Tender For Annual Rate Contract For Environmental Monitoring And Submission Of Annual Statement For Ktps For 2(Two) Years, purba-West Bengal

West Bengal Power Development Corporation Limited has published Tender For Annual Rate Contract For Environmental Monitoring And Submission Of Annual Statement For Ktps For 2(Two) Years. Submission Date for this Tender is 21-08-2023. Environmental Monitoring Service Tenders in purba West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

38817378
Tender For Annual Rate Contract For Environmental Monitoring And Submission Of Annual Statement For Ktps For 2(Two) Years
Open Tender
Indian
West Bengal
purba
21-08-2023

Tender Details

Tender For Annual Rate Contract For Environmental Monitoring And Submission Of Annual Statement For Ktps For 2(Two) Years

Key Value

Document Fees
Refer document
EMD
INR 21600.0 /-
Tender Value
INR 10.80 Lakhs /-

BOQ Items

Name of Work: Annual Rate Contract for Environmental Monitoring and Submission of Annual statement for KTPS for 2(two) years
Sl. No. Item Description
1Environmental Monitoring and Report
2SPM-SOX-NOX ( Collection of samples for emission through stack/stacks of the operating unit/units of the Power Station conducting analysis (SPM, SOX, NOX all at 6% O2 correction and other necessary parameters) and submitting report etc. as per guideline / stipulation of MOEF, GOI/WBPCB/CPCB during 24(Twenty four) calendar months )
3CAAQMS DATA ( Sample collection for ambient air from 4 Nos. locations per month surrounding the Power Station conducting analyzing & submitting of report containing relevant parameters including PM2.5, PM10, SO2, NO2, CO, O3, NH3, Pb, C6H6, As, Bap, Ni (1 hour & 8 hour report for CO and O3 to be submitted separately) etc. all as per guidelines of MOEF ,GOI/WBPCB/CPCB during 24(Twenty four) calendar months. )
4AALYZING AND SUBMITTING REPORT OF ASH ( Collection of samples not exceeding 2 (two) of dry fly ash from silo & pond ash for analyzing and submitting report etc. all as per guideline/stipulation of MoEF&CC, GOI/CEA/ WBPCB showing different parameters i.e geotechnical & engineering properties, shear & consolidation properties, physical & chemical properties along with Cadmium, Arsenic, Thallium, Nickle, Lead, Zine, Selenium, Mercury, Hexavalent Chromium (as Cr+6) on Half-yearly basis. )
5MONITORING OF NOISE LEVEL ( Monitoring of Noise Level inside the Plant from four locations such as CHP crusher house, Turbine floor, Coal Mill, Boiler Feed pump Area and Township Area and others if required etc. analyzing and submitting of report etc. as per guideline/stipulation of MOEF,GOI/WBPCB. )
6ANALYSIS OF FUGITIVE AIR ( Collection of samples for fugitive air from 7 (seven) separate locations for analyzing & submitting of report etc. as per guideline/stipulation of MOEF,GOI/WBPCB. Parameters to be tested are: TSPM, PM10, SO2, NO2 and free available Silica on Half-yearly basis. )
7ANALYSIS OF EFFLUENT WATER OF ASH POND ( Collection of samples for analyzing liquid effluent water from Ash Pond “in service” and submitting report etc. as per guideline/stipulation of CEA,MOEF,GOI/WBPCB/ CPCB. Parameters to be tested are : Oil & Grease, BOD, COD, pH & TSS ( in mg/lit. except pH) during 24(Twenty four) calender months. )
8ANALYSIS OF EFFLUENT WATER BANPUR CANAL ( Collection of sample for analyzing liquid effluent water from Drainage Pump house to Ba-pur canal & submitting report etc. as per guideline/stipulation of CEA, MOEF, GOI/WBPCB/CPCB during 12(Twelve) calendar months. Parameters to be tested are: pH, TSS, BOD, COD, O &G, Free available chlorine, Fe, Cu, Cr, PO4 and Zn ( in mg/lit. except pH) during 24(Twenty four)calender months. )
9ANALYSIS OF EFFLUENT WATER OF CBD, BBD,E ( Collection of liquid effluent sample from ETP, Boiler Blowdown & Cooling Tower Blowdown for conducting, analyzing & submitting report, etc as per guideline/stipulation of CEA, MOEFGOI/WBPCB/CPCB during 12(Twelve) calendar months. Parameters to be tested are: pH, TSS, BOD, COD, O &G, Free available chlorine, Fe, Cu, Cr, PO4 and Zn ( in mg/lit. except pH) during 24(Twenty four) calender months. )
10ANALYSIS OF DRINKING WATER ( Collection of nos. of sample not exceeding 2 (two) location for analyzing drinking water from Power House and Township for analyzing and submitting report etc. Parameters to be tested are: Odor, Taste, pH, TDS, Hardness (as CaCO3), Alkalinity (as CaCO3), Nitrate, Sulphate, Fluoride, Chloride, Turbidity (NTU), Arsenic, Copper, Cadmium, Chromium, Lead, Iron, Zine, Fecal Coliform (cfu) & E. Coli (cfu) (All in mg/lit. except pH), during 24(Twenty four) calendar months )
11ASH POND, ETP, INTAKE PUMP HOUSE ,TUBE O ( Collection of samples from ash pond effluent water, ETP outlet, intake sump & a tube oil in vicinity of ash pond location number not exceeding 1 (one) analyzing and submitting report etc. all as per guideline / stipulation of MoEF&CC, GOI/WBPCB. Parameters to be tested are: Cadmium, Arsenic, Thallium, Nickle, Lead, Zine, Selenium, Mercury, Hexavalent Chromium (as Cr+6) on Half-yearly basis. )
12ANNUAL ENVIRONMENTAL STATEMENT PREPARAT ( Preparation of Annual Environmental Statement in form of Book 6 nos. per year )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail