Tender For Service Order For C And I Related Regular Overhauling Jobs Of Unit 3 Ktps
Tender Overview
Project Description
Service Order For C And I Related Regular Overhauling Jobs Of Unit 3 Ktps- 1 Control Valve O - Ring Change. 2 Control Valve Calibration. 3 Control Valve Dismounting Refitting. 4 Power Cylinder Calibration. 5 Ip Change. 6 Copper Tubing. 7 Power Cylinder Seal Kit Change 8 T / C Rtd Change. 9 Cutting & Welding 10 Impulse Line Purging & Cleaning. 11 Cleaning Of Dcs Panel By Air, Surf& Petrol 12 Level Switch Dismounting, Cleaning, Mounting And Operation Checking. 13 Transmitter / Gauge / Switchdismounting, Calibration & Re Mounting. 14 Material Shifting From O & M Storeto Site Store With Trolly. 15 Jb Frame Fabrication, Erection & Painting 16 Power Cylinder Cleaning. 17 Ups Battery Discharging / Charging. 18 Ig. Transformer Testing. 19 Ig. F / B Checking / Adjust. 20 Cleaning Of Lbcc Jbs & Local Jbs. 21 Solenoid V / V Dismountingrefitting & Servicing. 22 Local Panel Cleaning& Tightness Checking. 23 Mtr. Wdg & Brg. Rtdcable Dismounting, Connection. 24 Asbestors Rope Binding ( Per Meter ) 25 Conduit Erection ( Per Miter ) 26 Union Fitting / Any Fittings Change. 27 Leakages Attend At Ignitor. 28 Mcb Dismounting And New Mcbmounting For Power Panel. 29 Gi Pipe Laying. 30 Servo Vlv Dismounting / Cleaning / Refitting. 31 Servo Valve Oil Unit Cleaning. 32 Cable Drum Shifting. 33 Power Cylinder Link Dismantling. 34 Rmg Feedback Unitdismounting And Refitting. 35 Electronic Monitor Erectionfor O2 Probe. 36 Servo Valve F / B Transmitterdismounting & Refitting. 37 Ups Cleaning And Servicing. 38 O2 Probe Guard Pipe Dismantling& New Mounting. 39 Din Rail Mounting For Inside Panel. 40 Panel Repairing. 41 Coal Fedder Panel & Local Jb Cleaning. 42 New Tb Mounting. 43 Turbine Rtd & T / C Checking. 44 Soil Cutting & Filling Forearth Pit Erection With Charcoal & Salt. 45 Gaskit Cutting. 46 Air Hose Pipe Dismantle & Refitting. 47 Total Cable Tray Ashcleaning Boiler Area. 48 Power Cylinder Base Frame Repairing. 49 Old Jb Cleaning, Repairingtightness Checking & Plastic Covering 50 1 / 2 Impulse Pipe Replacement. 51 Old Boiler Metal T / C Capilarywire Dismantling . 52 New T / C Capilary Wire Laying. 53 2 / C T / C Cable Termination Without Gland. 54 New T / C Probe Mounting At Pent House. 55 Limit Switch Change. 56 Gland Hole Blocking By G.Isheet Panel & Jb. 57 Root Valve Change. 58 Different Types Of Cable Laying 59 Cable Termination With Glanding. 60 Level State Probe & Hydra Step Probedismantaling, Cleaning & Refitting. 61 Acdb Panel Cleaning, Tightnesschecking & Servicing. 62 Air Resistor Actuator Mounting, Dismounting & Servicing 63 Flame Scanner Probe Unit Mounting, Dismounting & Servicing. 64 Auto Drain Valve Cleaning & Servicing 65 Jb Canopy Fabrication, Erection& Painting. 66 Opacity Meter Calibration Checking. 67 Hp Lp Bypass Position Feedbacktransmitter Checking. 68 Sov Servicing And Sample Line Purging. 69 Ccp Temp. Measurement Rtd Mountedcable Laying & Connection At Field Side & Jb Side. 70 30 / C Cable Lay. 71 30 / C Cable Gland Andtermination With Gland. 72 Cable Tray Route Erection. 73 Ash Plant Esp Hooper Level Sensor ( With Controller ) Calibration Checking.
BOQ
| Sl. No. | Item Description |
| 1 | CONTROL VALVE O - RING CHANGE. |
| 2 | CONTROL VALVE CALIBRATION. |
| 3 | CONTROL VALVE DISMOUNTING REFITTING. |
| 4 | POWER CYLINDER CALIBRATION. |
| 5 | IP CHANGE. |
| 6 | COPPER TUBING. |
| 7 | POWER CYLINDER SEAL KIT CHANGE |
| 8 | T/C RTD CHANGE. |
| 9 | CUTTING & WELDING |
| 10 | IMPULSE LINE PURGING & CLEANING. |
| 11 | CLEANING OF DCS PANEL BY AIR, SURF& PETROL |
| 12 | LEVEL SWITCH DISMOUNTING, CLEANING,MOUNTING AND OPERATION CHECKING. |
| 13 | TRANSMITTER/ GAUGE/ SWITCHDISMOUNTING, CALIBRATION & RE MOUNTING. |
| 14 | MATERIAL SHIFTING FROM O & M STORETO SITE STORE WITH TROLLY. |
| 15 | JB FRAME FABRICATION,ERECTION & PAINTING |
| 16 | POWER CYLINDER CLEANING. |
| 17 | UPS BATTERY DISCHARGING/CHARGING. |
| 18 | IG. TRANSFORMER TESTING. |
| 19 | IG. F/B CHECKING/ADJUST. |
| 20 | CLEANING OF LBCC JBS & LOCAL JBS. |
| 21 | SOLENOID V/V DISMOUNTINGREFITTING & SERVICING. |
| 22 | LOCAL PANEL CLEANING& TIGHTNESS CHECKING. |
| 23 | MTR. WDG & BRG. RTDCABLE DISMOUNTING, CONNECTION. |
| 24 | ASBESTORS ROPE BINDING (PER METER) |
| 25 | CONDUIT ERECTION (PER MITER) |
| 26 | UNION FITTING /ANY FITTINGS CHANGE. |
| 27 | LEAKAGES ATTEND AT IGNITOR. |
| 28 | MCB DISMOUNTING AND NEW MCBMOUNTING FOR POWER PANEL. |
| 29 | GI PIPE LAYING. |
| 30 | SERVO VLV DISMOUNTING/CLEANING/REFITTING. |
| 31 | SERVO VALVE OIL UNIT CLEANING. |
| 32 | CABLE DRUM SHIFTING. |
| 33 | POWER CYLINDER LINK DISMANTLING. |
| 34 | RMG FEEDBACK UNITDISMOUNTING AND REFITTING. |
| 35 | ELECTRONIC MONITOR ERECTIONFOR O2 PROBE. |
| 36 | SERVO VALVE F/B TRANSMITTERDISMOUNTING & REFITTING. |
| 37 | UPS CLEANING AND SERVICING. |
| 38 | O2 PROBE GUARD PIPE DISMANTLING& NEW MOUNTING. |
| 39 | DIN RAIL MOUNTING FOR INSIDE PANEL. |
| 40 | PANEL REPAIRING. |
| 41 | COAL FEDDER PANEL & LOCAL JB CLEANING. |
| 42 | NEW TB MOUNTING. |
| 43 | TURBINE RTD & T/C CHECKING. |
| 44 | SOIL CUTTING & FILLING FOREARTH PIT ERECTION WITH CHARCOAL & SALT. |
| 45 | GASKIT CUTTING. |
| 46 | AIR HOSE PIPE DISMANTLE & REFITTING. |
| 47 | TOTAL CABLE TRAY ASHCLEANING BOILER AREA. |
| 48 | POWER CYLINDER BASE FRAME REPAIRING. |
| 49 | OLD JB CLEANING,REPAIRINGTIGHTNESS CHECKING & PLASTIC COVERING |
| 50 | 1/2 \" IMPULSE PIPE REPLACEMENT. |
| 51 | OLD BOILER METAL T/C CAPILARYWIRE DISMANTLING . |
| 52 | NEW T/C CAPILARY WIRE LAYING. |
| 53 | 2/C T/C CABLE TERMINATION WITHOUT GLAND. |
| 54 | NEW T/C PROBE MOUNTING AT PENT HOUSE. |
| 55 | LIMIT SWITCH CHANGE. |
| 56 | GLAND HOLE BLOCKING BY G.ISHEET PANEL & JB. |
| 57 | ROOT VALVE CHANGE. |
| 58 | DIFFERENT TYPES OF CABLE LAYING |
| 59 | CABLE TERMINATION WITH GLANDING. |
| 60 | LEVEL STATE PROBE & HYDRA STEP PROBEDISMANTALING, CLEANING & REFITTING. |
| 61 | ACDB PANEL CLEANING, TIGHTNESSCHECKING & SERVICING. |
| 62 | AIR RESISTOR ACTUATOR MOUNTING,DISMOUNTING & SERVICING |
| 63 | FLAME SCANNER PROBE UNIT MOUNTING,DISMOUNTING & SERVICING. |
| 64 | Auto Drain Valve Cleaning & Servicing |
| 65 | JB Canopy fabrication, erection& painting. |
| 66 | Opacity meter calibration checking. |
| 67 | HP LP Bypass Position FeedbackTransmitter Checking. |
| 68 | SOV Servicing and Sample line purging. |
| 69 | CCP Temp. measurement RTD mountedcable laying & connection at Field side & JB side. |
| 70 | 30/C Cable Lay. |
| 71 | 30/C Cable gland andtermination with gland. |
| 72 | Cable Tray route erection. |
| 73 | Ash Plant ESP Hooper Level Sensor(with controller) calibration checking. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender