| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs,saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and diposal of unserviceable materials and stacking of serviceable material to be used of auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thicknessand as per direction of Engineer-in-charge. |
| 2 | Road-A |
| 3 | Road-B |
| 4 | Road-C |
| 5 | Road-D |
| 6 | Road-E |
| 7 | Road-F |
| 8 | Road-G |
| 9 | Earth work in excavation of foundation in all kinds ofsoil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C. |
| 10 | Road-E |
| 11 | Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty of all materials & cost of all labour & T&P required for the worketc. complete as per specification & direction of Engineer in charge. |
| 12 | Road-E |
| 13 | Providing plain cement concrete M-15 with clean blackhard granite stone aggregates of 40mm & down gradedsize of approved qualityfrom approved quarry consistent with strength & cover of concrete & layingin position in layers not exceeding 150mm thick in the proper packing by means of vibrator to proper slope andto the required level including hoisting lowering laying concrete providing sideshuttering & finishing all exposed surface smoothsupplying & working of pumps, labour & T&P articles & all machineries, dewatering if required with cost conveyance, royality of all materials complete in all respect as per specification & direction of the Engineer-in-Charge. |
| 14 | In Foundation |
| 15 | Road-E |
| 16 | In Substructure |
| 17 | Road-E |
| 18 | Providing weepholes in brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipes, extending through the full width of the structures with slope of 1(V):20(H) towards drawing faceincluding cost, conveyance, royalty of materials, labour charges, T&P etc, required for the work complete as per specification and direction of Engineer in Charge. |
| 19 | Road-E |
| 20 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming,requisite type of screening/ binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density including cost, conveyance, royalty of material, labour charges, T&P etc. complete as per Technical Specification Clause 404 of MoRTH specification for road & bridge works (4th revision) by manual means and as per direction of the Engineer-in-Charge. |
| 21 | Grading No.-2 with moorum gravel |
| 22 | Road-A |
| 23 | Grading No.-3 with moorum gravel |
| 24 | Road-A |
| 25 | Road-B |
| 26 | Road-C |
| 27 | Road-D |
| 28 | Road-E |
| 29 | Road-F |
| 30 | Road-G |
| 31 | Road-H |
| 32 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Clause 502 of MoSRT&H specifications includingcost, conveyance, royalty, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. |
| 33 | Road-A |
| 34 | Road-B |
| 35 | Road-C |
| 36 | Road-D |
| 37 | Road-E |
| 38 | Road-F |
| 39 | Road-G |
| 40 | Road-H |
| 41 | Providing and applying tack coat with Bitumen emulsionusing emulsion distributor at the rate of 0.20 kg/sqm on the prepared bituminous surfaces cleaned with mechanical broom as perClause 503 of MoSRT&H specifications includingcost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. |
| 42 | Road-A |
| 43 | Road-B |
| 44 | Road-C |
| 45 | Road-D |
| 46 | Road-E |
| 47 | Road-F |
| 48 | Road-G |
| 49 | Road-H |
| 50 | Providing and applying tack coat with Bitumen emulsion (RS)at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer using mechanical means including cost, conveyance, royalty of materials, labour charges, T&P etc, required for the work complete as per specification and direction of Engineer in Charge. |
| 51 | Road-A |
| 52 | Road-B |
| 53 | Road-C |
| 54 | Road-D |
| 55 | Road-E |
| 56 | Road-F |
| 57 | Road-G |
| 58 | Road-H |
| 59 | Providing and laying semi dense bituminous concrete with batch type hot mix plantusingcrushedaggregates of 10mm nominal size (Grading-II) premixed with bituminousbinder of60/70 penetration grade ofbitumen,transportingthehot mixtoworksite, laying with a hydrostaticpaverfinisherwithsensor control to the required grade, level and alignment, rolling with smooth wheelede,vibratory and tandem rollers to achieve the desired compaction as perClause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) includingcost, conveyance, royalty, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. |
| 60 | Road-A |
| 61 | Road-B |
| 62 | Road-C |
| 63 | Road-D |
| 64 | Road-E |
| 65 | Road-F |
| 66 | Road-G |
| 67 | Road-H |
| 68 | Providing, laying, spreadingand consolidation of moorum with PRR in shoulder of B.T pavement to required thickness including watering with cost, conveyance, royality of all materials, labour charge, T & P etc as required for the work complete in all respect as per direction of Engineer in charge. |
| 69 | Road-B |
| 70 | Road-C |
| 71 | Road-D |
| 72 | Road-E |
| 73 | Road-F |
| 74 | Road-G |
| 75 | Road-H |
| 76 | Construction of embankment with approved material obtained from borrow pits and transporting to site with all lifts & leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 of MoRD & as per direction of the Engineer-in-Charge. |
| 77 | By Mechanical means within 5km lead |
| 78 | Road-A |
| 79 | Road-B |
| 80 | Road-C |
| 81 | Road-D |
| 82 | Road-E |
| 83 | Road-F |
| 84 | Road-G |
| 85 | Reinforced cement concrete M15 grade Kilometer stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD and as per direction of Engineer-in-Charge. |
| 86 | (i) Ordinary kilometer stone (Precast) |
| 87 | Road-B |
| 88 | Road-C |
| 89 | Road-D |
| 90 | Road-E |
| 91 | Road-F |
| 92 | Road-G |
| 93 | (ii) 200 m Stone(Precast) |
| 94 | Road-B |
| 95 | Road-C |
| 96 | Road-D |
| 97 | Road-E |
| 98 | Road-F |
| 99 | Road-G |
| 100 | Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 of MORD Specification for Rural roads including cost,conveyance,royalty of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. |
| 101 | i) 600mm circular |
| 102 | Road-E |
| 103 | ii) 600mm x 450mm rectangular |
| 104 | Road-E |
| 105 | Painting 2 coats on concrete surface by using water based cement paint to unplastered concrete surface after cleaining the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2sqm. area includingcost, conveyance, royalty, taxes of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. |
| 106 | Road-C |
| 107 | Road-D |
| 108 | Road-G |