Tender For Shifting Of Electric Post For The Improvement Work At Hill Highway Favour Of Krfb Under Electrical Section Kakkayangad-Fitting And Erecting One Ht Psc Pole In Position Incl. Fitting Cross Arm, Digging & Back Filling Pit, Drawing Earth Leads. 2 Fitting And Erecting One Ht A Type Pole In Position Incl. Fitting Cross Arm, Digging & Back Filling Pit, Drawing Earth Leads. 3 Additional Rate For Providing One Disc Set On Any Type Of Ht Pole For Making Cut Point. 4 Fitting And Erecting One Ht Dp Using A Type Pole In Position Incl. Fitting 2 Channel Cross Arms, Digging & Back Filling Pit, Drawing Earth Leads. 5 Fitting And Providing One Ht Stay For 11Kv Pole Incl. Digging & Back Filling Pit. 6 Fitting And Providing One Strut Using Ht Psc Pole Incl. Digging & Back Filling Pit. 7 Fitting And Providing One Ht Fly Stay For 11Kv Pole Using Ht Psc Pole Incl. Digging & Back Filling Pits. 8 Fitting And Providing One Ht Fly Stay For 11Kv Pole Using A Type Pole Incl. Digging & Back Filling Pits. 9 Insertion Of One Ht Psc Pole In Existing Line Incl. Digging & Backfilling Pit, Fitting Cross Arm, Insulators, Binding Etc. 10 Additional Rate For Excavation Of One Pit For Ht Pole / Ht Stay In Laterite. 11 Additional Rate For Excavation Of One Pit For Ht Pole / Ht Stay In Hard Laterite. 12 Additional Rate For Excavation Of Pit For A Type Pole In Laterite. 13 Stringing Of One Km 11Kv Line With Acsr Raccoon ( 3 Conductors ) Incl. Cutting And Removing Tree Branches Wherever Necessary. 14 Fitting 5 Channel Cross Arms, Ab Switch, Do Fuse, La, Ht & Lt Connections On Existing Dp, 3 Lt Fuses. 15 Erecting One 100Kva Transformer To Existing Dp And Giving Connections, Incl. Loading & Unloading, Excluding Transportation. 16 Additional Rate For Excavation Of One Earth Pit ( 2.5M Depth ) In Laterite. 17 Additional Rate For Excavation Of One Earth Pit ( 2.5M Depth ) In Hard Laterite. 18 Fitting One Set Ab Switch And Giving Connection 19 Fitting One Additional V Cross Arm In Existing Single Pole Incl. Conveyance Of Materials. 20 Fitting One Additional 75X40mm, 1.8M Channel Cross Arm In Existing Single Pole Incl. Conveyance Of Materials. 21 Fitting One Additional 2.4M / 3M Channel Cross Arm ( 100X50x6mm ) , In Existing 11Kv Dp Incl. Conveyance Of Materials. 22 Fitting One Lt 4 Line Cross Arm On Ht Or Lt Existing Poles Incl. Fitting Insulators And Binding The Same With Lt Line. 23 Erecting One Lt Psc Pole In Position Incl. Digging & Back Filling Pit. 24 Providing Stay For Lt Poles Incl. Digging & Back Filling Pit. 25 Providing Strut Using Lt Psc Pole Incl. Digging & Back Filling Pit. 26 Providing Fly Stay For Lt Pole Using Lt Psc Pole Incl. Digging & Back Filling Pit. 27 Additional Rate For Excavation Of One Pit For Lt Pole / Lt Stay In Laterite. 28 Stringing One Km Lt 3Ph 4 Wire Line ( Rabbit For Ph, Weasel For N ) Incl. Fitting Cross Arm Etc. Removing Touchings And Conveyance Of Materials. 29 Fitting One No. Section Fuse On Lt Line With Dropping Cables, Crimping Sockets, Connecting With Bolt&Nut Etc. 30 Providing Wp Support With Psc Pole Incl. Digging & Back Filling Pit. 31 Renewal Of Existing Damaged / Old 11Kv Psc / Rcc Pole With New A Type Pole In Place And Refitting Of All Items Incl. Conveyance ( Except Pole ) . 32 Renewal Of Existing Damaged / Old 11Kv Stay With New Stay In Place Incl. Excavation & Backfilling Of Pit And Conveyance. 33 Re-Tensioning One Span 11Kv Line Incl. Replacing Insulators, Tightening Stay, Cutting Tree Branches And Conveyance. 34 Drilling Hole Of Various Sizes On Existing Channel / Cross Arm. 35 Renewal Of Existing Damaged / Old Lt Psc / Rcc ( 3Ph Line ) Pole With New Psc Pole In Place And Refitting Of All Items Incl. Conveyance ( Except Pole ) . 36 Reshackling One Span Lt Sph 2 Wire Oh Line, Replacing Insulators, Tightening Stay, Cutting Tree Branches Incl. Conveyance. 37 Reshackling One Span Lt 3Ph 4 Wire Oh Line, Replacing Insulators, Tightening Stay, Cutting Tree Branches Incl. Conveyance. 38 Reshackling One Span Lt Oh Addl Conductor, Replacing Insulators, Tightening Stay, Cutting Tree Branches Incl. Conveyance. 39 Transferring Lt Sph 2 / 3 Wire Oh Line To Newly Erected Ht / Lt Pole And Refitting All Items To The New Pole. 40 Transferring Lt 3Ph 4 / 5 Wire Oh Line To Newly Erected Ht / Lt Pole And Refitting All Items To The New Pole. 41 Dismantling And Reconnecting Sph Service Connection From The Oh Line Incl. Lowering Down The Wp Portion. 42 Dismantling And Reconnecting 3Ph Service Connection From The Oh Line Incl. Lowering Down The Wp Portion. 43 Dismantling One Damaged 11Kv Tw / Rsj / Rail Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 44 Dismantling One Damaged 11Kv Psc / Rcc Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 45 Dismantling ( Without Damage ) One 11Kv Psc / Rcc Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 46 Dismantling One Damaged 11Kv A Type Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 47 Dismantling ( Without Damage ) One 11Kv A Type Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 48 Dismantling ( Without Damage ) One Ht Psc / Rcc Strut Pole Incl. Removal Of Clamps And Stacking. 49 Dismantling ( Without Damage ) One Km 11Kv Line ( 3 Conductors ) , Crossarm, Insulators, Disc, Rolling The Conductor And Stacking. 50 Dismantling ( Without Damage ) One Ht Stay Incl. Back Filling, And Bringing Back To Section Store. 51 Dismantling One V Cross Arm / Channel Cross Arm From Existing Pole, And Bringing Back To Section Store. 52 Dismantling One Channel Cross Arm From Existing Dp Structure, And Bringing Back To Section Store. 53 Dismantling ( Without Damage ) One Ab Switch From Existing Structure And Bringing Back To Section Store. 54 Dismantling Transformer Station In Dp Structure Excluding The Rate Of Dismantling Earthing 55 Dismantling One Damaged Lt Psc / Rcc Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 56 Dismantling ( Without Damage ) One Lt Psc / Rcc Pole After Disconnecting Stays, Strut Etc. And Stacking The Same. 57 Dismantling ( Without Damage ) Lt Stay Incl. Digging Pit In All Classes Of Soil And Backfilling 58 Dismantling One Damaged Lt Psc / Rcc Strut Pole Incl. Removal Of Clamps And Stacking. 59 Dismantling ( Without Damage ) One Lt Psc / Rcc Strut Pole Incl. Removal Of Clamps And Stacking. 60 Dismantling ( Without Damage ) One Km Lt Sph 2 Wire Oh Line, Cross Arms, Insulators And Stacking The Conductors In Rolls. 61 Dismantling ( Without Damage ) One Km Lt 3Ph 4 Wire Oh Line, Cross Arms, Insulators And Stacking The Conductors In Rolls. 62 Dismantling ( Without Damage ) One Km Lt Additional Conductor Line, Cross Arms, Insulators And Stacking The Conductors In Rolls. 63 Dismantling One Ordinary Street Light / Cfl / Led Fitting From Existing Pole And Refitting The Same On Newly Erected Pole And Reconnecting. 64 Dismantling One Transformer Upto 160Kva From Structure And Loading To Vehicle Incl. Disconnecting Ht / Lt / Earth Connections. 65 Transporting Transformers By Hired Vehicle Upto 5Km And Upto 2 No. Of 63 To 250Kva Transformers / Rmus Excluding Loading & Unloading. 66 Providing Concrete Muffing ( 0.45X0.45X1.5M ) Inclusive Of Cost Of All Material ( As Per Specification ) . 67 Providing One Earth Using Earth Pipe Incl. Digging & Backfilling Pit And Supply Of Charcoal, Salt, Sand Etc. 68 Loading Ht Psc Pole From The Stacking Place And Unloading The Same At Work Site ( Transport By Vehicle ) . 69 Loading Ht A Type Pole From The Stacking Place And Unloading The Same At Work Site ( Transport By Vehicle ) . 70 Loading Lt Psc Pole From The Stacking Place And Unloading The Same At Work Site ( Transport By Vehicle ) . 71 Transporting Poles By Hired Vehicle To A Distance Upto 5Km And Carrying Upto 4 Poles Excluding Loading & Unloading. 72 Stringing Of 11 Kv Aerial Bunched Cable Of Size 3 X 150 + 1 X 120 Sqmm With Bare / Insulated Messenger Through Existing Poles 73 Erection Of Anchor / Dead End Clamp For 11Kv Abc Of Any Size 74 Erection Of Suspension Clamp For 11Kv Abc Of Any Size 75 Fiting One No Mvt On Existing Cross Arm Including 2 Nos End Termination ( For One Phase ) Of Any Rating For 11 Kv Ab Cable 76 Doing One Cable End Termination On Ht Abc Of Sizes Up To 3X150+1X120 Sqmm 77 Additional Rate For Excavation Of Pit For A Type Pole In Laterite. 78 Additional Rate For Excavation Of Pit For A Type Pole In Hard Laterite.