Tender For Mw ( Maintenance ) To Buddhist Remains Of A Stupa On The Hill, Jaggayyapeta; 1 Supply And Fixing Of Location And Direction Sign Boards Of Size 4’X3’, Made With Vertical Posts = 2 Nos 65X65x6 Mm Ms L Angles, Frame = 40X40x4mm Ms L Angles, Board= 4Mm Acp Sheet And Letters Cut And Fixed In 2 Layers Of 3M Retro High Reflective Radium Sheet ( As Per Approved Colour And Text ) And Riveting The Board To The Frame Through Ss Rivets. Including Cost And Conveyance Of All Materials, Labour Charges, Cutting Into Required Sizes, Conveyance, Welding, Painting To The Sign Post And Frame With Two Coats Of Synthetic Enamel Paint Over A Primary Coat Of Red Oxide , Fixing The Sign Posts In 2 Nos Pcc ( 1:2:4 ) Blocks Of Size ( 0.45X0.45X0.60M ) , Gst And Other Applicable Taxes Etc. Complete Item Of Work As Directed By Site In Charge. 2 Cost, Supply And Installation Of Ms Prefabricated Container Cabin Of Size 10 X 10 X 8.6 Feet ( Fabricating Specifications Bottom Frame: 140 X50 Mm Formed Ms Pipe Of 3Mm Thick. Isi Mark, Stiffener Bottom: 80X50mm &25X50 Mm Square Pipes. Isi Mark, Top Frame: Frame Made Of 50X50mm Square Pipes. Isi Mark, Stiffener Top: 50X50 Mm, 25X50 Mm &25 X 25 Mm Square Pipes, Side Wall Stiffeners: Corner Post Shall Beof 75X75 Mm, 25X50 Mm L Angle & Wall Thickness Of 60 Mm. Isi Mark, Paneling Outside: Acp Sheet As Per Clients Requirement, Internal Wall Paneling: The Paneling Of Side Walls And Roof Shall Be Of 9 Mm Thick Pre Laminated Particle Board ( Mdf ) & All Verticallyand Horizontal Corners Shall Be Neatly And Smoothly Finished With Aluminum Sections, Roof Outside: 1.2Mm Thick G.I. Sheet Properly Sloped & Water Tight. Isi Mark, Bottom Flooring: On The Bottom Frame 18 Mm Thick Bison Panel I.E. Cemented Bonded Fiber Sheets Shall Be Fixed By Means Of Self Taping Screw &1.5Mm Thick Pvc Vinyl Carpet Shall Be Fixed On The Panel. ( 100%Water, Termite &Dimension Alproof With Vinyl Carpet ) , Aluminum Sliding Windows: Double Shutter Sliding Aluminum Powder Coated Windowswith 4Mm Thick Glass For All Windows, Safety Grills From Outside & Canopy On The Top Of Windows, Main Door: The Door Shall Be Of External Opening Type Made Out Of The Samematerial As Wall Panels& Canopy Above The Door. Frame Work By Tubular Pipe Of 30 X 30& The Door Interior Shall Be Finished With Same Material Matching With That Of The Cabin Interior. Door With Std Hardware Locks & Handles Godrej Lock, Insulation: Glass Wool Density Of 32 Kg / M3 With Insulation For Top &12Mm Foam On Side Walls, Wiring: All Wiring Shall Be Concealed And Shall Be Pvc Insulated Copper Wires Of Isi Quality, Suitable For 240 Volt, 50 Hz Single Phase Ac Power Supply. 2.5 Mm Thick Cable For Lighting, 5Ampswitches With 3Pin Sockets, Bulk Head Light Above The Door, 4Mm Thick Cable For Main Electrical Supply & With Mcb Protection. Polycab Isi Mark, Outside Painting: All Components Are Painted With A Coat Of Primer & 2 Coats Of Corrosion Free Paint I.E. Synthetic Epoxy Paint, Hooks: Specially Formed For Easy Lift & Shift Including Cost, Conveyance Of All The Materials, Installation Charges Etc. Gst And Other Applicable Taxes Etc. Complete Item Of Work As Directed By Site In Charge. 3 Earth Work Excavation In Foundation Trenches Or Drains Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M Complete Item Of Work As Directed By Site In Charge 4 Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level: 1:4:8 ( 1 Cement : 4 Coarse Sand ( Zone-Iii ) Derived From Natural Sources : 8 Graded Stone Aggregate 40 Mm Nominal Size Derived From Natural Sources ) Including Laying, Curing Etc Complete Item Of Work As Directed By Site In Charge 5 Construction Of Random Rubble Masonry With Hard Stone In Foundation And With : Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) Including Laying, Curing Etc Complete Item Of Work As Directed By Site In Charge 6 Construction Of Coursed Rubble Masonry In Superstructure Above Plinth Level And Upto Floor Five Level. Masonry Work ( First Sort ) , In Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) Including Cost Of Materials And Labour Charges Etc. Complete Item Of Work As Directed By Site In Charge 7 Pointing To The Surfaces In Cement Mortar 1:2 To Match With The Existing Pattern Including Cost Of Materials And Labour Charges Etc. Complete Item Of Work As Directed By Site In Charge 8 Providing Chain Linked Mesh ( Diamond Mesh Of Size 50X50mm, 8 Gauge ) Fencing Over Dwarf Wall With 50X50x6mm Iron Angles As Verticals At Every 2.50M C / C Fixed In The Dwarf Wall With 40X40x5mm L Angle Alround Frame Including Fabrication Charges And Painting The Grill With Two Coats Of Smoke-Grey Enamel Paint After Applying Necessary Iron Primer Etc. Complete Complying With Standard Specification And As Directed By Site In Charge 9 Providing Synthetic Enamel Painting In Two Coats To Old Mild Steel Grill And Ms Chain Link Mesh To Avoid Rust Etc. Including Cost Of Paint, Labour Charges Etc. Complete Item Of Work As Directed By Site In Charge. 10 Removal Of Existing Barbed Wire Fencing On North Side Of Stupa Including Cost Of Labour, All Applicable Taxes As Directed By Site In Charge.