| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil itemA) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. (B.C.D 5.1.1) |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) (B.C.D 5.1.2) |
| 3 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume. (B.C.D 5.1.10) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6(1Cement:3coarsesand(zone-III):6gradedstoneaggregate40mm nominal size) (B.C.D 5.3.1.5) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) (B.C.D 5.3.1.1) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for, Foundations, footings, bases of columns, etc. for mass concrete.(B.C.D 5.3.17.1) |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. Depth Upto 3 M (R.C.D 3.13 i B) |
| 8 | Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.)(R.C.D 16.09) |
| 9 | Plain/ReinfocedCement concrete in open foundation complete as per drwaing and technical specifications. P.C.C Grade M15 (R.C.D 12.08 A Case ii) |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.(R.C.D 12.07 A) |
| 11 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications,Coursed Rubble Masonary (R.C.D 13.04B) |
| 12 | Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specifications P.C.C M15 Grade(R.C.D 13.05 A) |
| 13 | Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specifications P.C.C M20 Grade(R.C.D 13.05 B) |
| 14 | Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specifications P.C.C M25 Grade(R.C.D 13.05 F) |
| 15 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications(R.C.D 14.04) |
| 16 | Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.(R.C.D 13.08) |
| 17 | Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications.(R.C.D 13.03) |
| 18 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications.(R.C.D 13.06) |
| 19 | Earth work in filling in foundation trenches or back filling of masonry structure with state earth in layer not exceeding 150mm thick well watered rammed and fully compacted and finely dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift 1.5m complete as per specification and direction of E/l. (W.R.D 6.1.16) |
| 20 | Carriage of Material Cement |
| 21 | Sand |
| 22 | Chips |
| 23 | Metal |
| 24 | Boulder |
| 25 | Steel |
| 26 | GST 18% |
| 27 | Labour Cess 1% |