Tender For Guzilimparai Block Of15 Works ( Upgradation Of Street Lanes ) 1 Part 1 : Providing Paver Block Pavement From Lakshmi House To Sandhi House At Chinnuluppai Ad Colony East Street In Chinnuluppai Panchayatestimate Amount Rs.2.45 Lakhs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 3 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 4 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 5 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 6 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 7 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 8 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 9 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 10 Part 2 : Providing Paver Block Pavement From Mariyappan House To Selvaraj House At Muthamparai Colony West Street Chinnuluppai Panchayatestimate Amount Rs.4.00 Lakhs 11 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 12 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 13 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 14 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 15 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 16 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 17 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 18 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 19 Part 3 : Providing Paver Block Pavement From Jaya House To Veerapandi House At C.Ammapatty East Street In Chinnuluppai Panchayatestimate Amount Rs.1.69 Lakhs 20 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 21 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 22 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 23 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 24 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 25 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 26 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 27 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 28 Part 4 :Providing Paver Block From Raja House To Muthan House At Idaiyapatty Ad Colony North Street In R.Vellodu Panchayatestimate Amount Rs.1.75 Lakhs 29 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 30 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 31 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 32 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 33 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 34 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 35 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 36 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 37 Part 5 :Providing Paver Block From Gobal House To Balaguru House At Idaiyapatty North Ad Colony In R.Vellodu Panchayatestimate Amount Rs.1.75 Lakhs 38 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 39 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 40 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 41 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 42 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 43 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 44 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 45 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 46 Part 6 :Providing Paver Block From Kamaraj House To Valarmathi House At Idaiyapatty Ad Colony Middle Street In R.Vellodu Panchayatestimate Amount Rs.1.80 Lakhs 47 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 48 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 49 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 50 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 51 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 52 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 53 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 54 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 55 Part 7 : Providing Paver Block From Vadivel House To Raman House At Idaiyapatty Ad Colony East Street In R.Vellodu Panchayatestimate Amount Rs.1.76 Lakhs 56 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 57 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 58 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 59 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 60 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 61 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 62 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 63 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 64 Part 8 :Providing Paver Block From Vanitha House To Iraivan House At Idaiyapatty Ad Colony South Street In R.Vellodu Panchayatestimate Amount Rs.1.81 Lakhs 65 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 66 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 67 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 68 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 69 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 70 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 71 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 72 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 73 Part 9 :Providing Paver Block From Kulanthaivel House To Rathika House At Ansari Nagar In Thirukkurnam Panchayatestimate Amount Rs.3.19 Lakhs 74 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 75 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 76 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 77 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 78 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 79 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 80 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 81 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 82 Part 10 :Providing Paver Block From Ambika House To Aathiparasakthi House At Mgr Nagar Ad Colony In Thirukkurnam Panchayatestimate Amount Rs.2.69 Lakhs 83 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 84 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 85 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 86 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 87 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 88 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 89 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 90 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 91 Part 11 :Providing Paver Block From Kanniyammal House To Peththammal House At Mgr Nagar Ad Colony In Thirukkurnam Panchayatestimate Amount Rs.0.97 Lakhs 92 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 93 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 94 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 95 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 96 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 97 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 98 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 99 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 100 Part 12 :Providing Paver Block At Thulukkamparai Ad Colony South Street In Thirukkurnam Panchayatestimate Amount Rs.1.27 Lakhs 101 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 102 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 103 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 104 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 105 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 106 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 107 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 108 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 109 Part 13 : Providing Paver Block From Bt Road To Threshing Floor At N.Malaipatty Main Street In Thirukkurnam Panchayatestimate Amount Rs.4.41 Lakhs 110 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 111 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 112 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 113 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 114 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 115 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 116 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 117 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 118 Part 14 : Providing Paver Block From Jeyanthi House To Pathmavathi House At N.Malaipatty East Street In Thirukkurnam Panchayatestimate Amount Rs.2.52Lakhs 119 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 120 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 121 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 122 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 123 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 124 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 125 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 126 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 127 Part 15 : Providing Paver Block From Balaguru House To Varatharaj House At Anna Nagar North Street In Thirukkurnam Panchayatestimate Amount Rs.3.20 Akhs 128 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 129 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 130 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 131 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 132 Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) 133 Paving Interlocking Paver Blocks Of 60Mm Thick Including All Cost And Conveyance Of All Materials And All Albour Charges Etc Complete 134 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 135 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package }