| 1 | CONTROL VALVE O - RING CHANGE. |
| 2 | CONTROL VALVE CALIBRATION. |
| 3 | CONTROL VALVE DISMOUNTING REFITTING. |
| 4 | POWER CYLINDER CALIBRATION. |
| 5 | IP CHANGE. |
| 6 | COPPER TUBING. |
| 7 | POWER CYLINDER SEAL KIT CHANGE |
| 8 | T/C RTD CHANGE. |
| 9 | CUTTING & WELDING |
| 10 | IMPULSE LINE PURGING & CLEANING. |
| 11 | CLEANING OF DCS PANEL BY AIR, SURF& PETROL |
| 12 | LEVEL SWITCH DISMOUNTING, CLEANING,MOUNTING AND OPERATION CHECKING. |
| 13 | TRANSMITTER/ GAUGE/ SWITCHDISMOUNTING, CALIBRATION & RE MOUNTING. |
| 14 | MATERIAL SHIFTING FROM O & M STORETO SITE STORE WITH TROLLY. |
| 15 | JB FRAME FABRICATION,ERECTION & PAINTING |
| 16 | POWER CYLINDER CLEANING. |
| 17 | UPS BATTERY DISCHARGING/CHARGING. |
| 18 | IG. TRANSFORMER TESTING. |
| 19 | IG. F/B CHECKING/ADJUST. |
| 20 | CLEANING OF LBCC JBS & LOCAL JBS. |
| 21 | SOLENOID V/V DISMOUNTINGREFITTING & SERVICING. |
| 22 | LOCAL PANEL CLEANING& TIGHTNESS CHECKING. |
| 23 | MTR. WDG & BRG. RTDCABLE DISMOUNTING, CONNECTION. |
| 24 | ASBESTORS ROPE BINDING (PER METER) |
| 25 | CONDUIT ERECTION (PER MITER) |
| 26 | UNION FITTING /ANY FITTINGS CHANGE. |
| 27 | LEAKAGES ATTEND AT IGNITOR. |
| 28 | MCB DISMOUNTING AND NEW MCBMOUNTING FOR POWER PANEL. |
| 29 | GI PIPE LAYING. |
| 30 | SERVO VLV DISMOUNTING/CLEANING/REFITTING. |
| 31 | SERVO VALVE OIL UNIT CLEANING. |
| 32 | CABLE DRUM SHIFTING. |
| 33 | POWER CYLINDER LINK DISMANTLING. |
| 34 | RMG FEEDBACK UNITDISMOUNTING AND REFITTING. |
| 35 | ELECTRONIC MONITOR ERECTIONFOR O2 PROBE. |
| 36 | SERVO VALVE F/B TRANSMITTERDISMOUNTING & REFITTING. |
| 37 | UPS CLEANING AND SERVICING. |
| 38 | O2 PROBE GUARD PIPE DISMANTLING& NEW MOUNTING. |
| 39 | DIN RAIL MOUNTING FOR INSIDE PANEL. |
| 40 | PANEL REPAIRING. |
| 41 | COAL FEDDER PANEL & LOCAL JB CLEANING. |
| 42 | NEW TB MOUNTING. |
| 43 | TURBINE RTD & T/C CHECKING. |
| 44 | SOIL CUTTING & FILLING FOREARTH PIT ERECTION WITH CHARCOAL & SALT. |
| 45 | GASKIT CUTTING. |
| 46 | AIR HOSE PIPE DISMANTLE & REFITTING. |
| 47 | TOTAL CABLE TRAY ASHCLEANING BOILER AREA. |
| 48 | POWER CYLINDER BASE FRAME REPAIRING. |
| 49 | OLD JB CLEANING,REPAIRINGTIGHTNESS CHECKING & PLASTIC COVERING |
| 50 | 1/2 \" IMPULSE PIPE REPLACEMENT. |
| 51 | OLD BOILER METAL T/C CAPILARYWIRE DISMANTLING . |
| 52 | NEW T/C CAPILARY WIRE LAYING. |
| 53 | 2/C T/C CABLE TERMINATION WITHOUT GLAND. |
| 54 | NEW T/C PROBE MOUNTING AT PENT HOUSE. |
| 55 | LIMIT SWITCH CHANGE. |
| 56 | GLAND HOLE BLOCKING BY G.ISHEET PANEL & JB. |
| 57 | ROOT VALVE CHANGE. |
| 58 | DIFFERENT TYPES OF CABLE LAYING |
| 59 | CABLE TERMINATION WITH GLANDING. |
| 60 | LEVEL STATE PROBE & HYDRA STEP PROBEDISMANTALING, CLEANING & REFITTING. |
| 61 | ACDB PANEL CLEANING, TIGHTNESSCHECKING & SERVICING. |
| 62 | AIR RESISTOR ACTUATOR MOUNTING,DISMOUNTING & SERVICING |
| 63 | FLAME SCANNER PROBE UNIT MOUNTING,DISMOUNTING & SERVICING. |
| 64 | Auto Drain Valve Cleaning & Servicing |
| 65 | JB Canopy fabrication, erection& painting. |
| 66 | Opacity meter calibration checking. |
| 67 | HP LP Bypass Position FeedbackTransmitter Checking. |
| 68 | SOV Servicing and Sample line purging. |
| 69 | CCP Temp. measurement RTD mountedcable laying & connection at Field side & JB side. |
| 70 | 30/C Cable Lay. |
| 71 | 30/C Cable gland andtermination with gland. |
| 72 | Cable Tray route erection. |
| 73 | Ash Plant ESP Hooper Level Sensor(with controller) calibration checking. |