| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil itemA) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. (B.C.D 5.1.1) |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume. (B.C.D 5.1.10) |
| 3 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. (B.C.D 5.6.3) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)(B.C.D 5.3.1.2) |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:.(B.C.D 5.3.2.1) |
| 6 | Reinforcedcementconcreteworkinbeams,suspendedfloors,roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size).(B.C.D 5.3.11) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers.(B.C.D 5.3.17.5) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts.(B.C.D 5.3.17.6) |
| 9 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I.(B.C.D 5.2.14) |
| 10 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. (5.7.3) |
| 11 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper scaffolding , curing and taxes all complete as per building specification and direction of E/I.(5.8.24) |
| 12 | Supplying, fitting and fixing M.S. grill gate with M.S. grill made of 20X6mm M.S. flats or 16mm M.S. square bars fitted on 25X25X6mm M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I.(5.5.30) |
| 13 | Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing dust, dirt, scales smokes and grease and cleaning the surface throughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. (Mode of measurement area shall be multiplied by the co-efficient as indicated in building specification)(5.8.41) |
| 14 | Providing two coat of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface throughly , scaffolding and taxes all after removing dirt including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction of E/I.(5.8.45) |
| 15 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL)(5.5.4) |
| 16 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)}(5.5.5 A) |
| 17 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(b) 12mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)})(5.5.5 B) |
| 18 | Carriage of Material Cement And Steel |
| 19 | Sand |
| 20 | Chips |
| 21 | Bricks |
| 22 | GST 18% |
| 23 | Labour Cess 1% |