Rural Development Department has published Tender For Strengthening And Black Toping Of Wakadi - Goradkheda-Vadgaon- Dhalsingi To District Border Road (Odr 41) With Water Disposal Work 10/200 To 12/200. Submission Date for this Tender is 20-09-2023. Road Work Tenders in jalgaon Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 28-Aug-2023 | Extende for Second Call | Date | 11-09-2023 |
2 | 13-Sep-2023 | Extend for 3rd Call | Date | 20-09-2023 |
Sl. No. | Item Description |
1 | Item No 1 Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. By Manual Means. ( Item used only when Quantity is below 10 Cu.m.) . . ..(SSRItem 86 ) |
2 | Item No 2 Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. . . ..(SSRItem92 ) |
3 | Item NO 3:- Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). .(SSR Item 1769) |
4 | Item NO 4 :- Supplyingtrap/granite/quartzite/gneissstonemetalofrequiredsizebybringingtheboulders/Rubbleattheroadsidebreakingthemtorequiredgradationincludingconveyingtheboulders/Rubbleandstackingthebrokenmetaletc.complete.(PriorapprovalofsamplestackofbrokenmetalbytheEx.Engineerisnecessarythedateofapprovalwillformpartofthemeasurements)a)40mmMetal, By breaking Boulders (Hand broken). {( SSR I-1770 ) |
5 | Item no-5 :- Supplying soft murum at the road site, including conveying and stacking complete {( SSR I-103 ) |
6 | Item No 6:- Supplying hard murum/ kankar at the road site, including conveying and stacking complete. (DSRI-102 ) |
7 | Item No 7:- Spreading hard murum for side width etc. complete (DSR I- 104) |
8 | Item No 8 :- Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. {I - 105} +RA |
9 | Item NO 9 :- Spreading80/40mmmetalforroadworkincludingsectionongetccomplete as directed by Engineer in charge {( SSR I-1771 ) |
10 | Item NO 10 :- Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. {( SSR I-1772 ) |
11 | Item NO 11 :- Compactingthesubgrade/gravel/sizemetal(100mmloose)layersforallwidthswithPowerrollerhavingweight8to10MT.includingnecessary, labour, materials and artificial watering complete. {( SSR I-1774 ) |
12 | Item NO 12 :- Providing and constructing 75 mm. thick ModifiedPenetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubbleobtained by blasting) heating and spraying thebitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete.Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
13 | Item No 13:- Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates){SSR I-167) |
14 | Item No 14:- Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified gradepreparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) {SSR I-160) |
15 | Item No 15 :- Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) (SSR-I- 141) |
16 | Item no 16Providingsoling using80mm sizetrapmetalin15cm.layerincludingfilling voidswith Crushed sand/grit, ramming, watering etc. complete. |
17 | Item no 17ProvidingandlayingCastinsitu/ReadyMixcementconcreteinM-10oftrap/granite/ quartzite/gneissmetalforfoundationandbeddingincludingbailingoutwater,Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided,finishingifrequiredandcuringcomplete,withfullyautomaticmicroprocessor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete.With fine aggregate (Crushed sand VSI Grade) |
18 | Item no 18 ProvidingandlayinginsitucementconcreteM20withtremixtreatmentfor100mm thicknessforflooringwithgroovecuttingof4mmwideand20mm deepwithnecessary refilling with bitumenetc. complete. |
19 | ItemNo 19 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the Constructionarea & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering Including shoring and strutting etc. complete By Mechanical Means |
20 | Item No 20 Excavation for foundation in hard murum including removing the excavated material up to a distance of 50 m.beyond the Construction area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering Including shoring and strutting etc. complete By Mechanical Means |
21 | Item no 21 Providing rubble filling of trap stones for foundation including filling voidswith sand /grit & compaction complete. |
22 | Item no 22 Providing laying in situof cement concrete of M10 proporton with trap stone metal in foundationincludingnecessaryformwork, compactingand curing (with reversible drum type mixer with SCADA complete. |
23 | Item no 23 Providing cast in situ /ready mix block of cement concrete M10 grade forcircular or other shaped opening for waterway including necessary scaffolding, formwork, compaction, finishing, covering newly laid concrete by gunny bag, plastic or tarpaulin and curing (with reversible drum type mixer with SCADA complete. |
24 | Item no 24Providing cast in situ cement concrete M10 grade for head walls, of CD works, piers, return, wings, with or without circular or other shaped opening for waterway including necessary scaffolding, formwork, compaction, finishing, covering newly laid concrete by gunny bag, plastic or tarpaulin and curing (with reversible drum type mixer with SCADA complete. |
25 | Item no 25Providing and laying cement concrete pipe of I.S. NP2 Class of1200 mm diameter in proper line, level & slope including providing, fixing collars or spigot and socket jointin cement mortar 1:2 etc. complete. |
26 | Item no 26 Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneissmetalforbedblocks,foundationblocksand suchotheritems includingbailing outwater, Steelcentering,formwork,laying/pumping,compacting, rougheningthemifspecialfinish is to be provided, finishing uneven and honeycombedsurfaceandcuringetc.complete.TheCement Mortar 1:3plaster is consideredfor rendering unevenandhoneycombedsurface only. Newly laid concrete shallbe coveredby gunnybag,plastic, tarpaulin etc. (Wooden centeringwill not beallowed.), with fully automatic microprocessorbasedPLCwithSCADA . With fine aggregate (Crushed sand VSI Grade) |
27 | Item no 27 Providing selected hard murum filling including laying in layers of 15cm. watering and compacting complete |
28 | Item no 28Providing & fixingstream lined R.C.C .guard stone Including reinforcementscomplete |
29 | Item NO 29: Providing and fixing board displaying information, such as "Name of work, Tender cost, Name of Contractor, Work completion and liability period etc", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge DSR I.No.288 |
30 | Item NO 30;-Shootig of Still photographs outdoor and indoor of construction and other works of building, bridges , roads, etc.in District and outside dist.at any distances. 4"" x 6"" Size(DSR I- 1949 ) +RA |
31 | Add GST Charges (Ax18%) |
32 | Add Labour Insurance (Ax1%) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy