Laying Distribution Pipe Line With Rising Main Switch Room Along With Pvc Water Storage Ohr Having Capacity 20 Cum Development Hw Site Fhtc And 2 Yrs. Om Under Jjm For Hariatara Pwss Zone_Iii In Kgp_I Block Under Midnapore Division Phe Dte. Part_Ii
Tender Overview
Project Description
Laying Distribution Pipe Line With Rising Main Switch Room Along With Pvc Water Storage Ohr Having Capacity 20 Cum Development Hw Site Fhtc And 2 Yrs. Om Under Jjm For Hariatara Pwss Zone_Iii In Kgp_I Block Under Midnapore Division Phe Dte. Part_Ii
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Aug-2023 | Date_Extension | Date | 04-Sep-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Components of Works |
| 2 | Laying Pipe line (Distribution System & Rising Main) for the Proposed Pipe Water Supply Scheme forHariatora & its Adjoining mouzas ( Zone-III ) Block- Kharagpur-I , District: - Paschim Midnapore as per Schedule of work (Annexure-I) |
| 3 | Construction ofSwitch Room (3750 X 2550) along with PVC water storage OHR having capacity 20.00 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. febricated structure of Proposed Pipe Water Supply Scheme for Hariatora & its adjoining Mouzas (Zone -III,) , Block: - Kharagpur - I, District: - Paschim Midnapore as per Schedule of work (Annexure-II) |
| 4 | Development of H/W site i,e, (Const. of boundary fencing, provision of M.S. Gate, land development, Approach Road etc.)for the ProposedWater Supply Scheme for Mouzas: -Hariatora & its Adjoining Mouzas ( Zone III) , Block: - Kharagpur I , District: - Paschim Midnapore as per Schedule of work (Annexure-III) |
| 5 | Accommodate FHTC (117) including supplying, laying, fitting, fixing of 15mm dia. NB PVC(Sch-80)/20mm dia. HDPE(PE-100, PN-16) Pipe with all necessary specials, saddle piece etc. all complete including cost of all materials under JJM of Hariatora & its adjoining Mouza (Zone I) PWSS Water Supply Scheme withinKharagpur I Dev. Blockof Midnapore Division PHE Dte. in the District of Paschim Medinipur as per Schedule of work (Annexure-IV) |
| 6 | Operation & Maintenance of distribution system including Rising main, FHTC, OHR & deployment of manpower in Hariatora and its adjoining mouzas(Zone-III) checking of status of supply in the command area, repairing of leakages brusting pipe line, including round the clock watch & ward to ensure supply of potable water throght out the command area of the scheme. After Successfully completion of the scheme in all respect and as per direction of EIC. (Payments of valve operators to be made as per approved PHE Rate). Considering One no valve Operator& plumbing mistry for reparing of FHTC as an when required. FOR ZONE-III |
| 7 | Add GST (SGST + CGST) @ 18% on basic price of Schedule of Work from Sl. No. 1.01 to 5 |
| 8 | Add @ 1% Labour Welfare Cess on basic price of Schedule of Work including GST from Sl. No. 1.01 to 6 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender