Tender For Agamt Ii -2023-2024Vadamadurai Block Tn-05-01 ( 7 Works ) . 1 1. Deepening And Strengthening The Bund And Construction Of New Weir In Notchikulam Mi Tank At Sithuvarpatty Panchayat ( Est.Amt Rs 9.97 Lakhs ) 2 Clearing Light Jungle ( Based On Standard Schedule Of Rates Vid S.No 2 Item No.2 ) 3 Earth Work In All Soils Except Hard Rock Requiring Blasting And Conveying For Formation Of Bund With Lead Of 0 To 100 Metre Deploying Earth Moving Machineryand Tippers Includingbenching Formation Of Bunds Breaking Clods Sectioning Etc Complete ( Based On Standard Schedule Of Rates Vid S.No 86 Item No.1 ) 4 Tank Bund Portion 5 Add To Relevant T.N.D.S, S. No.20.A, Rates For New Tank Bunds And Closing Breaches For Extra Watering And Consolidationby Power Roller 6 Tank Bund Portion 7 Earth Work Excavation Deploying Earth Moving Machinery For Desilting Channel Having A Width Of Upto 3 - 10 M And Forming Bund On Either Sides And Depositing The Earth On Banks Including Jungle Clearance Etc Complete ( Item No.58 B ) 8 Supply Channel 9 Cost Of Civil Work 10 Earthwork Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Of Boulders Hard Gravelly Soil Inclusive Ofshoring To Full Depth Strutting And Bailing Out. 11 Supply And Filling With The Sand In 10Cm Thick Layer Inculding Watering Compacting Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete 12 Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete For Foundation 13 Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete 14 Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete 15 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 16 Below Gl 17 Above Gl 18 Cement Concrete 1:2:4 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete 19 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 20 Part 2 : Providing Cc Pavement At Vadugapatty Sc Streetsakthivel House To Bt Roadh / O Sithuvarpatty ( 44M ) .Estimate Amount Rs.2.34 Lakhs 21 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 22 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 23 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 24 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 25 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 26 Supply And Fixing Of Bittumen Pad Including All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 27 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 28 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 29 Part 3 : Providing Cc Pavement At Vadugapatty Sc Streetveeraganesan House To Arumugam Househ / O Sithuvarpatty ( 44M ) .Estimate Amount Rs.2.34 Lakhs 30 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 31 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 32 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 33 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 34 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 35 Supply And Fixing Of Bittumen Pad Including All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 36 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 37 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 38 Part 4 : Providing Cc Pavement At Thoppupatty West Streetmookkan House To Ohth / O Sithuvarpatty ( 43M ) .Estimate Amount Rs.1.97 Lakhs 39 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 40 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 41 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 42 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 43 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 44 Supply And Fixing Of Bittumen Pad Including All Labour Charges Etc., Complete.Labour Charges Etc., Complete. 45 Supply And Fixing Of Citizen / Information Board Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 46 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 47 Part 5 : Construction Ofpublic Distribution Shopbuildingat Palayasithuvarpatty H / O Sithuvarpatty Estimate Amount Rs.9.77Lakhs 48 Earth Work Excavation For Foundation In All Soils And Sub-Soils And To Full Depth As May Be Directed Except In Rock Requiring Blasting Inclusive Of Shoring Shuttering, Bailing Out Water Wherever Necessary And Depositing The Surplus Earth Within The Compound In Places Shown By Thedepartmental Officers With An Initial Lead Of 10 Mts And Initial Lift Of 2 Mts. And Clearing And Levelling The Site, Etc., Complete Complying With Standard Specification. 49 Supplying And Filling In Foundation With Filling M.Sand In Layers Of Not More Than 15 Cm Thick Well Watered, Rammed And Consolidated Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 50 Refilling With Excavated Earth Other Than Sand With An Initial Head Load Of 100 Mts. And Depositing The Earth As Shown By The Departmental Officersin Layers Of Not More Than 15 Cm Thick Well Rammed, Watered And Consolidated Etc. Complete Complying With Standard Specification 51 Cement Concrete 1:4:8 ( One Cement, Four M.Sand And Ten Hard Broken Stone Jelly ) Using 40 Mm Gauge Hard Broken Granite Stone Jelly For Foundationincluding Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick Well Rammed, Consolidated And Curing Etc. Complete Complying With Standard Specification 52 Brick Work In Cement Mortar1:5 ( One Cement And Five M.Sand ) Using Best Quality Of Country Bricks Of Size 8-3 / 4 X 4-1 / 4 X 2-1 / 4For Foundation And Basement Including Curing, Etc., Complete Complying With Standard Specifiction. 53 Supplying And Erecting Centering For Sides And Soffits Including Necessary Supports And Strutting Upto 3.29 M Height For Plane Surfaces As Detailed Below In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Bg Stiffened With Welded Mild Steel Angle Of Size 25Mm X 25Mm X 3 Mm For Boarding Laid Over Silver Oak Joists Of Size 10Cm X 6.50 Cm Spaced At Abote 90 Cm Centre To Centre And Supported By Casurina Props Of 10Cm To 13 Cm Dia Spaced At Not More Than 75 Cm Centre To Centre Etc. Complete Complying With The Standard Specificaito 54 Supplying, Fabricating And Placing In Position Mild Steel / Ribbed Tor Steel Grills For All Rcc Works As Per Design Given Including Cost Of Steel And G.I. Binding Wire In All Floors Etc. Complete Complying With Standard Specification. 55 Reinforced Cement Concrete 1:1.5:3 ( One Cement, One And A Half M.Sand And Three Hard Broken Stone Jelly ) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessaryetc., Complete Complying With Standard Specification And As Directed By The Departmental Officers 56 Plastering With Cement Mortar 1:3 ( One Cement And Three M.Sand ) , 10Mm Thick In All Floors Including Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 57 Plastering With Cement Mortar 1:5 ( One Cement And Five M.Sand ) , 12Mm Thick In All Floors Including Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 58 Dadooing Wall With Glazed Tiles Of Any Colour Of Any Size Laid In C.M 1:2 Mix 20 Mm Thick & Pointing With Colour Cement Using 0.40Kg Per Sq.M Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc.Complete 59 Paving The Floor With Cement Based Hydraulically Pressed Anti Skid Tiles ( Pattern Design ) - 20Mm Thick Of Approved Quality And Colour Laid In Cement Mortar 1:3 ( One Cement And Three Sand ) 20Mm Thick And Pointed With White Cement Mixed With Colouring Pigment At The Rate Of 0.40 Kg. / Sq.M., Curing, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. 60 Providing Granolithic Floor Finish Of The 40Mm Thickness With Plain Cement Concrete 1:2:4 ( One Cement, Two Sand And Four Aggregate ) Using 10 To 12Mm Gauge Hard Broken Stone Jelly Including Laying, Finishing And The Top Rubbed Smooth With Power Trawl, Thread Lining, Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 61 25Mm Thick 62 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 200Mm X 200Mm X 20Mm Of Approved Quality Set In Cement Mortar 1:3 ( One Cement And Three Sand ) 12Mm Thick Mixed With Water Proofing Compound Conforming To Iss At 2% By Weight Of Cement Used And The Joints Pointed Neatly To Full Depth Of Tiles With The Same Cement Mortar Mixed With Red Oxide And Water Proofing Compound Including Curing Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers 63 White Washing Two Coats With Freshly Burnt White Shell Lime In All Floors Including Cost Of Lime, Blue Powder Fevicol Type Gum, Brushes, Scaffolding Charges, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. 64 Supplying And Painting The Walls With Two Coats Of Oil Bound Distemper Over One Coat Of Water Based Cement Primer Including Cost For Distemper, Primer, Cleaning And Scrapping The Walls, Rendering The Wallssmooth With Necessary Putty, Brushes, Scaffolding Arrangements, Labour Charges, Etc., As Per Standard Specification. 65 Painting Two Coats Of Newly Plastered Wall Surface With Ready Mixed Plastic Exterior Emulsion Paint Of First Class Quality And Of Approved Colour Over A Priming Coat Including Thorough Scrapping, Clean Removal Of Dirt, And Including Necessary Plaster Of Paris Putty, Wherever Required Etc., Complete Complying With Standard Specification. 66 Painting New Iron Works Such As Steel Doors, Windows, Ventilators, Window Bars, Balustrades Etc., With Two Coats Of Best Approved First Quality And Colour Of Synthetic Enamel Paint Over The Existing Red Oxide Priming Coat In All Floors Excluding Cost Of Priming Coat Etc., Complete Complying With Standard Specification. 67 Solid Pvc Door Shutters Using 19 Gauge 19Mm Ms Square Tubes For Styles And Outer Frames. 15Mm Ms Square Tubes For Top, Lock And Bottom Rails. The Steel Tubes Shall Be Covered With 5Mm Thick Solid Pvc Sheets. Shutter Using 5Mm Thick Solid Pvc Sheets For 68 Pvc Door D2 Of Size 0.90 X 2.10M ( Single Leaf ) 69 Supplying Fabricating And Fixing Of Alu. Anodised Colour Matt Finish Half Paneled And Half Glazed Double Leaf Door The Outer Frame Shall Be With Alu.Box Section 70 Aluminium Door Of Size 1.00 X 2.10 M 71 Fabrication And Supply Of Mild Steel Window Of Of The Following Size With Double Leaves Outer Frame Made Of 35X35x5 Mm Equal M.S.L Angle, Mullion Section Made Of 25X25x5mm Equal T Section, Shutter Frame Madeof 25 X 25 X 5Mmequal M.S.L Angle For Horizontal And Vertical Members And The Shutter Frame Strengthened By Stiffeners Of 2 No. Horizontal For Each Shutter Using 25 X 25 X 5Mmequal M.S. T Section Fully Covered With 18 Gauge Plain M.S Full Sheet Welded With Shutter Frame Neatly And Also Fixing By Welding Protective Grill With 12Mm Square M.S Rods At An Interval Of Not Greater Than 10Cm Centre To Centre To The Outer Frame, 4 Nos. Of Hold Fasts Made Of 35X35x5 Mm Equal M.S.L Angle , 2 Nos. Of Peg Stays With Holes For Keeping The Windows Open In Different Positions, 2 Nos. Of Locking Handles, Fixing The Shutter With 4 Nos. Of 4 Inch Hinges With Outer Frame Of The Window Including Painting The Whole Unit With One Coat Of Best Quality Of Red Oxide Primer For Pds Building 72 Steel Window W Of Size 1.00M X 1.30M ( Double Leaf ) 73 Fabrication And Supply Of N Type Mild Steel Glazed Ventilator ( In Two Parts ) Of Of The Following Size Outer Frame Made Of 25X25x5mm Equal M.S.L Angle With Intermediate Rails Using25 X 25 X 5Mmequal M.S. T Section For Panels With 3Mm Thick Pin Headed Glass With Teak Wood Beading And Glass Putty And Also Fixing By Welding Protective Grill With 12Mm Square M.S Rods At An Interval Of Not Greater Than 10Cm Centre To Centre To The Outer Frame, 4 Nos. Of Hold Fasts Connecting The 2 Parts At 75Mm Clear And With 45 Degree Inclination With 25X25mm 10G Weld Mesh And Wire Mesh Including Painting The Whole Unit With One Coat Of Best Quality Of Red Oxide Primer For Pds 74 Ventilator Of Size 0.9 X 0.6M 75 Towards The Cost Of Supply And Erecting Ofpull And Push Type Steel Rolling Shutterwith Isi Make Using 18 Gi Sheet And Paintedwith One Coat Of Best Quality Of Red Oxide Primer Inclusive Of Hood Covers, Transportationcharges Etc. Complete 76 Rolling Shutter 77 Fabrication Supply And Fixing In Position Of Aluminium Natural Colour Matt Finish Fully Glazed Fixed Partition Of Size 4.50X3.00M Size Of Opening With Aluminium Grill Including All Charges Etc., Complete 78 Aluminium Partition At Office 79 Labour Charges For Fixing Of Doors, Windowsin Position Including Allcharges Etc., Complete 80 Steel Door 81 Steel Window And Ventilator 82 Supplyand Fixing In Position Best Approved Quality And Make White Glazed Earthen Ware Oriya Type Indian Water Closet Of Size 580 Mm With P Or S Trap Embedding The Closest And Trap To Shape In Position With Brick Jelly Lime Concrete 1:2:5 ( One Lime Two Sand And Five Brick Jelly ) Using 40 Mm Broken Brick Jelly And Finishing The Top To Required Slope And Including Giving Connections To The Pvc Soil Stacks Using 0.60 Mlong Pvc Pipe 110 Mm Dia. 6 Kg / Sqcm By Dismantling Masonry, Rcc Roof Or Floor Slaps And Making Good, The Disturbed Portion To Original Condition Without And Leakage Etc. Complete As Directed By The Departmental Officers And Complying With Standard Specifications 83 Supply And Fixing Of Best Quality Approved Make Colour Glazed Earthwere Wash Hand Basin Of Size 550X400mm With All Accessoreis Such As Cast Iron Brackets, 32Mm Dia C.P.Waste Coupling, Rubber Plug And Chain, 32Mm Dia B Class G.I Waste Pipe, 15Mm Dia Gm Wheel Valve, 15Mm Dia Nylon Connection, 15Mm Dia Brass Nipples, 15Mm C.P.Pillar Tap Andpedastal Including All Etc., Complete 84 Supply And Fixing Of Cuddapah Slab Of 20 / 30Mm Thick For Shelf Arrangements Including Cost And Conveyace Of All Materials To Site And All Labour Charges Etc Complete 85 Electrification ( 2021-22 Sor ) 86 Wiring With 2 X 1.5 Sq.M ( 22 / 0.3 ) Pvc Insulated Unsheathed Sc Cu. Conductor Of 1100V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With Tw Switch Box In Flush With Wall Covered With Hylum Sheet Of 3Mm Thick With Painting Of Suitable Colour For Open Pvc Light Point / Fan Point ( For Electronic Regulator ) - S.D.No: 20 87 Wiring With 2 X 1.5 Sq.M ( 22 / 0.3 ) Pvc Insulated Unsheathed Sc Cu. Conductor Of 1100V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessoriesand With 150 X 100 X 113 Tw Switch Box For 5A 3Pin Non Inter Locking Cs Plug With Painting Of Suitable Colour With Continuos Earth Wire Connection Of 14 Swg Tc Wire For Open Pvc Plug- S.D.No: 36 88 Supply And Fixing Of 1200Mm ( 48 ) Ac Ceiling Fan With Stepped Electronic 300 W Regulator With 1 Meter Down Rod On The Existing Clamp. - S.D.No: 107 89 Supply And Run Of 2 Of 1.50 Sq.Mm ( 22 / 0.3 ) Pvc Insulated Sc Unsheathed Cu.Conductor Of 1100 V On 7 / 20 Gi Bearer Wire For Service Connection Mains. - S.D.No: 64 90 Supply And Fixing Of Single Box Type 440 W Flu Fitting Complete With Copper Choke And Condensor With Tw Round Blocks On Wall Or Ceiling With Flu Tube With Pvc Unsheathed Copper Leads From Terminals To The Fitting - S.D.No: 88 91 Supply And Fixing Of Cfl Bulb 11W Including Cost And Conveyance Of All Materials And Labour Charges Etc Complete. Sd 80 92 Supply And Fixing Of 16 Amps Dpic Switch Of 500V With Fuse And Neutral ( Side Handle ) On Suitable Tw Board, With Earth Connection Only. - S.D.No: 142 93 Supply And Run Of 2 X 1.5 Sq.Mm. ( 22 / 0.3 ) Pvc Insulated Single Core Unsheathed Copper Conductor Of 1100V Grade In 25Mm Dia Gi Pipe ( Class B ) Suitably Bent At Both Ends With Necessary Angle Iron Upright And End Supports For Mains ( Sd No: 69 ) 94 Supply And Fixing Of Tneb Meter Board Suitable For 32A Single Phase Service Connection With 32A Fuse Unit ( 500V ) 32A Neutral Link And Earth Link ( 1X1 / 8 Copper Flat ) On Tw Plank Of Size 375Mmx300mmx19mm With Supporting Tw Reepers Of 1 Thick An Either Side With Painting With Suitable Bolt And Nuts For Fixing The Tw Plank On Wall With Earth Connection And Inter Connection With 7 / 20 Pvc Insulated Copper Wire From Eb Meter To Fuse Unit - Sd No: 125 95 Eb Deposit Amount 96 Provision For Water Supply Arrangements Etc., 97 Supply And Fixing Of 1000 Litre Hdpe Tank 98 63Mm Dia Pvc Pipe 99 63Mm Dia Pvc Tee 100 63Mm Dia Pvc Elbow 101 20Mm Dia Pvc Pipe 102 20Mm Dia Pvc Tee 103 20Mm Dia Pvc Elbow 104 20Mm X 15Mmdia Pvc Reducer 105 Pvc Screw Down Tap Heavy Type 20Mm Dia 106 Earth Work Excavation In Hard Stiff Clay And Hard Rock Earth And Lowering And Laying, Jointing Of Pipes And Refilling The Trench With Excavation Soils, Well Rammed And Consolidated After The Pipes And Specials Are Laid, Jointed And Tests Including All Labour Charges Etc., Complete 107 Labour Charges For Pvc Pipe And Specials Fixing Charges 108 Provision For Sanitary Pipe Line & Dispersion Arrangements Including All Charges Etc., Complete 109 110Mm Dia Pvc Pipe 4Kg / Sqm 110 110Mm Dia Pvc Tee 111 110Mm Dia Pvc Elbow 112 Provision For Front Elevation With Border And Projections Including Cost And Conveyance And All Labour Charges Etc., Complete 113 Provision For Name Board And Information Board 114 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 115 Part 6 : Construction Ofdrainage And Cover Slab With Filter Media At Palakurichi West Streeth / O Sithuvarpattyest Amount : 7.06 Lakhs 116 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 117 Foundation 118 Drainage 119 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 120 Supply And Errection Of Centering And Shuttering Charges Etc., Complete. 121 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete 122 Reinforced Cement Concrete 1:1.5:3 ( One Cement, One And A Half M.Sand And Three Hard Broken Stone Jelly ) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessaryetc., Complete Complying With Standard Specification And As Directed By The Departmental Officers 123 Supplying, Fabricating And Placing In Position Mild Steel / Ribbed Tor Steel Grills For All Rcc Works As Per Design Given Including Cost Of Steel And G.I. Binding Wire In All Floors Etc. Complete Complying With Standard Specification. 124 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 125 Plastering With Cement Mortar 1:5 Mix To 12Mm Thick Including Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 126 Painting Two Coats Of Newly Plastered Wall Surface With Ready Mixed Plastic Exterior Emulsion Paint Of First Class Quality And Of Approved Colour Over A Priming Coat Including Thorough Scrapping, Clean Removal Of Dirt, And Including Necessary Plaster Of Paris Putty, Wherever Required Etc., Complete Complying With Standard Specification. 127 20Mm Metal 128 40Mm Metal 129 Gravel 130 Sand 131 Charcoal 132 Supplyand Fixing Ofcudappah Stoneincluding All Costand Conveyance Charges Etc., Complete. 133 Supplying And Fixing Of 140Mm Dia Pvc Pipe Including All Charges Etc., Complete. 134 Supplying And Fixing Of 63Mm Dia Pvc Pipe Including All Charges Etc., Complete. 135 Towards The Labour Charges For Filling Metal , Charcoal, Gravel , Sand Etc., Complete 136 Providing Weld Mesh Including Cost Of Steel , Labour Charges Etc., Complete 137 Provision For Name Board 138 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 139 Part 7: Construction Of Threshing Floorpalayasithuvarpatty H / O Sithuvarpatty Estimate Amount Rs.9.10Lakhs 140 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Neccessary And Refilling The Sides Of Foundation 141 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 142 Collection And Supply Of Gritty Gravel From Appd Quarry Including Cost And Conveyance Of All Materials To Site Including All Labour Charges For Fillingetc.Complete, 143 Supplying And Filling In Foundation, Basement, Etc With Filling M.Sand In Layers Of Not More Than 15 Cm Thick Well Watered, Rammed And Consolidated Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 144 Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. 145 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 146 Supply And Eracting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X40 Cm And Bg For Stiffened With Welded Mild Steel Angle Of Size 25 X 25 X3 Mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10 X6.50 Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10-13 Cm Dia Spaced At 75 Cm C / C Etc., Complete 147 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including All Cost And Conveyance Of All Matirials And All Labour Charges Etc Complete ., 148 Plastering With Cement Mortar 1:5 Mix To 20Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 149 Supply Of50 Mm Ms Pipeincludingcost & Conveyance Ofall Materialsetc., Complete. 150 Fabrication, Supply And Erection Of Steel Structures As Per The Specification, Dimensions And Design Requirement Including All Labour Charges And Other Charges Etc. Complete ( Including Primary And Secondary Framing, Foundation Bolts, Stiffener Plate, Cleat Plate, Fasteners, Cold Formed Purlin Members, Ms Angle, Rectangular Hollow Sections, Sag Rods, Bracing Rods, End Plate, Base Plate, Connection Plate Etc Using Welding ) 151 Supplying And Fixing Colour Galvalume Sheet Roof Of 0.47Mm Thickand Steel Tubular Box Section Of 100X50x3mm Of 1Meter Interval Including Priming Coat Fixing In Position With All Necessary Accessories Complete Complying With Standard Specification And As Directed By The Departmental Officers. 152 Provision For Name Board Charges 153 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }