Communications and Information Technology  Government Departments Closing in 0 days TDR #38808583

Tender For Selection Of Electrical Contractor For Supply Installation Testing And Commissioning Of 33Kv Rmu At Tech City Bongora Kamrup Assam

Issued by Government Departments · kamrup, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Sep 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kamrup → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Selection Of Electrical Contractor For Supply Installation Testing And Commissioning Of 33Kv Rmu At Tech City Bongora Kamrup Assam

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 16-Aug-2023 Date Extension Date 24-Aug-2023
2 24-Aug-2023 Date Extension II Date 01-Sep-2023
3 01-Sep-2023 Date Extension III Date 08-Sep-2023

BOQ

Name of Work: Selection of Electrical Contractor for “Supply, Installation, Testing & Commissioning of 33KV RMU” at Tech City, Bongora, Kamrup, Assam
Sl. No. Item Description
133KV Outdoor RMU
2Supplying, installation, testing & commissioning of 33 KV, 630 Amps, 25kA for 3 sec Outdoor extensible on one side 3-way SF6 gas insulated floor mounted with copper bus bar (APDCL APPROVED) Ring Main Unit should consist of 01 (One) Nos incoming Motorized Vacuum Circuit Breaker and 02 (Two) Outgoing Motorized Vacuum Circuit Breaker with Battery & Battery Charger. The coupling should be at the top of RMU through sleeved busbars covered with touch proof joints and bolted connections (plug in connections are not feasible due to outdoor requirements and foundation tolerances). All live parts, bus bars, VCB, Earthing Switches will be enclosed in robotically welded with minimum of 2.5 mm thick Stainless-steel tank, 2mm GI enclosure (CRCA not feasible looking into corrosion proof requirements) filled with SF6 at 1.4 bar with IP class IP67, leak rate less than 0.1% and tested as per latest IEC 62271-200. HT Panel shall be with fixed type VCB for 33KV earth system, 50Hz, AC three phase including over current and earth fault protection and motor operated spring charging mechanism for VCB panel. While refilling the SF6 gas the manometer should be able to show the pressure inside the Stainless-Steel tank with a dedicated gas topping up arrangement on the LV panel. The switchgear should be tested for Internal arc for both tank and cable box IAC AFLR (25kA-1 Sec) venting through bottom. The switchgear should be totally enclosed confirming to relevant IEC standard with fitting of protection relay with indicators as under:
3A)Each VCB - 03 No consisting of following:a) Motor operated 630 A Vacuum circuit breaker having two position spring mechanism. Motor control voltage 24 V DCb) Three position disconnector/earthing switch downstream vacuum circuit-breakerc) Anti-reflex operating handle d) Capacitive voltage indication fixed type VPIS 36 kVe) Emergency Trip push button to operated VCB f) 3O/C + 1E/F self-powered numerical protection relay with Low and High set for Over current and Earth Fault. Relay should have facility to display the maximum loaded phase current also. Relay shall record minimum 5 fault records with time stamping g) Ring core current transformer of 100-50/1A, 2.5 VA, 5P10 for protection - 3 Nosh) Mechanical ON/OFF/EARTH indication. i) Cable boxes suitable for 1 X 3C x 300 sq mm XLPE Cable with right angle Touch proof Cable Termination kitsj) Cable boxes should be 25kA for 1sec (Tank and cable box) Internal Arc Proof with all safety interlocking.
4B)Common Technical specifications of each Ring Main Unit should consist of –a) Nominal System Voltage: 33kVb) Voltage variation on supply side: +/-10 %c) Corresponding Highest System Voltage: 36kV.d) Frequency: 50 Hz with +/-3 % tolerancee) Transient condition: -20 % or + 10 % combined variation of Voltage and frequency.f) Number of Phase: 3 Phases. g) The RMU shall be true outdoor design without external separate enclosure or kiosk with IP54 protectionh) Neutral earthling: Solidly earthed.i) Fault level (minimum) kA /Sec: 25kA for 3sec.j) Lightning Impulse Withstand Voltage (kVp): 170k) One minute dry/wet power frequency withstand voltage primary (kV rms): 70l) Rated Dynamic Withstand Current for 1 second duration (kAp): 62.5m) Battery charger of 5 A and 2 sets of 12V DC, 7 AH Batteriesn) The complete Ring Main Unit shall be manufactured in India including complete SF6 insulated tank welding and assembly.o) Common handle for isolator and VCB operation.p) The coupling busbars shall be Touchproof copper busbars.

AI Tender Summary

OUR REF NO 38808583
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 08-09-2023
Authority
Authority Name Assam Electronics Development Corporation Limited
Work Description Selection Of Electrical Contractor For Supply Installation Testing And Commissioning Of 33Kv Rmu At Tech City Bongora Kamrup Assam
Basic Detail
Tender No AEDC/Tech-City/RMU/2023-24/01
Bidding Type Tender
Location
City kamrup
State Assam
Key Dates
Publish Date 01 Sep 2023
Submission Date 08 Sep 2023
Open Date 11 Sep 2023
Finance
Tender Value Ref. Documents
Tender Fee 5000
EMD 50000
Exemption Not Available
Document List
b4a00890-7238-4ced-bc4d-84ffea944a37.html
BOQ_50929.xls
RFP.pdf
Tendernotice_1.pdf
NIT.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 01, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 01, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 08, 2023
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 08, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 11, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b4a00890-7238-4ced-bc4d-84ffea944a37.html

xls

BOQ_50929.xls

pdf

RFP.pdf

pdf

Tendernotice_1.pdf

pdf

NIT.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders