Uttar Pradesh Jal Nigam-UPJN has published Survey, Design, Construction, Testing And Commissioning Works Of Interception And Diversion Of Nehru Park Drain & Yadavpur Drain And Other Appurtenant Works In Sewerage District-E Of Nagar Nigam Prayagraj. Submission Date for this Tender is 26-07-2023. Survey Works Tenders in prayagraj Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Interception and Diversion arrangement for both drain |
2 | Site clearance and other unforeseen items. |
3 | Provision of nalla diversion at the time of cunstruction. |
4 | Excavation in foundation in ordinary soil (loam, clay & sand) including lift upto 1.5m and lead upto 50m watering & ramming of excavated earth into the trenches or into the space between the building and the sides of the foundation or into the plinth and disposal of surplus earth upto a distance of 50m from centre of trenches. In Screen Channel |
5 | 0.00 - 1.50 m. BGL |
6 | Filling, dressing and ramming earth or sand or bajri or ballast or kankar or single etc. including cost of materials. |
7 | Providing PCC in following proportion in foundation and floor including supply of all materials, labour, T&P etc. complete required for the work 1:4:8 with coarse sand and 4cm gauge stone ballast. |
8 | A. 0.00 - 1.50 m. BGL |
9 | RCC work with cement, coarse sand and graded stone aggregate 20mm nominal size in proportion of 1:1.5:3 including supply of the reinforcement and its bending but including its fixing and binding with 0.5mm thick binding wire (to be supplied by the contractor) & including necessary centering and shuttering, supply of all materials labour, T&P etc. required for proper completion of work. |
10 | Mild steel or iron in plain work such as R.C.C./ R.B. work wrought to required shape as neccesary including supply of all steel, bending & wastage, over laping & hooks etcfor proper completion of work. |
11 | supply of MS screen with 10 cm apurture and 10 cm thick for proper completion of work |
12 | Painting on new iron work with two coat primer and two coat epoxy paint including supply of all material labour for proper completion of work. |
13 | Providing and fixing c.i. footsteps in the walls. |
14 | Providing and fixing in position precast RCC manhole cover and frame of required shape and approved quality. Circular shape 560 mm internal dia. |
15 | Supply and fix MS made 1.00 m high railing of MS angle 50X50X5 etc. complete |
16 | Construction of Bituminous approach road |
17 | Shifting of existing sewer line for interception of Nehru Park drain |
18 | Provision ofsewage diversion of sewer line during dismentalling of sewer lineat the time of cunstruction including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
19 | MS sheet Barricading |
20 | Dismantling of roads for laying sewers including sorting out and stacking of serviciable materials, and diposal of unserviciable materials upto a distance of 60m and its reinstatement after filling and proper compaction of trenches.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
21 | Bitumen Road |
22 | Excavation for following depth below ground level for laying of sewers, manholes, gulley pits, sumps etc. in ordinary soil including cutting of joints pits, triming, dressing, leveling, refilling of trenches in 15 cm layer. @ 70% of total Quantity including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
23 | 3.00 - 4.50 m depth |
24 | 4.50 - 6.00 m. BGL |
25 | Bailing out or Pumping of sub soil water including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
26 | Cement concrete work in bedding below G.L. at specified depth with cement, coarse sand and 20 mm guage approved stone ballast (1:2:4) including supply of all materials, labour, T&P etc. required for proper completion of work. including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
27 | 4.50 - 6.00 m. BGL |
28 | Provide and fix for close timbering below ground level with 50 mm. Thick country wood planks 150 mm. X 75 mm. Indian sal wood walers and 125 mm. Thick sal ballies.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
29 | 3.00 - 6.00 m. BGL |
30 | Same as items 20 but left in Trenchess (used timbering) @ 2 % |
31 | 3.00 - 6.00 m. BGL |
32 | Dismantling of 350-600mm dia hume pipe sewer with due care so as to avoid damages to the sewers stacking of useful materials near the site with in 50 m laid and disposal of un-serviceable, materials.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
33 | 350 mm dia |
34 | 450 mm dia |
35 | Supply of following sizes of R.C.C. non pressure pipes with rubber gasket including all taxes. |
36 | 350 mm dia |
37 | 450 mm dia |
38 | Carting & Laying of following sizes of pipes including transportation, loading and unloadingand R.C.C. non pressure pipes class NP3socket/spigot rubber ring jointing and specials from store to the site of work lowering the same into trenches in the following depth below ground level, true to alignment, caulking the joints with necessary open yarn soaked.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
39 | 350 mm dia |
40 | 4.50 - 6.00 m. BGL |
41 | 450 mm dia |
42 | 4.50 - 6.00 m. BGL |
43 | Constructing brick masonry manhole circular/tapered type following internal dia and depth ( BGL) wise asrequired 560 mm internal dia at top with brick work in cement mortar 1:4 (cement : coarse sand) necessary excavation, foundation concrete 1:4:8 (cement :coarse sand :40 mm stone ballast) and plastering 20mm at outside of manhole and 12 mm thick at inner side of manhole with floating coat of neat cement , benching at the side of channel shall be at least 50 mm above crown of the pipe and the rise with a slope of 1 in 12 towards the sides of the manholes with smooth finished cunit and cover fixed in cement concrete 1:2:4 (cement : coarse sand : 20 mm size stone grit) including S/F SFRC cover & frame of heavy duty as per IS: 12592 : 2002 and plastic encapsuled foot steps required in inner side of manhole. ( manhole drawings annexured herewith) |
44 | 1800 m.m.dia. X 9000 mm depths |
45 | Permanent reinstatement of road including supply of all materials,labour,T&P etc. required for proper completion of works as per PWD road specifications.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
46 | Bitumen Road |
47 | Disposal of moorum/building rubbish/ malba/ surplus earth , similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. |
48 | Repair and diversion of existing serviceswater supply line, sewer line and sewer house connection etc. during the execution of work as per requirement.including supply of all material labour,T&P for proper completion of work as per direction of enginee in charge. |
49 | Laying of Sewer line for Nehru Park Drain |
50 | MS sheet Barricading |
51 | Dismantling of roads for laying sewers including sorting out and stacking of serviciable materials, and diposal of unserviciable materials upto a distance of 60m and its reinstatement after filling and proper compaction of trenches. |
52 | Bitumen Road |
53 | Excavation for following depth below ground level for laying of sewers, manholes, gulley pits, sumps etc. in ordinary soil including cutting of joints pits, triming, dressing, leveling, refilling of trenches in 15 cm layer. @ 70% of total Quantity including supply of all material labour,T&P for proper completion of work as per direction of Engineer in charge. |
54 | A. 0.00 - 1.50 m. depth |
55 | B. 1.50 - 3.00 m. depth |
56 | C. 3.00 - 4.50 m. depth |
57 | D. 4.50 - 6.00 m. depth |
58 | Bailing out or Pumping of sub soil water including supply of all material labour,T&P for proper completion of work as per direction of Engineer in charge. |
59 | Granular bedding with well graded granular material includingsuupply of material, labour, T&P etc. required for the proper completion of work including supply of all material labour,T&P for proper completion of work as per direction of Engineer in charge. |
60 | 1.50 - 3.00 m. depth |
61 | 3.00 - 4.50 m. depth |
62 | Cement concrete work in bedding below G.L. at specified depth with cement, coarse sand and 20 mm guage approved stone ballast (1:2:4) including supply of all materials, labour, T&P etc. required for proper completion of work. |
63 | 4.50 - 6.00 m. depth |
64 | Provide and fix open timbering (covering 1/3rd surface area by planks) in trenches for the depth from 0.00 to 3.00 m. below ground level consisting of 4.00 cm. thick approved country wood planks for polling boards (125 cm x 75 cm) Indian sal wood waler. including supply of all materials, labour, T&P etc. required for proper completion of work. |
65 | (a) 0.0 - 3.00 m |
66 | Same as above but for close timbering below ground level with 50 mm. Thick country wood planks 150 mm. X 75 mm. Indian sal wood walers and 125 mm. Thick sal ballies. |
67 | 3.00 - 6.00 m. depth |
68 | Same as items 37 but left in Trenchess (used timbering) @ 2 % |
69 | 3.00 - 6.00 m. depth |
70 | Supply of following sizes of class iii R.C.C. NP3 pipes with rubber gasket including all taxes. |
71 | 500 mm dia |
72 | Supply of following sizes of MS pipes (alongwith polyurethane coating) for trenchless casing work. |
73 | 500 mm dia |
74 | Carting and laying of following sizes of pipes including transportation, loading and unloadingand R.C.C. non pressure pipes class NP3 and NP4 socket/spigot rubber ring jointing and specials from store to the site of work lowering the same into trenches in the following depth below ground level, true to alignment, caulking the joints with necessary open yarn soaked. including supply of all materials, labour, T&P etc. required for proper completion of work. |
75 | 500 mm. Dia |
76 | 1.50 - 3.00 m. depth |
77 | 3.00 - 4.50 m. depth |
78 | 4.50 - 6.00 m. depth |
79 | Constructing brick masonry manhole circular/tapered type following internal dia and depth ( BGL) wise asrequired 560 mm internal dia at top with brick work in cement mortar 1:4 (cement : coarse sand) necessary excavation, foundation concrete 1:4:8 (cement :coarse sand :40 mm stone ballast) and plastering 20mm at outside of manhole and 12 mm thick at inner side of manhole with floating coat of neat cement , benching at the side of channel shall be at least 50 mm above crown of the pipe and the rise with a slope of 1 in 12 towards the sides of the manholes with smooth finished cunit and cover fixed in cement concrete 1:2:4 (cement : coarse sand : 20 mm size stone grit) including S/F SFRC cover & frame of heavy duty as per IS: 12592 : 2002 and plastic encapsuled foot steps required in inner side of manhole. ( manhole drawings annexured herewith) |
80 | 1200 m.m.dia. X 2300 m.m depths |
81 | 1500 m.m.dia. X 5000 mm depths |
82 | 1800 m.m.dia. X 9000 mm depths |
83 | Sand filling including supply of all materials, labout T&P etc. required for proper completion of work for road crossing and as and where required as per site conditiond during execution of work. |
84 | Permanent reinstatement of road including supply of all materials,labour,T&P etc. required for proper completion of works as per PWD road specifications. |
85 | Bitumen Road |
86 | Disposal of moorum/building rubbish/ malba/ surplus earth , similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineerr-in-charge. |
87 | Installation of product pipe by Micro Tunneling method including making of entry and exits pits, all related civil works like excavation, shoring /strutting, rtc. And Ground penetrating Radar survey, to Protect any existing utilities at the pipe installation location and restoration of site after completion. (Trenchless Technology by InsSTT-2019) |
88 | 500 mm dia pipe |
89 | Repair and diversion of existing serviceswater supply line, sewer line and sewer house connection etc. during the execution of work as per requirement. |
90 | Laying of Sewer line for Yadavpur Drain |
91 | Excavation for following depth below ground level for laying of sewers, manholes, gulley pits, sumps etc. in ordinary soil including cutting of joints pits, triming, dressing, leveling, refilling of trenches in 15 cm layer. @ 70% of total Quantity includingsuupply of material, labour, T&P etc. required for the proper completion of work |
92 | A. 0.00 - 1.50 m. depth |
93 | B. 1.50 - 3.00 m. depth |
94 | C. 3.00 - 4.50 m. depth |
95 | D. 4.50 - 6.00 m. depth |
96 | Bailing out or Pumping of sub soil water including supply of all material labour,T&P for proper completion of work as per direction of Engineer in charge. |
97 | Granular bedding with well graded granular material includingsuupply of material, labour, T&P etc. required for the proper completion of work |
98 | 1.50 - 3.00 m. depth |
99 | 3.00 - 4.50 m. depth |
100 | Cement concrete work in bedding below G.L. at specified depth with cement, coarse sand and 20 mm guage approved stone ballast (1:2:4) including supply of all materials, labour, T&P etc. required for proper completion of work. |
101 | 4.50 - 6.00 m. BGL |
102 | Provide and fix open timbering (covering 1/3rd surface area by planks) in trenches for the depth from 0.00 to 3.00 m. below ground level consisting of 4.00 cm. thick approved country wood planks for polling boards (125 cm x 75 cm) Indian sal wood waler. includingsuupply of material, labour, T&P etc. required for the proper completion of work |
103 | 0.0 - 3.00 m BGL |
104 | Same as above but for close timbering below ground level with 50 mm. Thick country wood planks 150 mm. X 75 mm. Indian sal wood walers and 125 mm. Thick sal ballies. |
105 | 3.00 - 6.00 m. BGL |
106 | Same as items 53 but left in Trenchess (used timbering) @ 2 % |
107 | 3.00 - 6.00 m. BGL |
108 | Supply of following sizes of class iii R.C.C. NP3 pipes with rubber gasket including all taxes. |
109 | 400 mm dia |
110 | Supply of following sizes of MSpipes for trenchless casing work. 400 mm dia |
111 | 400 mm dia |
112 | Carting and laying of following sizes of pipes including transportation, loading and unloadingand R.C.C. non pressure pipes class NP3 and NP4 socket/spigot rubber ring jointing and specials from store to the site of work lowering the same into trenches in the following depth below ground level, true to alignment, caulking the joints with necessary open yarn soaked.including supply of all materials, labour, T&P etc. required for proper completion of work. 400 mm dia |
113 | 1.50 - 3.00 m. depth |
114 | 3.00 - 4.50 m. depth |
115 | 4.50 - 6.00 m. depth |
116 | Constructing brick masonry manhole circular/tapered type following internal dia and depth ( BGL) wise asrequired 560 mm internal dia at top with brick work in cement mortar 1:4 (cement : coarse sand) necessary excavation, foundation concrete 1:4:8 (cement :coarse sand :40 mm stone ballast) and plastering 20mm at outside of manhole and 12 mm thick at inner side of manhole with floating coat of neat cement , benching at the side of channel shall be at least 50 mm above crown of the pipe and the rise with a slope of 1 in 12 towards the sides of the manholes with smooth finished cunit and cover fixed in cement concrete 1:2:4 (cement : coarse sand : 20 mm size stone grit) including S/F SFRC cover & frame of heavy duty as per IS: 12592 : 2002 and plastic encapsuled foot steps required in inner side of manhole. ( manhole drawings annexured herewith) |
117 | 1200 m.m.dia. X 2300 m.m depths |
118 | 1500 m.m.dia. X 5000 mm depths |
119 | 1800 m.m.dia. X 9000 mm depths |
120 | Dismantling of roads for laying sewers including sorting out and stacking of serviciable materials, and diposal of unserviciable materials upto a distance of 60m and its reinstatement after filling and proper compaction of trenches.including supply of all materials, labour, T&P etc. required for proper completion of work. |
121 | Bitumen Road |
122 | Permanent reinstatement of road including supply of all materials,labour,T&P etc. required for proper completion of works as per PWD road specifications.including supply of all materials, labour, T&P etc. required for proper completion of work. |
123 | Bitumen Road |
124 | Disposal of moorum/building rubbish/ malba/ surplus earth ,similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineerr-in-charge. |
125 | Installation of product pipe by Micro Tunneling method including making of entry and exits pits, all related civil works like excavation, shoring /strutting, rtc. And Ground penetrating Radar survey, to Protect any existing utilities at the pipe installation location and restoration of site after completion. (Trenchless Technology by InsSTT-2019) |
126 | 400 mm dia pipe |
127 | Repair and diversion of existing serviceswater supply line, sewer line and sewer house connection etc. during the execution of work as per requirement. |