Town Panchayats-TP has published Tender For Strengthening Of Bt Road At Ward No.5 Thottiyapalaym Samathuvapuram To Noyyal River Roadin Muthur Town Panchayat. Submission Date for this Tender is 10-08-2023. Road Work Tenders in muthur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38922415
Tender For Strengthening Of Bt Road At Ward No.5 Thottiyapalaym Samathuvapuram To Noyyal River Roadin Muthur Town Panchayat
Open Tender
Indian
Tamil Nadu
muthur
10-08-2023

Tender Details

Strengthening Of Bt Road At Ward No.5 Thottiyapalaym Samathuvapuram To Noyyal River Roadin Muthur Town Panchayat. 1 Earth Work Excavation For Foundation And Depositing On Bank With In The Initial Lead Of 10M And A Lift Of 2M In Hard Stiff Clay, Stiff Block Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Etc. Complete. Complying With Std. Specifications.Ss 20 B 2 Providing And Laying, Spreading And Compacting Graded Stone Aggregates To Wet Mix Macadam 250Mm Thick Specification Including Premixing The Materials With Water At Omc In Mechnanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers With Pavers In Sub Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Acheive The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 406 Of Morth 3 Providing And Laying Prime Coat Over Wbm / Wmm Surface Using 7Kg Of Emulsion Bitumen ( Ssi ) Per10 Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 502 Of Morth Rev-5 4 Providing And Laying Tack Coat Over Wbm / Wmm Surface ( Treated With Primer ) Using 2.50 Kg Of Bitumen Emulsion ( Rs1 ) Per10 Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 503 Of Morth Rev-5 5 Providing And Laying Tack Coat Over Existing B.T Surface Using 2.00 Kg Of Bitumen Emulsion ( Rs1 ) Per10 Sqm For Prparatory To Another Bituminous Construction Over It, Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 503 Of Morth Rev-5 6 Providing And Laying 50Mm Consolidated Thick Dense Bituminous Mecadam Using 0.24 Cum Of 26.50 – 13.20 Mm Graded Metal And 0.25 Cum Of 13.20 – 2.36 Mm Grade Metal And 0.23 Cum Of 2.36 Mm & Below With 53.20 Kgs Of 60 / 70 Grade Bulk Bitumenfor Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 50 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 505 Of Morth Rev-5 7 Providing And Laying Bituminous Concrete 40Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm, 0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 45.27 Kgs Of 60 / 70 Grade Bulk Bitumen And -5.03 Kg Of Shredded Plastic Waste For Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 40 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5

Key Value

Document Fees
Refer document
EMD
INR 39000.0 /-
Tender Value
INR 39 Lakhs /-

BOQ Items

Name of Work: Strengthening of BT road @ ward no.5 Thottiyapalaym Samathuvapuram to Noyyal River roadin Muthur Town Panchayat
Sl. No. Item Description
1Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
2Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per clause 406 of MORTH
3Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI)per10 sqm for preparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
4Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1)per10 sqm for preparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
5Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1)per10 sqm for prparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
6Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumenfor premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
7Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and -5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail