| 1 | LT Line for DTR-1st |
| 2 | Prov. AAAC 7/3.15 mm(55mm2) |
| 3 | Prov. ST Pole 8 Mtr.W/L 180 Kgf/m2 |
| 4 | Prov. RCC Muff with concerete filling |
| 5 | Prov. Angle Iron(75x75x6) ,Length-1.50 Mtr + 0.02 Mtr |
| 6 | Prov. Shackle Insulator(16 kN) |
| 7 | Prov. D-Iron (U-Clamps) |
| 8 | Prov. Earth knob |
| 9 | Prov. LT Stay set |
| 10 | Prov. LT Stay wire7/3.15mm |
| 11 | Prov. Full Clamps (2 No for A.I + 1 No for Stay Set) |
| 12 | Prov. Earthing Set complete |
| 13 | Prov. G.I wire 8 SWG Earth wire |
| 14 | Prov. M.S Nuts & Bolt off size |
| 15 | Prov. Aluminium Paint |
| 16 | Prov. Red Oxide |
| 17 | TPT. Charges |
| 18 | New 1 -Ph 50mm |
| 19 | New 3 -Ph 50mm |
| 20 | Erection Charges |
| 21 | New 1 -Ph 50mm |
| 22 | New 3 -Ph 50mm |
| 23 | LT Line for DTR-2nd |
| 24 | Prov. AAAC 7/3.15 mm(55mm2) |
| 25 | Prov. ST Pole 8 Mtr.W/L 180 Kgf/m2 |
| 26 | Prov. RCC Muff with concerete filling |
| 27 | Prov. Angle Iron(75x75x6) ,Length-1.50 Mtr + 0.02 Mtr |
| 28 | Prov. Shackle Insulator(16 kN) |
| 29 | Prov. D-Iron (U-Clamps) |
| 30 | Prov. Earth knob |
| 31 | Prov. LT Stay set |
| 32 | Prov. LT Stay wire7/3.15mm |
| 33 | Prov. Full Clamps (2 No for A.I + 1 No for Stay Set) |
| 34 | Prov. Earthing Set complete |
| 35 | Prov. G.I wire 8 SWG Earth wire |
| 36 | Prov. M.S Nuts & Bolt off size |
| 37 | Prov. Aluminium Paint |
| 38 | Prov. Red Oxide |
| 39 | TPT. Charges |
| 40 | New 1 -Ph 50mm |
| 41 | New 3 -Ph 50mm |
| 42 | Erection Charges |
| 43 | New 1 -Ph 50mm |
| 44 | New 3 -Ph 50mm |
| 45 | LT Line for DTR-3rd |
| 46 | Prov. AAAC 7/3.15 mm(55mm2) |
| 47 | Prov. ST Pole 8 Mtr.W/L 180 Kgf/m2 |
| 48 | Prov. RCC Muff with concerete filling |
| 49 | Prov. Angle Iron(75x75x6) ,Length-1.50 Mtr + 0.02 Mtr |
| 50 | Prov. Shackle Insulator(16 kN) |
| 51 | Prov. D-Iron (U-Clamps) |
| 52 | Prov. Earth knob |
| 53 | Prov. LT Stay set |
| 54 | Prov. LT Stay wire7/3.15mm |
| 55 | Prov. Full Clamps (2 No for A.I + 1 No for Stay Set) |
| 56 | Prov. Earthing Set complete |
| 57 | Prov. G.I wire 8 SWG Earth wire |
| 58 | Prov. M.S Nuts & Bolt off size |
| 59 | Prov. Aluminium Paint |
| 60 | Prov. Red Oxide |
| 61 | TPT. Charges |
| 62 | New 1 -Ph 50mm |
| 63 | New 3 -Ph 50mm |
| 64 | Erection Charges |
| 65 | New 1 -Ph 50mm |
| 66 | New 3 -Ph 50mm |
| 67 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |