Tender For Providing Deepeningof Existing Open Welland Pump Roominkayathur Panchayat ; 2 Construction Of Open Well 3 Earth Work Excavation For Open Well Complying With Relevent Clauses Of Tndss Well Sinking With Initial Lead And Lift Inmedium Rock Andrequiring Blasting Etc, Complete. 4 Earth Work Excavation For Open Well Complying With Relevent Clauses Of Tndss Well Sinking With Initial Lead And Lift Inmedium Rock Andrequiring Blasting Etc, Complete. 5 Earth Work Open Well Excavation Complying With Relevent Clauses Of T.N.D.S.S. Well Sinking And With A Lead Upto 10 M In Hard Granite Requiring Blasting Measured In Solid Includingstackingetc, Complete. 6 Provision For Bailing Out Water Charges 7 Pump Room 8 Earth Work Excavation & Depositing On Bankwith An Initial Lead Of 10 Metre & Initial Lift Of 2 Metre In Hard Shift Clay, Stiff Block Cotton, Hard Red Earth Shales, Murrum, Gravel, Stoney Earth, And Earth Mixed With Small Size Boulders And Hard Gravelly Soil ( Ss 20B ) For Foundation Including Shoring, Strutting, Baling Out Water Providing Danger Light Wherever Necessarydepositing Thesurplus Earth On Bank And Otherincedential Charges Etc., Complete And As Directed By Twad Board Officers 9 Levelling Course With P.C.C 1:4:8 ( One Cement, Four Sand And Eigth Course Aggregate ) Using 40 Mm H.B.G Stone Including Mixing Concrete, Laying, Curing And Compacting Of Concrete Etc., Complete And As Directed By The Twad Board Officers. 10 Earth Filling In Basement & Sides Of Foundation With Excavated Earth Including Ramming And Consolidation Etc., Complete 11 Supply And Filling The Foundation And Basement With Clear River Sand In Layers Complying With Standard Specification Including Consolidation And Watering Etc. Complete And As Directed By Twad Board Officers. 12 Brick Work In Cm 1:5 ( One Cement And Five Sand ) Using Country Bricks Of Size 8.75 X 4.25 X 2.00 Including Cost Of All Materials, Labour Charges, Curing Etc., Complete And As Directed By Twad Board Officers. 13 For Foundation And Basement 14 For Super Structure 15 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) For The Following Members.The Rate To Excludethe Cost Of Steel For Reinforcement, Centering, Shuttering, Strutting But Includingcost Of Mixing Of Concrete, Placing, Vibrating With Mechanical Vibrator, Finishingand Curing Etc. Com 16 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) For The Following Members.The Rate To Excludethe Cost Of Steel For Reinforcement, Centering, Shuttering, Strutting But Includingcost Of Mixing Of Concrete, Placing, Vibrating With Mechanical Vibrator, Finishingand Curing Etc. Com 17 Plastering With C.M. 1:5 ( One Part Of Cement And Five Parts Of Sand ) With 12Mm Thick Over Brickwork Portion Including Labour Charges For Mixing Finishing And Curing Etc., Complete And As Directed By Twad Board Officers. 18 Steel Centering For Soffits Of Rcc Members Including Shuttering, Strutting To The Centring And Providing Supports Etc.Complete For The Following Members Using Ms Sheets Of Size 90Cm X 60Cm And Bg 10 Gaugesstiffened With Welded Ms Angles Of Size 25 X 25 X3mm Laid Over Silver Oak ( Country Wood ) Joists Of Size 10 X 6.5 Cm ( Spaced At About 90Cm C / C ) And Supported By Casurania Props Of 10 Cmto 13 Cm Dia. Spaced At 75 Cm C / C And As Directed By Twad Board Officers.The Centring Materials Should Be Supplied And Should Be Removed After The Specified Stripping Time Of The Concrete As Per Is 456 / 1978. 19 Special Ceiling Plastering For Rcc Slab With C.M.1:3 ( One Part Of Cement And Three Parts Of Sand ) 10Mm Thickover Rcc Surface Including Labour Charges For Mixing Finishingand Curing Etc., Complete As Directed By Twad Board Officers 20 Flooring In C C 1:4:8 ( One Cement , Four Sand And Eight Hbs ) 10 Cm Thick Using 40Mm Hbs Metal And Top Finished With Cement Mortar 1:3 ( One Cement And Three Sand ) 12 Mm Thick Including Labour Charges For Mixing, Finishing And Curing Etc. Complete And As Directed By Twad Board Officers. 21 Supply And Fixing Of Ms Door ( Single Leaf ) Of Sizes 1.00 X 2.00M In Ms Angle 50 X 50 X 4Mm And Ms Flat 35 X 6Mm With Ms Sheet Of 18 Gauge Including Ventilating Arrangements Using 20Mm Square Ms Rods With Locing Arrangements Including Two Coats Of Approved Enamel Painting Over One Coat Of Primer 22 Supply, Fabricating And Fixing In Position Of Rts Rods Including Cost Of Steel And Binding Wire Etc., Complete. 23 Supply And Fixing Of Rcc Box Type Jolly Of Size 0.6 X 0.45 M 24 Painting Two Coats With Approved Cement Paint Over One Priming Coat Of White Cementover Cement Plastered Wall Surface And Ceiling Including Cleaning Preparing The Surface And Curing Etc., Complete ( Using Cement Paint Of Colour As Approved By The Departm 25 White Washing Two Coats Using Fine Screened Shell Lime For The New Plastered Surface For Inner And Outer Side Of The Room Including The Cost Of Materials Labour Charges Etc., Complete And As Directed By Twad Board Officers. 26 Weathering Coarse Over Rcc Roof Including Fixing One Coarse Of Pressed Tiles Etc., Complete. 27 Provision Of Lock And Key For Pump Room And Oht Ladder 28 Levelling The Site 29 Providingname Board 30 Photo Graphic Charges 31 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }