.mm, 95 Sq.mm and 120 Sq.mm |
| 31 | Loading/Unloading & Stacking of 11 KV/33 KVAB Switch Double Pole |
| 32 | Loading/Unloading of Stationary Items at Transport Lorry Bundles upto 30 Kgs |
| 33 | Loading/Unloading of Stationary Items at Transport Lorry Bundles from 30 to 50 Kgs |
| 34 | Loading/Unloading of Stationary Items at Transport Lorry Bundles above 50 Kgs |
| 35 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles Upto 30 Kgs |
| 36 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles from 30to 50 Kgs |
| 37 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles above 50 Kgs |
| 38 | Loading/Unloading of Empty Drums - Wooden Drum |
| 39 | Loading/Unloading of Empty Drums - Steel Drum |
| 40 | Loading/Unloading of Shunt Capacitor |
| 41 | Unpacking of Gunny Bags,Verifying & Stacking of SEC Wires, SEA Alu. Wire upto 30 Kgs |
| 42 | Unpacking of Gunny Bags,Verifying & Stacking of TC Fuse Wires |
| 43 | Unpacking, Counting, Verifying and Stacking of numbered Lead ( 100 Nos/Shell ) |
| 44 | Loading/Unloading & Stacking of Cables in Wooden Drums |
| 45 | Loading/Unloading & Stacking of Cables in Steel Drums |
| 46 | Loading/Unloading of AC Panel/C&R Panel and all panels |
| 47 | Loading/Unloading of 110V Battery set |
| 48 | Loading/Unloading of110V Battery charger |
| 49 | Loading/Unloading of FRB Pillar box |
| 50 | Loading of V Trough |
| 51 | Unloading and Stacking of V Trough |
| 52 | Loading/Unloading & Stacking of Straight Joint/End Termination Kit |
| 53 | Loading/Unloading & Stacking of 3x400 Sq.mm UG Alu.Cable |
| 54 | Loading/Unloading & Stacking of 4x240 Sq.mm UG Alu.Cable |
| 55 | Loading/Unloading & Stacking of LT UG Cable 16 Sq.mm |
| 56 | Loading/Unloading & Stacking of LT UG Cable 120 Sq.mm |
| 57 | Loading/Unloading Outdoor CT/PT and Indoor CT/PT |
| 58 | Leading, Weighing and Stacking of Transformer Oil Drums |
| 59 | Loading/Unloading ofSingle Pole AB Switch Vertical Type Complete & 33 KV Centre Rotating Switch |
| 60 | Loading/Unloading, Stacking GI Earth Pipe 40 mm 10\" Long |
| 61 | Loading/Unloading , Stacking Batterry, Computer, Printer, UPS |
| 62 | Loading/Unloading, Stacking SMC Box & Pilfer Proof Box |
| 63 | Loading/Unloading, Stacking of 33 KV 1 x630 Sq.mm UG Alu.Cable |
| 64 | Loading/Unloading, Stacking of Earth Rod 4\" |
| 65 | Loading/Unloading, Stacking of Earth Rod 10\" |
| 66 | E.S.I. @3.25 % should be Entered by the Bidder |
| 67 | EPF 13.36% for labour charges |
| 68 | G.S.T. @12% should be Entered by the Bidder |