| 1 | Part-A: 11kV OH line with 100Sqmm insulated AAA Conductor (Un armourd)=0.4KM |
| 2 | Supply and Erection of 150x150mm GI RS Joist (11Mtr long) (34.6Kg/mtr) (SAIL / JINDAL/ TATA make) Including excavation of pole pit in all kind of soil 1/6th Depth of pole Height. Complete in all respect as per the specification and direction of EIC. |
| 3 | Supply and installation of 11kV V-cross arrn(10.2Kg each). Complete in all respect as per the specification and direction of EIC. |
| 4 | Supply and installation of 11kV F- Clamp 2.9 Kg Each. Complete in all respect as per the specification and direction of EIC. |
| 5 | Supply and installation of GI Back Clamp for V-cross arm (11kV) ( 0.85 Kg each).Complete in all respect as per the specification and direction of EIC. |
| 6 | Supply, installation, testing and commissioning of 11kV Pin Insulator (Polymer). Complete in all respect as per the specification and direction of EIC. |
| 7 | Supply, installation, testing and commissioning of H W fitting(T&C)45KN. Complete in all respect as per the specification and direction of EIC. |
| 8 | Supply, installation, testing and commissioning of Disc insulator (B&S)45 KN polymer.Complete in all respect as per the specification and direction of EIC. |
| 9 | SITC of HT stay set(complete). Complete in all respect as per the specification and direction of EIC. |
| 10 | SITC of HT Stay insulator.Complete in all respect as per the specification and direction of EIC. |
| 11 | Supply and installation of HT stay clamp(1.95Kg/ pair).Complete in all respect as per the specification and direction of EIC. |
| 12 | Supply and installation of7/10 SWG Stay wire (12Kg/stay). Complete in all respect as per the specification and direction of EIC. |
| 13 | Supply, paving and stringing of 11kV 1core, 100mm2 XLPE insulated AAA conductor (Unarmoured). Complete in all respect as per the specification and direction of EIC. |
| 14 | Supply, fabrication and installation of 100 x 50 x 6 mm GI Channel (each 2.8 Mtr. Long (9.2Kg/mtr.) * 2 No. Complete in all respect as per the specification and direction of EIC. |
| 15 | Supply, fabrication and installation of 75 x 40 x 6 mm GI Angle (each 2.8 Mtr. Long 6.8Kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC. |
| 16 | Supply, fabrication and installation of 50 x 50 x 6 mm GI Angle (each 2.8 Mtr. Long 4.5Kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC. |
| 17 | Supply and installation of GI Nuts & Bolts of Assorted Size. As per the site requirment and direction of EIC. |
| 18 | SITC of Earthing support (coil type). Complete in all respect as per the specification and direction of EIC. |
| 19 | Supply installation and Commissioining of Anti Climbing Device made of GI barbed wire,Clamping arrangement etc.(2Kg Per Support). As per the direction of EIC. |
| 20 | SITC of Road Cross Guarding. Including Pipe earthing on both side of guarding. Complete in all respect as per the specification and direction of EIC. |
| 21 | Supply installation and commissioning of PG clamp for 100 mm2 AAA conductor. Complete in all respect as per the specification and direction of EIC. |
| 22 | Sundries |
| 23 | Part-A : Civil works |
| 24 | Material cost for Concreting and Couping of 11 Mtr RS Joist Pole 2.13mtnt 0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500 |
| 25 | Material cost for Concreting of Stay (1.65mtrx0.30mtrx0.30mtr=0.15 cum - PCC 1:3:6)@6500 |
| 26 | Part-B : PlinthMounted 25kVA, 11/0.4kV Substation. With 11mtr GI Joist Pole DP Structure. |
| 27 | Supply and Erection of 150x150mm GI RS Joist (11Mtr long) (34.6Kg/mtr) (SAIL / JINDAL/ TATA make) Including excavation of pole pit in all kind of soil 1/6th Depth of pole Height. Complete in all respect as per the specification and direction of EIC. |
| 28 | Supply, fabrication and installation of 100 x 50 x 6 mm GI Channel (each 2.8 Mtr. Long (9.2Kg/mtr.) * 2 No. Complete in all respect as per the specification and direction of EIC. |
| 29 | Supply, fabrication and installation of 75 x 40 x 6 mm GI Angle (each 2.8 Mtr. Long 6.8Kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC. |
| 30 | Supply, fabrication and installation of 50 x 50 x 6 mm GI Angle (each 2.8 Mtr. Long 4.5Kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC. |
| 31 | SITC of AB Switch(11kV, 200A, 3pole, 50Hz). Complete in all respect as per the specificatioin and direction of EIC. |
| 32 | SITC ofH.G.Fuse( 11kV,200A ,3Pole)with P1. Complete in all respect as per the specificatioin and direction of EIC. |
| 33 | SITC ofComplete in all respect as per the specification and direction of EIC. |
| 34 | SITC of40 mm Nominal bore GI Pipe ( medium gauge) Earthing Device (3 mtr. Long). Complete in all respect as per the specification and direction of EIC. |
| 35 | SITC of 25 kVA,11/0.4kV (Al) Transformer BIS Energy level-II. Complete in all respect as per the specification and direction of EIC. |
| 36 | SITC of LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 kVA S/S. Complete in all respect as per the specification and direction of EIC. |
| 37 | Supply, laying, testing and commissioning of 3.5 Cx 35 mm2 LT PVC Cable(un armoured). Complete in all respect as per the direction and specification of EIC. |
| 38 | SITC of HT stay set(complete). Complete in all respect as per the specification and direction of EIC. |
| 39 | SITC of HT Stay insulator.Complete in all respect as per the specification and direction of EIC. |
| 40 | Supply and installation of HT stay clamp(1.95Kg/ pair).Complete in all respect as per the specification and direction of EIC. |
| 41 | Supply and installation of 6/8 SWG Stay wire (10Kg/stay). Complete in all respect as per the specification and direction of EIC. |
| 42 | Supply and installation of 25x5 mm GI Flat for earthing. Complete in all respect as per the specification and direction of EIC. |
| 43 | Supply and installation ofAluminium Cable Sockets 35 mm2.Complete in all respect as per the specification and direction of EIC. |
| 44 | Supply and installation ofGI Nuts & Bolts of Assorted Size. As per the site requirment complete in all respect. |
| 45 | Supply and installationof all Earthing Materials with construction of earthing chamber including installation of earthing pipe including excavation, soil treatment, with bentonide powder, claculation of earth resistance. Complete in all respect as per the specification and direction of EIC. |
| 46 | Sundries |
| 47 | Part-B : Civil works |
| 48 | Material cost for Concreting and Couping of 11 Mtr RS Joist Pole 2.13mtnt 0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500 |
| 49 | Material cost for Concreting of Stay (1.65mtrx0.30mtrx0.30mtr=0.15 cum - PCC 1:3:6)@6500 |
| 50 | Supply and installation of Boundary wall with Grill Gate, Metal & sand. As per the Drawing approval of TPNoDL and direction of EIC. |
| 51 | Part-C : Construction of 3Ph 5W LT AB CableLine =1.0KM |
| 52 | Supply and Erection of 150x150mm GI RS Joist (9Mtr long) (34.6Kg/mtr) (SAIL / JINDAL/ TATA make) Including excavation of pole pit in all kind of soil 1/6th Depth of pole Height. Complete in all respect as per the specification and direction of EIC. |
| 53 | Supply, paving and installation of 3x95+1x70+1x16mm2 LT XLPE Aerial bunched Cable. Complete in all respect as per the specification and direction of EIC. |
| 54 | Supply and installation of LT Stay Set. Complete in all respect as per the specification and direction of EIC. |
| 55 | Supply installation of7/12 (SWG) GI Stay Wire. Complete in all respect as per the specification and direction of EIC. |
| 56 | SITC ofLT Stay Insulator. Complete in all respect as per the specification and direction of EIC. |
| 57 | Supply and installation ofLT stay Clamp (1.40Kg/pair).Complete in all respect as per the specification and direction of EIC. |
| 58 | SITC of Earthing support (coil type) every 5th pole. Complete in all respect as per the specification and direction of EIC. |
| 59 | Supply and installation of Dead End Clamp. Complete in all respect as per tha specification and direction of EIC. |
| 60 | Supply and installatioin of Suspension Clamp with Eye Hook for ABC. Complete in all respect as per the specification and directioin of EIC. |
| 61 | Supply and installatioin of Pole Clamp for Eye Hook ( AB Cable ). Complete in all respect as per the specification and directioin of EIC. |
| 62 | Supply and installation of Piercing Connector.Complete in all respect as per the specification and direction of EIC. |
| 63 | Supply and installation ofNeutral Connector. Complete in all respect as per the specification and direction of EIC. |
| 64 | Supply and installation of GI Nuts & Bolts of Assorted Size. As per the site requirment and direction of EIC. |
| 65 | Sundries for survey, tree cutting, small size nut & bolt with washer, Allm. Binding Tape, Danger Board, etc |
| 66 | Part-C : Civil works |
| 67 | Material cost for Concreting of 9 Mtr RS Joist Pole 1.80 mtr*0.40 mtr*0.40 mtr =0.29 cum (PCC 1:3:6) @6500 |
| 68 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.150 cum - PCC 1:3:6)@6500 |
| 69 | Part- D : 3 Phase Service Connection |
| 70 | Supply, Paving and stringing of 3.5C X 35 mm2 LT PVC Cable(un armoured). As per the Specification and direction of EIC. |
| 71 | Supply and installation of All. Cable lug of different size as per the Site requirement. |
| 72 | Supply and installation of 40 min Dia GI S/C Bracket. Complete in all Respect. |
| 73 | Supply and installation of Link Clip. |
| 74 | Supply and Stringing ofNo. 6/8 GI Wire |
| 75 | Sundries |