Tender For Strengthening And Improvements To Riding Quality To Government Roads In Mettur (H) (C&M) Sub Division (Slm-25)1) Strengthening At Km.4/2-5/4 Of Thermal Power Plant Road (01-Cridp-23-24-S-0157)2) Improvements To Riding Quality At Km.0/0-3/0 Of S, edappady-Tamil Nadu

Highways Department-HD has published Tender For Strengthening And Improvements To Riding Quality To Government Roads In Mettur (H) (C&M) Sub Division (Slm-25)1) Strengthening At Km.4/2-5/4 Of Thermal Power Plant Road (01-Cridp-23-24-S-0157)2) Improvements To Riding Quality At Km.0/0-3/0 Of S. Submission Date for this Tender is 09-08-2023. Road Work Tenders in edappady Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38792328
Tender For Strengthening And Improvements To Riding Quality To Government Roads In Mettur (H) (C&M) Sub Division (Slm-25)1) Strengthening At Km.4/2-5/4 Of Thermal Power Plant Road (01-Cridp-23-24-S-0157)2) Improvements To Riding Quality At Km.0/0-3/0 Of S
Open Tender
Indian
Tamil Nadu
edappady
09-08-2023

Tender Details

Strengthening And Improvements To Riding Quality To Government Roads In Mettur ( H ) ( C&M ) Sub Division ( Slm-25 ) 1 ) Strengthening At Km.4 / 2-5 / 4 Of Thermal Power Plant Road ( 01-Cridp-23-24-S-0157 ) 2 ) Improvements To Riding Quality At Km.0 / 0-3 / 0 Of Salem Camp - Thottipatti Road ( 01-Cridp-23-24-I-1538 ) 3 ) Improvements To Riding Quality At Km.3 / 0-6 / 0 Of Raman Nagar - Koonandiyur Road ( 01-Cridp-23-24-I-1537 )

Key Value

Document Fees
Refer document
EMD
INR 165000.0 /-
Tender Value
INR 3.07 Crore /-

BOQ Items

Name of work : Strengthening and Improvements to Riding Quality to Government Roads in Mettur (H) (C&M) Sub Division (SLM-25) 1) Strengthening at Km.4/2-5/4 of Thermal Power Plant Road (01-CRIDP-23-24-S-0157) 2) Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road (01-CRIDP-23-24-I-1538) 3) Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road (01-CRIDP-23-24-I-1537)
Sl. No. Item Description
1Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 ofMORTH - Vth Revision etc.,complete.
23. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
3Wet Mix Macadam (Table 400-13): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 111, 112, 406 & 900 of MORTH Vth Revision
43. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
5Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev V etc.,complete by Mix in Place Method using Mini Hot Mix Plantfor Patch works
61. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
7Advance patch work 50mm thick using 45mm IRC size HBG metal for making thepot holesand patching usingVG-10 grade bitumen including mixing atthe rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc.,complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision
82. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
93. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
10Advance patch work 25mm thick using 13.20mm IRC size HBG metal for making thepot holesand patching usingVG-10 grade bitumen including mixing atthe rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc.,complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision
112. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
123. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
13Prime coat: Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision- over WMM/ WBM
143. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
15Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer
163. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
17Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces
181. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
192. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
203. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
21Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisherto the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.111, 112, 501, 505 & 900 - Grading II
221. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
23Bituminous Macadam :Providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)
242. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
253. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
26Bituminous Concrete (Table500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(Viscosity Grade-40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision complete in all respects - Grading II
271. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
28Bituminous Concrete (Table500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision complete in all respects - Grading II
292. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
303. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
31Excavation including removal and satisfactory disposal of all materias necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up berms using carted earth with conveyance of 3 Kms. as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision
321. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
332. Improvements to Riding Quality at Km.0/0-3/0 of Salem Camp - Thottipatti road
343. Improvements to Riding Quality at Km.3/0-6/0 of Raman Nagar - Koonandiyur road
35VibratedCement Concrete of grade M20 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost offormwork,mixing, layingand compacting using vibrator including hire and fuel chargesfor all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specificationfor Base Course of Crash Barrier Type Centre Median as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
361. Strengthening at Km.4/2-5/4 of Thermal Power Plant Road
37Calculation of SubTotal, GST and Total Amount carried out by system automatically
38Basic cost of value put to tender as per estimate
39Add GST at 18%
40Total Value put to Tender
41Negotiated Percentage
42Final Negotiated Value
43Add GST at 18% of Final Negotiated Value
44Total Value of Contract Including 18% of GST
45Basic cost of value put to tender as per Estimate
46Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail