Public Administrative Department Government Departments Closing in 0 days TDR #38786569

Annual Plan-2023-24 Kappumala Dwss Velom -912/24-General Civil Work

Issued by Government Departments · velom, Kerala
Tender Value
25.41 Lakhs
Estimated cost
Bid Submission
31 Jul 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
velom → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Plan-2023-24 Kappumala Dwss Velom -912 / 24-General Civil Work

BOQ

Work Name:Annual Plan-2023-24 Kappumala DWSS velom -912/24-General Civil Work
Sl. No. Item Description
1WELL
22.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
32.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
4OD65550/2023-2024: Extra for every additional lift 1.5 m or part there of in excavation / banking excavated orstacked materials.All kinds of soil-(7.5m -9m)
5OD65551/2023-2024: Extra for every additional lift 1.5 m or part there of in excavation / banking excavated orstacked materials.All kinds of soil-(6m-7.5m)
650.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
75.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
85.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
9OD65552/2023-2024:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
1050.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
114.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
124.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
1313.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
1410.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
15OVERHEAD TANK
162.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
174.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
185.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
195.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
205.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
215.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
224.12:Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer\"s specification .
235.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
245.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
255.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
265.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
275.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2813.6.1:20 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
2913.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
3010.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
312.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
3260.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
334.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
344.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
35PUMPING AND DISTRIBUTION LINE
36OD65553/2023-2024:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within alead of 50 m:All kinds of soilPipes, cables etc, not exceeding 80 mm dia
37OD65554/2023-2024:providing and fixing PVC pipes including of pipes with one step PVCsolvent cement,trenching refilling testing of joints complete as per direction oo Engineer charge.63mm dia 10Kgf/cm2.
38OD65555/2023-2024:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.32 mm dia 10.Kgf/cm(Modified item no:50.18.9.4.1 by Excluding trenching and refilling as per approved OD BY ee,lsgd,kozhikkode).
39OD65556/2023-2024:Providing and fixing PVC pipes includes jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm dia 10KGF/cm2(Modified item no50.18.9.3.2 by excluding trenching and refilling as per approved OD by EE LSGD KKD)

AI Tender Summary

OUR REF NO 38786569
AUTHORITY Government Departments
TENDER VALUE 25.41 Lakhs
LAST DATE 31-07-2023
Authority
Authority Name Local Self Government Department
Work Description Annual Plan-2023-24 Kappumala Dwss Velom -912 / 24-General Civil Work
Basic Detail
Tender No TA/LSGD/KKD/89/2023-24
Bidding Type Tender
Location
City velom
State Kerala
Key Dates
Publish Date 22 Jul 2023
Submission Date 31 Jul 2023
Open Date 02 Aug 2023
Finance
Tender Value 25.41 Lakhs
Tender Fee 2760
EMD 50000
Exemption Not Available
Document List
6fd975e8-db8b-4458-8c8e-3bd1704e4b48.html
Affidavit.pdf
BOQ_872138.xls
ePay.pdf
FIP.pdf
FOT.pdf
preliminary.pdf
SBD.pdf
TenderConditions.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 02, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

6fd975e8-db8b-4458-8c8e-3bd1704e4b48.html

pdf

Affidavit.pdf

xls

BOQ_872138.xls

pdf

ePay.pdf

pdf

FIP.pdf

pdf

FOT.pdf

pdf

preliminary.pdf

pdf

SBD.pdf

pdf

TenderConditions.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders