Tender For Restoration, Conservation And Area Development Of Siddheshwar Group Of Temples,Devada Tal. Rajura, Dist. Chandrapur

Issued by Government Departments · rajura, Maharashtra
Tender Value
11.56 Crore
Estimated cost
Bid Submission
12 Aug 2023
0 days left
EMD
5.78 Lakhs
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
rajura → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Restoration, Conservation And Area Development Of Siddheshwar Group Of Temples,Devada Tal. Rajura, Dist. Chandrapur

BOQ

Name of Work: Proposed Restoration, Conservation & Area Development of Siddhshwar Group of Temples, Tal. Rajura, Dist. Chandrapur
Sl. No. Item Description
1Sub-Work: Conservation & Restoration of Temple No. 09Loweringdowncarefullyexistingstonemasonryofthemonumentmanuallyinproperorder including shifting the stone elements up to a distance of 50 meter beyond the monument area and stackingthemasdirectedby Engineerin-charge,removingbuilding rubbishandcleaning thesite etc. complete.
2Shifting & stacking properly of existing collapsed & Lowered stone members manual lite pillars, stone beam, stone karnasillass stone cap and other temple members in dry masonry including lifting, stones manually and striking lowering stone in proper order, numbering as directed by engineer incharge etc complete .(for lowering of any shape and size of columns, pedastals, bracket, beams, chajjas, karnashilla caps, other stone members of stone wall, etc.)
3ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.a) While lowering of members
4ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.b) While restoring the members
5Providing and using crane services for loading, unloading lifting and placing the carved stones at their respective location throughout the restoration process as directed by engineer in charge etc. complete. (crane of 5 M.T. capacity)
6Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingthe excavatedmaterialuptoadistanceof50m.beyondthebuilding areaand stackingandspreadingas directed, dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
7Excavationforfoundationinhardmurum includingremovingtheexcavatedmaterialupto distanceof50metresbeyondthebuildingareaandstackingandspreadingasdirected, dewatering,preparingthebedforthefoundationandnecessarybackfilling,ramming, watering including shoring and strutting etc. complete.complete. (Lift from 1.5 to 3.0 m) By Manual Means
8Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.
9Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. for pile filling and pile capsFor Plum Concrete. (30% Rubble Supply)
10Providing Dry Stone Masonry of trap / granite stones as per detailed specifications and drawings or as directed including in each course, headers hammer-dressed either height of the course are to be placed and to 1.5 metre (5?) apart, the stones need not be dressed, but should be as flat-bedded as possible, no stone shall be less in breadth or length than height and not joints shall be more than 12.5 mm. (½?), the work to be brought up with a better of not less than 1 in 12, etc. complete.
11Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone stone 90 cm x 60 cm x 30 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
12Providing/Re-settingAshlarFineMasonryofreuse-stonesinlimemortar1:1 inplinthasper detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, bailing out water, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
13Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 150 cm x 90 cm x 90 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pillars & Pillasters of Temple
14Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 75 cm x 75 cm x 75 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pedestals of Temple.
15Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 120 cm x 120 cm x 45 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Brackets of Temple
16Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 325 cm x 60 cm x 60 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Stone Beams of Temple.
17Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 152 cm x 152 cm x 30 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Slabs, Ceilings of Temple.
18Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size ofstone 54 cm x 45 cm x 20 cm as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1?), the jointsrunning true,the stonestobelaidwith joints notexceeding 8mm.(5/16?)thickandto be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true andaspershapeatleasthalfthedepthfromtheface,preparingthelimemortarinlimemiller, watering and all pavingwork when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement
19Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16?) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Pavement.
20Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
21Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete.The charges for chiselling & dressing on stone surface for grove and cuts at the stone surface after chisling a fine surface rate
22Surface Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate
23ProvidingLimePointingtostoneworkinlimemortar1:1insuperstructure,asperdetailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall beraisedorflatasmaydirected,preparingthelimemortarwith640grampulpofwoodapple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and allwork when handed over to be perfectly clean and free from all mortar stains etc. complete
24ProvidingFineCoatOf Limeover roughcastplasterinsuperstructure,asperdetailed specifications and drawings or as directed including the finishing coat is to be applied over rough castplasterandwell-polishedwithtrowel,preparingthelimemortar,scaffoldingandwatering complete.( For Waterproofing of roof )
25Providing and fixing Teak Wood Ledged Door (1.20 m. x 2.10 m.) with frame of 100 mm. x 125 mmsectionandLedgedshuttersdoubleleafasperdetailedspecificationsanddrawingsoras directedincludingthebestqualityandwell-seasonedMoulmeinteak,tobeproperlyframedand mortised together, vertical boards of 38 mm (1½?) thick and 17 cm. (3?) width connected together by 3 horizontal ledges of 38 mm (1½?) thick and 7.5 cm. width screwed across the back of the door, the boards to be planed, tongued and grooved, each leaf hung with 3 iron strap hinges 125 mm. with ironscrews,furnishedwithpairofaldrops16mm.diameter&300mm.length,pairofpatent handles 150 mm., pair of tower bolts 10 mm. dia. & 200 mm. length, tower bolt 10 mm. dia. & 200 mm. length, and pair of hooks & eyes 250 mm. all of irons etc. complete.
26Providingandapplyingprimingcoatovernewwoodandwoodbasedsurfaces,including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete
27Providing and applying two coats of lead / zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat etc. complete.
28Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre asperdrawing including fixtures,necessarywelding andpainting withone coatsof anticorrosive paint and two coats of oil painting complete.
29Disposing / comveying old stone members scattred in the temple premses with loading, unloading and properly stacking within 1 km distance from the site as directed by the engineer in charge etc. complete.
30Providing and supplying car rental service for the officials for site visits to the worksite during whole period of its execurion etc. complete
31Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5\" X 7\" Sizeoutdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shoot­ing, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete
32Co-ordinator for Archaeological Documentation Work: Archaeological documentation of all the monument premises parts, fixed and loose sculptures, antiquites, pottery, paintings, manuscripts, and all other ancient art objects located within premises. It would further requires correlating the same with history of monument and the region, which would help in building and showcasing art remains. the work would be based on principles and format of \"The Monument Survey\". the work would involve thorough archaeological exploration and survey on indivisual capacity, with the technical report prepared in prescribed digitalized format etc. complete
33Providing Senior Survyer / Research Assistant / Architect for preparation of Existing / proposed drawings and giving markout on site as per direction from Engineer in charge / ADA
34Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographsof the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA
35Carrying out Structural Audit of of the Structure with help of Non Distructive Testing (NDT) equipments etc. complete
36Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete
37Sub-Work: Conservation & Restoration of Temple No. 05Loweringdowncarefullyexistingstonemasonryofthemonumentmanuallyinproperorder including shifting the stone elements up to a distance of 50 meter beyond the monument area and stackingthemasdirectedby Engineerin-charge,removingbuilding rubbishandcleaning thesite etc. complete.
38Shifting & stacking properly of existing collapsed & Lowered stone members manual lite pillars, stone beam, stone karnasillass stone cap and other temple members in dry masonry including lifting, stones manually and striking lowering stone in proper order, numbering as directed by engineer incharge etc complete .(for lowering of any shape and size of columns, pedastals, bracket, beams, chajjas, karnashilla caps, other stone members of stone wall, etc.)
39ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.a) While lowering of members
40ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.b) While restoring the members
41Providing and using crane services for loading, unloading lifting and placing the carved stones at their respective location throughout the restoration process as directed by engineer in charge etc. complete. (crane of 5 M.T. capacity)
42Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingthe excavatedmaterialuptoadistanceof50m.beyondthebuilding areaand stackingandspreadingas directed, dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
43Excavationforfoundationinhardmurum includingremovingtheexcavatedmaterialupto distanceof50metresbeyondthebuildingareaandstackingandspreadingasdirected, dewatering,preparingthebedforthefoundationandnecessarybackfilling,ramming, watering including shoring and strutting etc. complete.complete. (Lift from 1.5 to 3.0 m) By Manual Means
44Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.
45Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. for pile filling and pile capsFor Plum Concrete. (30% Rubble Supply)
46Providing Dry Stone Masonry of trap / granite stones as per detailed specifications and drawings or as directed including in each course, headers hammer-dressed either height of the course are to be placed and to 1.5 metre (5?) apart, the stones need not be dressed, but should be as flat-bedded as possible, no stone shall be less in breadth or length than height and not joints shall be more than 12.5 mm. (½?), the work to be brought up with a better of not less than 1 in 12, etc. complete.
47Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone stone 90 cm x 60 cm x 30 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
48Providing/Re-settingAshlarFineMasonryofreuse-stonesinlimemortar1:1 inplinthasper detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, bailing out water, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
49Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 150 cm x 90 cm x 90 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pillars & Pillasters of Temple
50Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 75 cm x 75 cm x 75 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pedestals of Temple.
51Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 120 cm x 120 cm x 45 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Brackets of Temple.
52Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 325 cm x 60 cm x 60 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Stone Beams of Temple.
53Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 152 cm x 152 cm x 30 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Slabs, Ceilings of Temple.
54Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size ofstone 54 cm x 45 cm x 20 cm as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1?), the jointsrunning true,the stonestobelaidwith joints notexceeding 8mm.(5/16?)thickandto be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true andaspershapeatleasthalfthedepthfromtheface,preparingthelimemortarinlimemiller, watering and all pavingwork when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement
55Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16?) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Pavement
56Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete
57Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete.The charges for chiselling & dressing on stone surface for grove and cuts at the stone surface after chisling a fine surface rate
58Surface Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate
59ProvidingLimePointingtostoneworkinlimemortar1:1insuperstructure,asperdetailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall beraisedorflatasmaydirected,preparingthelimemortarwith640grampulpofwoodapple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and allworkwhen handed over to be perfectly clean and free from all mortar stains etc. complete
60ProvidingFineCoatOf Limeover roughcastplasterinsuperstructure,asperdetailed specifications and drawings or as directed including the finishing coat is to be applied over rough castplasterandwell-polishedwithtrowel,preparingthelimemortar,scaffoldingandwatering complete( For Waterproofing of roof ).
61Providing and fixing Teak Wood Ledged Door (1.20 m. x 2.10 m.) with frame of 100 mm. x 125 mmsectionandLedgedshuttersdoubleleafasperdetailedspecificationsanddrawingsoras directedincludingthebestqualityandwell-seasonedMoulmeinteak,tobeproperlyframedand mortised together, vertical boards of 38 mm (1½?) thick and 17 cm. (3?) width connected together by 3 horizontal ledges of 38 mm (1½?) thick and 7.5 cm. width screwed across the back of the door, the boards to be planed, tongued and grooved, each leaf hung with 3 iron strap hinges 125 mm. with ironscrews,furnishedwithpairofaldrops16mm.diameter&300mm.length,pairofpatent handles 150 mm., pair of tower bolts 10 mm. dia. & 200 mm. length, tower bolt 10 mm. dia. & 200 mm. length, and pair of hooks & eyes 250 mm. all of irons etc. complete
62Providingandapplyingprimingcoatovernewwoodandwoodbasedsurfaces,including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete
63Providing and applying two coats of lead / zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat etc. complete.
64Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre asperdrawing including fixtures,necessarywelding andpainting withone coatsof anticorrosive paint and two coats of oil painting complete.
65Disposing / comveying old stone members scattred in the temple premses with loading, unloading and properly stacking within 1 km distance from the site as directed by the engineer in charge etc. complete
66Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5\" X 7\" Sizeoutdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shoot­ing, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete
67Co-ordinator for Archaeological Documentation Work: Archaeological documentation of all the monument premises parts, fixed and loose sculptures, antiquites, pottery, paintings, manuscripts, and all other ancient art objects located within premises. It would further requires correlating the same with history of monument and the region, which would help in building and showcasing art remains. the work would be based on principles and format of \"The Monument Survey\". the work would involve thorough archaeological exploration and survey on indivisual capacity, with the technical report prepared in prescribed digitalized format etc. complete
68Providing Senior Survyer / Research Assistant / Architect for preparation of Existing / proposed drawings and giving markout on site as per direction from Engineer in charge / ADA
69Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographsof the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA
70Carrying out Structural Audit of of the Structure with help of Non Distructive Testing (NDT) equipments etc. complete
71Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete
72Sub-Work: Conservation & Restoration of Temple No. 03Loweringdowncarefullyexistingstonemasonryofthemonumentmanuallyinproperorder including shifting the stone elements up to a distance of 50 meter beyond the monument area and stackingthemasdirectedby Engineerin-charge,removingbuilding rubbishandcleaning thesiteetc. complete.
73Shifting & stacking properly of existing collapsed & Lowered stone members manual lite pillars, stone beam, stone karnasillass stone cap and other temple members in dry masonry including lifting, stones manually and striking lowering stone in proper order, numbering as directed by engineer incharge etc complete .(for lowering of any shape and size of columns, pedastals, bracket, beams, chajjas, karnashilla caps, other stone members of stone wall, etc.)
74ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.a) While lowering of members
75ProvidingSoil Bag Support to the monument with contractor´ssoil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags,removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the siteetc. complete.b) While restoring the members
76Providing and using crane services for loading, unloading lifting and placing the carved stones at their respective location throughout the restoration process as directed by engineer in charge etc. complete. (crane of 5 M.T. capacity)
77Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingthe excavatedmaterialuptoadistanceof50m.beyondthebuilding areaand stackingandspreadingas directed, dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
78Excavationforfoundationinhardmurum includingremovingtheexcavatedmaterialupto distanceof50metresbeyondthebuildingareaandstackingandspreadingasdirected, dewatering,preparingthebedforthefoundationandnecessarybackfilling,ramming, watering including shoring and strutting etc. complete.complete. (Lift from 1.5 to 3.0 m) By Manual Means
79Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.
80Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. for pile filling and pile caps For Plum Concrete. (30% Rubble Supply)
81Providing Dry Stone Masonry of trap / granite stones as per detailed specifications and drawings or as directed including in each course, headers hammer-dressed either height of the course are to be placed and to 1.5 metre (5?) apart, the stones need not be dressed, but should be as flat-bedded as possible, no stone shall be less in breadth or length than height and not joints shall be more than 12.5 mm. (½?), the work to be brought up with a better of not less than 1 in 12, etc. complete. (Size 0.6 x 0.45 x 0.45 m to 1.5 x 0.60 x 0.60 m)
82Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone stone 90 cm x 60 cm x 30 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
83Providing/Re-settingAshlarFineMasonryofreuse-stonesinlimemortar1:1 inplinthasper detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, bailing out water, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
84Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 150 cm x 90 cm x 90 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pillars & Pillasters of Temple
85Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 75 cm x 75 cm x 75 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pedestals of Temple.
86Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 120 cm x 120 cm x 45 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Brackets of Temple.
87Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 325 cm x 60 cm x 60 cm in superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Stone Beams of Temple.
88Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 152 cm x 152 cm x 30 cmin superstructureas per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind,dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?)in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, wateringandall masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Slabs, Ceilings of Temple.
89Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size ofstone 54 cm x 45 cm x 20 cm as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1?), the jointsrunning true,the stonestobelaidwith joints notexceeding 8mm.(5/16?)thickandto be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true andaspershapeatleasthalfthedepthfromtheface,preparingthelimemortarinlimemiller, watering and all pavingwork when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement
90Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16?) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Pavement
91Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete
92Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chiselling & dressing on stone surface for grove and cuts at the stone surface after chisling a fine surface rate
93Surface carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate
94ProvidingLimePointingtostoneworkinlimemortar1:1insuperstructure,asperdetailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall beraisedorflatasmaydirected,preparingthelimemortarwith640grampulpofwoodapple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and allwork when handed over to be perfectly clean and free from all mortar stains etc. complete
95ProvidingFineCoatOf Limeover roughcastplasterinsuperstructure,asperdetailed specifications and drawings or as directed including the finishing coat is to be applied over rough castplasterandwell-polishedwithtrowel,preparingthelimemortar,scaffoldingandwatering complete. ( For Waterproofing of roof )
96Providing and fixing Teak Wood Ledged Door (1.20 m. x 2.10 m.) with frame of 100 mm. x 125 mmsectionandLedgedshuttersdoubleleafasperdetailedspecificationsanddrawingsoras directedincludingthebestqualityandwell-seasonedMoulmeinteak,tobeproperlyframedand mortised together, vertical boards of 38 mm (1½?) thick and 17 cm. (3?) width connected together by 3 horizontal ledges of 38 mm (1½?) thick and 7.5 cm. width screwed across the back of the door, the boards to be planed, tongued and grooved, each leaf hung with 3 iron strap hinges 125 mm. with ironscrews,furnishedwithpairofaldrops16mm.diameter&300mm.length,pairofpatent handles 150 mm., pair of tower bolts 10 mm. dia. & 200 mm. length, tower bolt 10 mm. dia. & 200 mm. length, and pair of hooks & eyes 250 mm. all of irons etc. complete.
97Providingandapplyingprimingcoatovernewwoodandwoodbasedsurfaces,including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete
98Providing and applying two coats of lead / zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat etc. complete.
99Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre asperdrawing including fixtures,necessarywelding andpainting withone coatsof anticorrosive paint and two coats of oil painting complete.
100Disposing / comveying old stone members scattred in the temple premses with loading, unloading and properly stacking within 1 km distance from the site as directed by the engineer in charge etc. complete
101Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5\" X 7\" Sizeoutdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shoot­ing, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete
102Co-ordinator for Archaeological Documentation Work: Archaeological documentation of all the monument premises parts, fixed and loose sculptures, antiquites, pottery, paintings, manuscripts, and all other ancient art objects located within premises. It would further requires correlating the same with history of monument and the region, which would help in building and showcasing art remains. the work would be based on principles and format of \"The Monument Survey\". the work would involve thorough archaeological exploration and survey on indivisual capacity, with the technical report prepared in prescribed digitalized format etc. complete
103Providing Senior Survyer / Research Assistant / Architect for preparation of Existing / proposed drawings and giving markout on site as per direction from Engineer in charge / ADA
104Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographsof the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA
105Carrying out Structural Audit of of the Structure with help of Non Distructive Testing (NDT) equipments etc. complete
106Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete
107Sub-Work: Cultural Information BoardExcavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 0.0 m to 1.5 m.)
108Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete.
109Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
110Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructureas per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½?) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1?)where pointing or plastering tobe done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
111Providing Ashlar Facing Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ withsize of stone 90 cm x 60 cm x 30 cm in superstructure as per detailed specifications and drawings or as directed including t the stones be of approved quality, colour, hard and free from defect of any kind, he face of stones shall be rough-tooled, rustic (with or without chisel draft, except at quoins), or chamfered as specified, the beds and joints of all ashlar stones to be dressed perfectly true, square and full, headers shall not be less in length than breadth of ashlar stone plus 45 cm. (1?6?), the stones shall be set in mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?) in height averaging 4½ c.ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
112Providing and fixing 90cm x 60cm Granite plate engraving 10cm. Heightletter, figures including painting the lefters/figures with approved colour and shade complete (For size of granite plate 1.37 x 1.06 m of thickness 20 to 25 mm)
113ProvidingLimePointingtostoneworkinlimemortar1:1insuperstructure,asperdetailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall beraisedorflatasmaydirected,preparingthelimemortarwith640grampulpofwoodapple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and allwork when handed over to be perfectly clean and free from all mortar stains etc. complete
114Surface carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate.
115Sub-Work: Protection Notice BoardExcavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 0.0 m to 1.5 m.)
116Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete.
117Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
118Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructureas per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½?) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1?)where pointing or plastering tobe done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete
119Providing Ashlar Facing Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ withsize of stone 90 cm x 60 cm x 30 cm in superstructure as per detailed specifications and drawings or as directed including t the stones be of approved quality, colour, hard and free from defect of any kind, he face of stones shall be rough-tooled, rustic (with or without chisel draft, except at quoins), or chamfered as specified, the beds and joints of all ashlar stones to be dressed perfectly true, square and full, headers shall not be less in length than breadth of ashlar stone plus 45 cm. (1?6?), the stones shall be set in mortar, the beds or joints being in no case more than 3 mm. (??), the stone shall be laid in regular course not less than 30 cm. (12?) in height averaging 4½ c.ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
120Providing and fixing 90cm x 60cm Granite plate engraving 10cm. Heightletter, figures including painting the lefters/figures with approved colour and shade complete (For size of granite plate 1.37 x 1.06 m of thickness 20 to 25 mm)
121ProvidingLimePointingtostoneworkinlimemortar1:1insuperstructure,asperdetailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall beraisedorflatasmaydirected,preparingthelimemortarwith640grampulpofwoodapple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and allwork when handed over to be perfectly clean and free from all mortar stains etc. complete
122Surface carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate.
123Providing and fixing informatory sign boardsof size 0.90 x 0.60 m made out of 14 guage Aluminum sheet bonded with IRC Specified colour ofretro reflective sheeting of Type IV High Intensity Micro-Prismatic Grade Sheeting (HIP) having pressure sensitive / heat activated adhesive, IRC Specified colour retro reflective cutout border & messages having pressure sensitive adhesive having border & messages in IRC Specified colour background including on frame of with angle iron frame of size 35 x 35 x 5 mm and two M.S. angle iron post of size65 mm X 65 mm X 6 mm, 3.65 m long,duly paintedwith flat oil paint having alternate black and white bands of 25 cm width including G.I. fixtures etc; fixing the boards in 1:4:8 concrete block of size 60cm X 60cm X 75cm including transportation etc; complete.Alluminium sheet Type IV High Intensity Micro-Prismatic Grade Sheeting.

AI Tender Summary

OUR REF NO 38725943
AUTHORITY Government Departments
TENDER VALUE 11.56 Crore
LAST DATE 12-08-2023
Authority
Authority Name Department of Tourism and Cultural Affairs
Work Description Restoration, Conservation And Area Development Of Siddheshwar Group Of Temples,Devada Tal. Rajura, Dist. Chandrapur
Basic Detail
Tender No etender/Notice 05/2023-24
Bidding Type Tender
Location
City rajura
State Maharashtra
Key Dates
Publish Date 19 Jul 2023
Submission Date 12 Aug 2023
Open Date 17 Aug 2023
Finance
Tender Value 11.56 Crore
Tender Fee 3540
EMD 5.78 Lakhs
Exemption Not Available
Document List
68f1b8a8-447c-4cc7-9754-74b03dad0b5a.html
BOQ_1615320.xls
Sidheshwartender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 19, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 17, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

68f1b8a8-447c-4cc7-9754-74b03dad0b5a.html

xls

BOQ_1615320.xls

pdf

Sidheshwartender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders