Rural Development Government Departments Closing in 0 days TDR #38829765

Tender For Construction Of Bridge In Bardih River Village Bardih Of Karaikela Panchayat Under Bandgaon Block Of West Singhbhum District.

Issued by Government Departments · bandgaon, Jharkhand
Tender Value
3.72 Crore
Estimated cost
Bid Submission
01 Aug 2023
0 days left
EMD
7.45 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bandgaon → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Bridge In Bardih River Village Bardih Of Karaikela Panchayat Under Bandgaon Block Of West Singhbhum District.

BOQ

Name of Work: Construction of bridge in Bardih river village Bardih of Karaikela Panchayat under Bandgaon block of West Singhbhum District.
Sl. No. Item Description
1Dismantling of Structures - (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres)
2Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means Depth upto 3m
3Depth between 3m to 6m
4Exacavation for structures in Ordinary rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)B) - Mechanical Means
5Exacavation for structures in Hard rock blasting prohibited (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) A) Mechanical Means
6Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
7Filling Annular Space around footing in rock.
8Plain/ReinfocedCement concrete in open foundation complete as per drwaing and technical specifications.(G) RCC Grade M30Case - I (RCC Grade M30 using batching plant & Concrete pump)
9Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
10Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications.G) RCC Grade M30RCC Grade M30 using batching plant, transit mixer & concrete pump Height upto 5m
11Height 5m to 10m
12Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
13Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
14Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications (B) Sandy Materials
15Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
16Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications.
17Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. C) RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. (ii) For T-beam & slab,RCC T-Beam & Slab (Height 5m to 10m)
18PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specification.
19Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
20Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.)
21Drainage Spouts complete as per drawing and Technical specification
22Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
23Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.
24Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
25Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
26Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.
27APPROACH ROAD PART Clearing and grubbing road land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.)
28Embankment Construction with Material Obtained from Borrow Pits (Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.)
29Compacting original ground supporting embankment(Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)
30Granular Sub-Base with Graded Material (Table:- 400-1)Gr-I (By Mix in Place Method)Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
31Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
32Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.)
33Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.)
34Open graded Premix surfacing (Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.)
35Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using ) Type B seal coats.
36Boundary pillar(Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting).
37RETAINING WALL / GUARD WALL PART Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means (i) (Depth upto 3m)
38Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
39RePlain/ReinfocedCement concrete in open foundation complete as per drwaing and technical specifications.(E) RCC Grade M25Case - I (RCC Grade M25 using batching plant & Concrete pump)
40Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specifications.F) RCC Grade M25RCC Grade M25 using batching plant, transit mixer & concrete pump (p) Height upto 5m
41Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
42Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
43Plain/Reinforced cementconcrete(PCCGradeM20)inopen foundation complete as per drawing and technical specifications.
44Reinforcedcementconcrete(PCCGradeM20)in substructure complete as per drawing and technical specifications.
45Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
46DIVERSION Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
47Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification B) Sandy Material
48Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
49Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in double row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling,concrete and masonry works in head walls and parapets . ) B)1200mm dia
50Embankment Construction with Material Obtained from Borrow Pits (Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.)
51Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.)
52Granular Sub-Base with Graded Material (Table:- 400-1)Gr-I (By Mix in Place Method)Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
53CARRIAGE PART Sand, Kuju 45 Km (P) + 1 Km (K).
54Stone Chips, Hata 78 Km (P) + 2 Km (K).
55Stone Metal, Hata 78 Km (P) + 2 Km (K).
56Stone Boulder, Hata 78 Km (P) + 2 Km (K).
57Bitumin, Bokaro 250 Km (P) + 0 Km (K).
58Cement, Chaibasa 36 Km (P) + 1 Km (K).
59Steel, Chaibasa 36 Km (P) + 1 Km (K).
60Emulsion, Bokaro 250 Km (P) + 0 Km (K).
61G.S.T @ 18%
62Labour Cess 1%

AI Tender Summary

OUR REF NO 38829765
AUTHORITY Government Departments
TENDER VALUE 3.72 Crore
LAST DATE 01-08-2023
Authority
Authority Name Rural Development Department
Work Description Construction Of Bridge In Bardih River Village Bardih Of Karaikela Panchayat Under Bandgaon Block Of West Singhbhum District.
Basic Detail
Tender No RDD/SD/CHAIBASA/37/2023-24Gr-2
Bidding Type Tender
Location
City bandgaon
State Jharkhand
Key Dates
Publish Date 26 Jul 2023
Submission Date 01 Aug 2023
Open Date 05 Aug 2023
Finance
Tender Value 3.72 Crore
Tender Fee 10000
EMD 7.45 Lakhs
Exemption Not Available
Document List
da568626-cd6b-4fbd-98c9-8389d7117766.html
BOQ_99024.xls
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 26, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 01, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 05, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

da568626-cd6b-4fbd-98c9-8389d7117766.html

xls

BOQ_99024.xls

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders