}

Tender For Guzilimparai Block Of 4 Works (Creating Infrastructure Facilities To The Burial Ground, Dindigul-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Guzilimparai Block Of 4 Works (Creating Infrastructure Facilities To The Burial Ground. Submission Date for this Tender is 05-08-2023. Wall Construction Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38903816
Tender For Guzilimparai Block Of 4 Works (Creating Infrastructure Facilities To The Burial Ground
Open Tender
Indian
Tamil Nadu
Dindigul
05-08-2023

Tender Details

Tender For Guzilimparai Block Of 4 Works ( Creating Infrastructure Facilities To The Burial Ground. 1 Part 1 : Improvements To The Samathuva Buriyal Ground At C.Ammapatty In Chinnuluppai Panchayat ( Cremation Shed + Wayer Supply Arrangements ) Estimate Amount Rs.4.50 Lakhs 2 Construction Of Cremation Shed 3 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 4 Refilling The Excavated Earth Other Then Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 5 Supply And Filling In Basement With River Sand Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 6 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 7 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 8 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 9 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 10 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 11 Finishing The Exposed Surface Of Rcc Items Of Work Such As Slabs, Beams, Sunshed Faica, Canopy Slab, Staircase Waist And Landing Slab, Etc., With Cement Morter 1:3 Mix To 10Mm Thick Including Cost And Convayense Of All Materials And Labour Charges Etc.., 12 Plastering With C.M. 1:5 Mixusing 12Mm Thick Including Curing, Cost And Conveyance Of All Materials And All Labor Charges Etc., Complete 13 Providing Granolithic Pattern Floor Finish With C.C 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 14 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 15 Distembering Two Coats With Best Quality Of Distember And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 16 Painting Two Coats With Extrior Emulsion Paint And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 17 Towards The Cost Of Chimny Arrangementsincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 18 Water Supply Arrangements 19 63Mm Pvc Pipe 4Ksc 20 63Mm Pvc Mta 21 63Mm Pvc Bend 22 Solvent Oil 23 1000 Lit Hdpe Tank 24 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 25 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 26 Pipe Line 27 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 28 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 29 Part 2 : Improvements To The Samathuva Buriyal Ground At Ponnampatty In R.Vellodu Panchayat ( Cremation Shed + Cc Road + Compound Wall + Wayer Supply Arrangements ) Estimate Amount Rs.5.52 Lakhs 30 Construction Of Cremation Shed 31 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 32 Refilling The Excavated Earth Other Then Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 33 Supply And Filling In Basement With River Sand Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 34 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 35 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 36 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 37 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 38 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 39 Finishing The Exposed Surface Of Rcc Items Of Work Such As Slabs, Beams, Sunshed Faica, Canopy Slab, Staircase Waist And Landing Slab, Etc., With Cement Morter 1:3 Mix To 10Mm Thick Including Cost And Convayense Of All Materials And Labour Charges Etc.., 40 Plastering With C.M. 1:5 Mixusing 12Mm Thick Including Curing, Cost And Conveyance Of All Materials And All Labor Charges Etc., Complete 41 Providing Granolithic Pattern Floor Finish With C.C 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 42 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 43 Distembering Two Coats With Best Quality Of Distember And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 44 Painting Two Coats With Extrior Emulsion Paint And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 45 Towards The Cost Of Chimny Arrangementsincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 46 Construction Of Compound Wall 47 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 48 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 49 Supply And Errection Of Centering And Shuttering Charges For All Rcc Works Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 50 Supply And Fabrication Of Steel Rod In Placing Of Proper Position Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 51 Rcc 1:1 1 / 2:3Mix Using 20Mm Hbg Iss Metal Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 52 Brick Work In Cm 1:5 Mix Using Country Bricksl Including All Cost And Conveyance Of All Materials And All Labour Charges As Per Standard Specification. 53 Plastering In Cm 1:5 Mix To 12Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 54 Painting Two Coats With Extwrior Emulsion Paint Using Good Quality And Approved Colour Of Paint Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 55 Construction Of Cc Road 56 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 57 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 58 Supply And Errection Of Centering And Shuttering Charges For All Pcc Works Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 59 Cement Concrete 1 : 2 : 4 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 60 Cement Concrete 1 : 3 : 6 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 61 Provision For Bitumenpad Charges Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 62 Water Supply Arrangements 63 63Mm Pvc Pipe 4Ksc 64 63Mm Pvc Mta 65 63Mm Pvc Bend 66 Solvent Oil 67 1000 Lit Hdpe Tank 68 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 69 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 70 Pipe Line 71 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 72 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 73 Part 3 : Improvements To The Samathuva Buriyal Ground At Narsingapuram Ad Colony In Thirukkurnam Panchayat ( Cremation Shed + Cc Road + Compound Wall + Wayer Supply Arrangements ) Estimate Amount Rs.6.55 Lakhs 74 Construction Of Cremation Shed 75 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 76 Refilling The Excavated Earth Other Then Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 77 Supply And Filling In Basement With River Sand Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 78 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 79 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 80 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 81 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 82 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 83 Finishing The Exposed Surface Of Rcc Items Of Work Such As Slabs, Beams, Sunshed Faica, Canopy Slab, Staircase Waist And Landing Slab, Etc., With Cement Morter 1:3 Mix To 10Mm Thick Including Cost And Convayense Of All Materials And Labour Charges Etc.., 84 Plastering With C.M. 1:5 Mixusing 12Mm Thick Including Curing, Cost And Conveyance Of All Materials And All Labor Charges Etc., Complete 85 Providing Granolithic Pattern Floor Finish With C.C 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 86 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 87 Distembering Two Coats With Best Quality Of Distember And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 88 Painting Two Coats With Extrior Emulsion Paint And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 89 Towards The Cost Of Chimny Arrangementsincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 90 Construction Of Compound Wall 91 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 92 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 93 Supply And Errection Of Centering And Shuttering Charges For All Rcc Works Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 94 Supply And Fabrication Of Steel Rod In Placing Of Proper Position Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 95 Rcc 1:1 1 / 2:3Mix Using 20Mm Hbg Iss Metal Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 96 Brick Work In Cm 1:5 Mix Using Country Bricksl Including All Cost And Conveyance Of All Materials And All Labour Charges As Per Standard Specification. 97 Plastering In Cm 1:5 Mix To 12Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 98 Painting Two Coats With Extwrior Emulsion Paint Using Good Quality And Approved Colour Of Paint Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 99 Construction Of Cc Road 100 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 101 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 102 Supply And Errection Of Centering And Shuttering Charges For All Pcc Works Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 103 Cement Concrete 1 : 2 : 4 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 104 Cement Concrete 1 : 3 : 6 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 105 Provision For Bitumenpad Charges Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 106 Water Supply Arrangements 107 63Mm Pvc Pipe 4Ksc 108 63Mm Pvc Mta 109 63Mm Pvc Bend 110 Solvent Oil 111 1000 Lit Hdpe Tank 112 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 113 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 114 Pipe Line 115 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 116 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 117 Part 4 : Improvements To The Samathuva Buriyal Ground At Venkadapuram In Thirukkurnam Panchayat ( Cremation Shed + Cc Road + Compound Wall + Wayer Supply Arrangements ) Estimate Amount Rs.6.60 Lakhs 118 Construction Of Cremation Shed 119 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 120 Refilling The Excavated Earth Other Then Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 121 Supply And Filling In Basement With River Sand Sand Including All Cost And Conveyance Of All Materials All Albour Charges Etc Complete 122 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 123 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 124 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 125 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 126 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 127 Finishing The Exposed Surface Of Rcc Items Of Work Such As Slabs, Beams, Sunshed Faica, Canopy Slab, Staircase Waist And Landing Slab, Etc., With Cement Morter 1:3 Mix To 10Mm Thick Including Cost And Convayense Of All Materials And Labour Charges Etc.., 128 Plastering With C.M. 1:5 Mixusing 12Mm Thick Including Curing, Cost And Conveyance Of All Materials And All Labor Charges Etc., Complete 129 Providing Granolithic Pattern Floor Finish With C.C 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 130 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 131 Distembering Two Coats With Best Quality Of Distember And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 132 Painting Two Coats With Extrior Emulsion Paint And The Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 133 Towards The Cost Of Chimny Arrangementsincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 134 Construction Of Compound Wall 135 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 136 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 137 Supply And Errection Of Centering And Shuttering Charges For All Rcc Works Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 138 Supply And Fabrication Of Steel Rod In Placing Of Proper Position Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 139 Rcc 1:1 1 / 2:3Mix Using 20Mm Hbg Iss Metal Including All Cost And Conceyance Of All Matrials And All Labour Charges Etc Complete 140 Brick Work In Cm 1:5 Mix Using Country Bricksl Including All Cost And Conveyance Of All Materials And All Labour Charges As Per Standard Specification. 141 Plastering In Cm 1:5 Mix To 12Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 142 Painting Two Coats With Extwrior Emulsion Paint Using Good Quality And Approved Colour Of Paint Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 143 Construction Of Cc Road 144 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 145 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 146 Supply And Errection Of Centering And Shuttering Charges For All Pcc Works Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 147 Cement Concrete 1 : 2 : 4 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 148 Cement Concrete 1 : 3 : 6 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 149 Provision For Bitumenpad Charges Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 150 Water Supply Arrangements 151 63Mm Pvc Pipe 4Ksc 152 63Mm Pvc Mta 153 63Mm Pvc Bend 154 Solvent Oil 155 1000 Lit Hdpe Tank 156 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 157 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 158 Pipe Line 159 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 160 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package }

Key Value

Document Fees
Refer document
EMD
INR 24000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail