Work Of 01 Additional 100 Kva Transformer In S.D.M. Colony Karvi Chitrakoot, 250 Kva Transformer Instead Of 100 Kva In Mulayam Nagar Shankar Bazar Karvi Chitrakoot And 250 Kva Transformer Instead Of 100 Kva In Village Ahiran Purva Karvi Chitrakoot Under B, karwi-Uttar Pradesh
Tender Notice
38727144
Work Of 01 Additional 100 Kva Transformer In S.D.M. Colony Karvi Chitrakoot, 250 Kva Transformer Instead Of 100 Kva In Mulayam Nagar Shankar Bazar Karvi Chitrakoot And 250 Kva Transformer Instead Of 100 Kva In Village Ahiran Purva Karvi Chitrakoot Under B
Tender
Indian
Uttar Pradesh
Karwi
24-07-2023
Tender Details
01 Additional 100 Kva Transformer In S.D.M. Colony Karvi Chitrakoot, 250 Kva Transformer Instead Of 100 Kva In Mulayam Nagar Shankar Bazar Karvi Chitrakoot And 250 Kva Transformer Instead Of 100 Kva In Village Ahiran Purva Karvi Chitrakoot Under Business Plan Of Karvi Chitrakoot ( Business Plan Year - 2023-24 ) . Installation Of Transformer, Installation Of 01 Additional 25 Kva Transformer Near Bankat Composite School And Construction Of 450 Meter Lt Line And Installation Of Damaged 11 Kv Xlp Cable Crossing The Railway Line Under 33 / 11 Kv Power Sub-Station - Ranipur Bhatt Village Patharodi, Chitrakoot.-2 Cartage Ofpole & Material From Store Centrefrom Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Inclading The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work 3 St Pole 11 Mtr Long 4 Pcc Pole 8.5 Mtr Long 5 11 Kv Disc Insulator With Gi Disc Fitting 6 11 Kv Poly Pin Insulator With Fitting 7 Ms Top Channel 8 T-Off Chanel 25X65x1300 Mm 9 Ms Dropper Channel 10 Base Angle For T / F 11 Clamp With Nut & Bolts For St&Pcc Poles 12 Acsr Weasel Conductor 13 Earthing Rod Complete 14 Stay Set Complete 15 Stay Insulator ( 70X50 ) Mm 16 Shackel Insulator 17 Piercing Connector 18 11 Kv Fuse Set 19 Ab Cable ( 3X50+1X35+1X16 ) Sq Mm 20 11 Kv Xlpe Cable 3X185 21 Transformer 25 Kva, 11 / 0.4Kv, 3Ph T / F 22 Transformer 100 Kva, 11 / 0.4Kv, 3Ph T / F 23 Transformer 250 Kva, 11 / 0.4Kv, 3Ph T / F 24 Erection Of 11 Mtr. Single St Pole Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 25 Erection Of 8.5 Mtr. Single Pcc Pole Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 26 Grouting Of 11 Mtr. Single St Poleper Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 27 Grouting Of8.5Mtr. Single Pcc Poleper Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 28 Erection Of Pcc& St Double-Pole Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Grouting Of Pcc& St Double-Pole Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 30 Erection And Grouting Of Earthing Rod Complete Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. 31 Erection And Grouting Of Stay Set Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. 32 Fixing & Commisioning Of 11 Kv Disc Insulator T&C Type 4500 Kg. With Disc Fitting As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 33 Fixing & Commisioning Of 11 Kv Pin Insulator With Pin, Nut & Bolt As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 34 Fixing & Commisioning Of T-Off Channel With Clamp As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 35 Fixing & Commisioning Of Top Channel With Clamp As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 36 Fixing & Commisioning Of Ms Dropper Channel With Clamp As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 37 Fixing & Commisioning Of Base Angle For T / F As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 38 Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 39 Laying Of Ab Cable ( 3X50+1X35+1X16 ) Sq Mmas Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 40 Installation Of25 Kva T / F 41 Installation Of100 Kva T / F 42 Installation Of250 Kva T / F 43 Construction Of New 250 Kva T / F Plinth & Francing Including Of First Class Brick Sand Cement Etc. As Per Resspo Manual ( All Civil Material Shall Be Arranged By Contractor ) 44 Dismentling & Carriage 100Kva From Old Site To Esc Chitrakoot Including The Cost Of Labour, T&P Carrier Etc Required For Proper Completion Of Work. 45 Fixing & Commisioning Of11 Kv Fuse Setas Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 46 Fixing & Commisioning Ofstay Insulator ( 70X50 ) Mmas Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 47 Fixing & Commisioning Of Shackel Insulatoras Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 48 Fixing & Commisioning Of Piercing Connector As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 49 Laying Of 11 Kv 3X185 Sq.Mm Xlpe Double Circuit Cable Protecting Through Hdd Method Insulated Cable To Be Laid Underground In Hdpe Pipe. ( Hdpe Pipe Shall Be Arranged By Contractor ) 50 Installation Of Heat Shrinkable Type Cable Jionting Kit O / D End Termination Suitable For 11 Kv Xlpe Cable Confirming To Is Esi-09-13-Is-13573 Of 1992 Amendment I&Ii Vde-0278 Of Latest Version There Of If Any. ( Jointing Kit Shall Be Arranged By Contractor ) 51 Hoisting And Fixing Of 11 Kv Cable On Existing / Erected Support With Provision Of Gi Pipe 6 Inch Dia 3 Mtr. Long Suitable Of 3X185 Sq.Mm Cable Fixing Of Proper Support And Its Clamping, Jumpering Properly As Per Resspo Norms. ( Gi Pipe 6 Inch Dia 3 Mtr. Long Shall Be Arranged By Contractor )
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.