|
| 1 | ERECTION PART |
| 2 | Errection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect ,as per site Engineer driectioncomplete in all respect. (100 KVA S/Stn. Structure) |
| 3 | Providing and erection of Chain Link fencing , Angle Iron ,Gate etc for transformer fencing |
| 4 | Erection Part of 3-Phase LT Line |
| 5 | Erection of LT line.Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 6 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 7 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 8 | Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55 mm2) Conductor ofNew 3-Ph. L.T Line complete in all respect. |
| 9 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 10 | Mannual carriage of3- phase L.Tlines material&11/0.4kv.100 kva Sub Stationand etc. materials average distance as per site required.Loading of 3- phase L.Tlines material&11/0.4kv.100 kva Sub Stationmaterial and etc. on truck at Divisional Store and same material unloading at road head site.(If required as per site). |
| 11 | SUPPLY PART |
| 12 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV,100KVA |
| 13 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate |
| 14 | Prov. RCC Muffs with concerete filling |
| 15 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 16 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 17 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 18 | Transformer Belting & Knee Bracing |
| 19 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed] |
| 20 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer] |
| 21 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 22 | Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 23 | Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 24 | Transformer L.T Distribution Box and GO Switch fixing Assembly |
| 25 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 26 | Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 27 | Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm |
| 28 | Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type |
| 29 | Prov. D.O Fuse Unit |
| 30 | Prov. Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 31 | Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 32 | Prov. HT Stay set complete ( Unit set Qty. 8 |
| 33 | Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 34 | Prov. Pipe Earthing Set |
| 35 | Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm) inside .painted /powder coated after primar coating with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp |
| 36 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 37 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 38 | Prov. Multi Function Mono Chrome Laser Printer Brother DCP-B7500D :-Print, Scan, Copy (A4 Size Printer), Printing speed 28PPM, Duplex, Resolution 600dpi, Memory 64MB,Copy Speed 28CPM, Scan Black and Colour 6PPM & 3PPM, USB Port, Paper tray capacity 250pages, With one year Warranty |
| 39 | Prov.HP All-in-One Desktop model HP 200 G4 With :- Intel Core i5-1235U -12th Gen, Processor, 8GB DDR4RAM EXPANDABLE uoto 16GB, ITBHDD ( 7200RPM), 21\" ANTIGLARE LED display with FHD( 1920X1080) , integrated HD Graphics& Webcam, 2xUSB3.0, 2xUSB2.0, card reader , Audio port , VGA/HDMI/DP port. 10/100/1000MIPV6 compliant LAN, USB Keyboard & USB Mouse , Internal spkr. 1x802.11b/g/n/ac, PL- window 10pro64bit-OS;- with three year onsite Warranty |
| 40 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 41 | Prov. Aluminium Thimble |
| 42 | Prov. Aluminium Thimble |
| 43 | Prov. Danger Plate ( Unit Nos Qty 2 |
| 44 | Prov. Barbed Wire |
| 45 | Prov. LT Cable (3.5 Core) 240 mm² outgoing |
| 46 | Prov. LT Cable (3.5 Core) 400 mm² Incoming |
| 47 | Prov. Energy Meter (3-Phase, 4-Wire) DLMS compliant CT operatedStatic Tri-Vector meter with Box (CT-600/5 A) for 100 KVA Transformer |
| 48 | Prov. Aluminium Paint. |
| 49 | Prov. Red Oxide |
| 50 | Prov. Capacitor Bank 36 kVAr, 415V for 100 kVA DTR |
| 51 | Supply Partof 3-Phase LT Line |
| 52 | Prov.AAAC 7/3.15 (55 mm2) {Includes 3 conductor lengthsfor 3F,neutral conductor and Additional 1% (Sag, Jumpering and wastage} |
| 53 | Prov.Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) |
| 54 | Prov. RCC Muff with Concrete filling |
| 55 | Prov.Angle Iron (75x75x6) [length 1.50 mtr.+0.02 mtr.] |
| 56 | Prov.Shackle Insulator (16 kN) |
| 57 | Prov.D-Iron (U- Clamps) |
| 58 | Prov.Earth Knob |
| 59 | Prov.LT Stay Set( unit set , Qty. 10 |
| 60 | Prov.Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 61 | Prov.Kit KatI.C. |
| 62 | Prov.Full Clamp [2 Nos. for A.I + 1 No. for Stay Set] |
| 63 | Prov.LT Earthing Set complete ( Unit set, Qty. 10 |
| 64 | Prov.Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 65 | Prov.Spool Tie |
| 66 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 67 | Prov.Aluminium Paint |
| 68 | Prov.Red Oxide |
| 69 | Prov.Spiral PVC Spacer ( Unit Nos Qty. 32 |