Tender For Strengthening/Replacement Of Damaged / Worn Out Components Of K.S.B Make 40 Mtrs Head, 3 Cusec Discharge With 85 H.P, K.R.T.K Submersible Motor-Pump Unit No. 2 With Re- Installation At L.I.S Dabbar Potha.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Jul 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
200
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Rajouri → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Strengthening/Replacement Of Damaged / Worn Out Components Of K.S.B Make 40 Mtrs Head, 3 Cusec Discharge With 85 H.P, K.R.T.K Submersible Motor-Pump Unit No. 2 With Re- Installation At L.I.S Dabbar Potha.
BOQ
| Sl. No. | Item Description |
| 1 | Strengthening by way of replacement of damaged components of K.S.B make 40 mtrs head, 3 cusec discharge with 85 H.P, K.R.T.K Submersible motor-pump unit with re- installation at L.I.S Dabbar Potha by Extraction of Motor-Pump Unit from the Sump tank of L.I.S Dabbar Potha by way of dismantling the complete pump set from delivery pipe. Extracting the pump set with the help of manually operated chain pulley block fitted with gantry from the sump & placing it at a suitable place at the top of the Sump tank. Shifting of pump set from top of the Sump tank of L.I.S. Dabbar Potha to the bank of the river at a height of approx. 10 feet with the help of chain pulley block and moving trolly fitted with gantry at site. Loading of pump set in a tractor trolley from the bank of river near the Sump tank after crawling/dragging pump set manually with the help of skilled/unskilled workers through a distance of 25 mtr. Up to loading point and then shifting to Dabbar Potha through river side path approx. 1 Km through tractor trolly and then further shifting to workshop with the help of pickup van/mechanical transportation. Job including all types of carriages, loading & unloading, as well as hire charges of the vehicle. Dismantling of K.S.B make 85H.P,K.R.T.K Submersible Motor Pump Unit No.1 at workshop for repairing motor and pump components. Complete overhauling of pump with fabrication and fitting of 01 No. gun metal wear ring of pump casing, 01 No. chuck nut, 1 No. guide bush and 01 No. steel space bush, 01 No. mesh seal oil rings along with rebuilding of 01 No. 356 mm multi channel Impeller by way of welding, turning and reconditioning.Providing and fitting of thrust plate, providing & fitting of silicon carbide mechanical seals of pump & motor side (02 Nos.), Strengthening of casing of pump of inlet & outlet diameters 150 mm of Nickel Cast Iron material. Rebuilding, reconditioningof worn out portions of 76 mm Dia. impeller shaft of material A.I.S.I-410 (H&T) by re-metalling with special Welding electrodes in layers and then turning, grinding, polishing, finishing on lathe machine including rebuilding, finishing of key ways to true size. Also removing/checking eccentricity of impeller shaft with dial-gauge at various off sets. Removing deflection/eccentricity by heat treatment on hydraulic press. Removing deflection on heads/ends and then checking the alignment of the shaft on lathe machine. Providing & fittingof new fabricated cotter pins.Complete rewinding of three phase squirrel cage, 4– Poles, 85 H.P submersible motor by dismantling the rotor and stator and then rewinding completely with the original specified rewinding wire & F class insulation material.Providing and fitting of new motor bush housing one no. as per sample and specifications. Assembling of complete unit of submersible pump and motor, filling of oil and testing in the workshop. Shifting of submersible pump set from workshop after repairing to village Dabbar Potha then shifting the pump set to sump site of L.I.S. Dabbar Potha through river path and unloading. Shifting of submersible pump set (complete assembly) up to unloading point to the river bank near sump tank of L.I.S.Dabbar Potha and then lowering to roof of the sump tank from the river bank with the help of chain pulley block and moving trolley fitted with the gantry at site with skilled/unskilled workers. Lowering of pump set complete assembly in the sump tank of L.I.S. Dabbar - Potha with the help of chain pulley block fitted with the gantry at site, fitting of pipes, bends Job also includes cutting & removing of worn out gaskets with providing new one to avoid any leakages to pipes & bend fitted at the delivery of the pump at both the ends then jointing/tightening the delivery pipe the pump to rising main. Providing all electrical connections and then testing, commissioning of pump set. Job including labour charges for skilled and semi skilled workers and cost of R.I. sheet joints.Complete Job. |
AI Tender Summary
Tender Timeline
Jul 21, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 27, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 29, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender