Tender For Tn04-02-14 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P14 - Construction Of Community Soak Pits H/O Bedrahalli Panchayat - P14
Tender Value
3.62 Lakhs
Estimated cost
Bid Submission
25 Jul 2023
0 days left
EMD
3625
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nallampalli → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tn04-02-14 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P14 - Construction Of Community Soak Pits H/O Bedrahalli Panchayat - P14 Construction Of Community Soak Pits H/O Bedrahalli Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Community Soak Pits H/oBedrahalli Panchayatt-CSP - 1. |
| 2 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 3 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 4 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 5 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 6 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 7 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 8 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 9 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 10 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 11 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 12 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 13 | Towards Name board charges |
| 14 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 2. |
| 15 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 16 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 17 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 18 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 19 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 20 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 21 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 22 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 23 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 24 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 25 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 26 | Towards Name board charges |
| 27 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 3. |
| 28 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 29 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 30 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 31 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 32 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 33 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 34 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 35 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 36 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 37 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 38 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 39 | Towards Name board charges |
| 40 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 4. |
| 41 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 42 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 43 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 44 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 45 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 46 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 47 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 48 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 49 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 50 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 51 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 52 | Towards Name board charges |
| 53 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 5. |
| 54 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 55 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 56 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 57 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 58 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 59 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 60 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 61 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 62 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 63 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 64 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 65 | Towards Name board charges |
| 66 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 6. |
| 67 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 68 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 69 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 70 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 71 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 72 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 73 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 74 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 75 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 76 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 77 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 78 | Towards Name board charges |
| 79 | Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 7. |
| 80 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 81 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 82 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 83 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 84 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 85 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 86 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 87 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 88 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 89 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 90 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 91 | Towards Name board charges |
| 92 | Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 8. |
| 93 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 94 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 95 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 96 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 97 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 98 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 99 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 100 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 101 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 102 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 103 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 104 | Towards Name board charges |
| 105 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 9. |
| 106 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 107 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 108 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 109 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 110 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 111 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 112 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 113 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 114 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 115 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 116 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 117 | Towards Name board charges |
| 118 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 10. |
| 119 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 120 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 121 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 122 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 123 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 124 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 125 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 126 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 127 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 128 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 129 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 130 | Towards Name board charges |
| 131 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 11. |
| 132 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 133 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 134 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 135 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 136 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 137 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 138 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 139 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 140 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 141 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 142 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 143 | Towards Name board charges |
| 144 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 12. |
| 145 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 146 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 147 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 148 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 149 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 150 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 151 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 152 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 153 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 154 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 155 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 156 | Towards Name board charges |
| 157 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 13. |
| 158 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 159 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 160 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 161 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 162 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 163 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 164 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 165 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 166 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 167 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 168 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 169 | Towards Name board charges |
| 170 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 14. |
| 171 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 172 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 173 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 174 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 175 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 176 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 177 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 178 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 179 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 180 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 181 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 182 | Towards Name board charges |
| 183 | Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 15. |
| 184 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 185 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 186 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 187 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 188 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 189 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 190 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 191 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 192 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 193 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 194 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 195 | Towards Name board charges |
| 196 | Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 16. |
| 197 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 198 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 199 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 200 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 201 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 202 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 203 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 204 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 205 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 206 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 207 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 208 | Towards Name board charges |
| 209 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 17. |
| 210 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 211 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 212 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 213 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 214 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 215 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 216 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 217 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 218 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 219 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 220 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 221 | Towards Name board charges |
| 222 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 18. |
| 223 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 224 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 225 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 226 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 227 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 228 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 229 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 230 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 231 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 232 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 233 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 234 | Towards Name board charges |
| 235 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 19. |
| 236 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 237 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 238 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 239 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 240 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 241 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 242 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 243 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 244 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 245 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 246 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 247 | Towards Name board charges |
| 248 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 20. |
| 249 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 250 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 251 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 252 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 253 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 254 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 255 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 256 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 257 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 258 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 259 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 260 | Towards Name board charges |
| 261 | Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 21. |
| 262 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 263 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 264 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 265 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 266 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 267 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 268 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 269 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 270 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 271 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 272 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 273 | Towards Name board charges |
| 274 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 22. |
| 275 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 276 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 277 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 278 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 279 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 280 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 281 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 282 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 283 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 284 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 285 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 286 | Towards Name board charges |
| 287 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 23. |
| 288 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 289 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 290 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 291 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 292 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 293 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 294 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 295 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 296 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 297 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 298 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 299 | Towards Name board charges |
| 300 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 24. |
| 301 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 302 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 303 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 304 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 305 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 306 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 307 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 308 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 309 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 310 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 311 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 312 | Towards Name board charges |
| 313 | Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 25. |
| 314 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 315 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 316 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 317 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 318 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 319 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 320 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 321 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 322 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 323 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 324 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 325 | Towards Name board charges |
| 326 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Jul 19, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 25, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 25, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender