Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #38713310

Tender For Tn04-02-14 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P14 - Construction Of Community Soak Pits H/O Bedrahalli Panchayat - P14

Issued by Local Bodies · nallampalli, Tamil Nadu
Tender Value
3.62 Lakhs
Estimated cost
Bid Submission
25 Jul 2023
0 days left
EMD
3625
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
nallampalli → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tn04-02-14 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P14 - Construction Of Community Soak Pits H/O Bedrahalli Panchayat - P14 Construction Of Community Soak Pits H/O Bedrahalli Panchayat

BOQ

Name of Work:
Sl. No. Item Description
1Construction of Community Soak Pits H/oBedrahalli Panchayatt-CSP - 1.
2Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
3Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
4Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
5Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
6Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
7Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
8Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
9Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
10Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
11Provision for Leading Channel (or) Connecting with PVC Pipe
12Colour washing for alround wallWall alround soakpitPlatform alroundChamber
13Towards Name board charges
14Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 2.
15Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
16Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
17Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
18Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
19Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
20Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
21Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
22Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
23Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
24Provision for Leading Channel (or) Connecting with PVC Pipe
25Colour washing for alround wallWall alround soakpitPlatform alroundChamber
26Towards Name board charges
27Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 3.
28Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
29Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
30Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
31Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
32Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
33Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
34Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
35Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
36Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
37Provision for Leading Channel (or) Connecting with PVC Pipe
38Colour washing for alround wallWall alround soakpitPlatform alroundChamber
39Towards Name board charges
40Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 4.
41Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
42Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
43Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
44Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
45Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
46Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
47Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
48Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
49Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
50Provision for Leading Channel (or) Connecting with PVC Pipe
51Colour washing for alround wallWall alround soakpitPlatform alroundChamber
52Towards Name board charges
53Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 5.
54Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
55Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
56Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
57Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
58Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
59Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
60Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
61Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
62Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
63Provision for Leading Channel (or) Connecting with PVC Pipe
64Colour washing for alround wallWall alround soakpitPlatform alroundChamber
65Towards Name board charges
66Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 6.
67Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
68Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
69Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
70Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
71Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
72Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
73Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
74Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
75Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
76Provision for Leading Channel (or) Connecting with PVC Pipe
77Colour washing for alround wallWall alround soakpitPlatform alroundChamber
78Towards Name board charges
79Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 7.
80Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
81Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
82Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
83Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
84Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
85Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
86Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
87Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
88Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
89Provision for Leading Channel (or) Connecting with PVC Pipe
90Colour washing for alround wallWall alround soakpitPlatform alroundChamber
91Towards Name board charges
92Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 8.
93Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
94Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
95Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
96Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
97Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
98Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
99Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
100Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
101Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
102Provision for Leading Channel (or) Connecting with PVC Pipe
103Colour washing for alround wallWall alround soakpitPlatform alroundChamber
104Towards Name board charges
105Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 9.
106Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
107Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
108Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
109Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
110Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
111Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
112Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
113Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
114Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
115Provision for Leading Channel (or) Connecting with PVC Pipe
116Colour washing for alround wallWall alround soakpitPlatform alroundChamber
117Towards Name board charges
118Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 10.
119Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
120Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
121Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
122Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
123Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
124Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
125Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
126Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
127Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
128Provision for Leading Channel (or) Connecting with PVC Pipe
129Colour washing for alround wallWall alround soakpitPlatform alroundChamber
130Towards Name board charges
131Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 11.
132Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
133Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
134Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
135Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
136Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
137Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
138Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
139Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
140Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
141Provision for Leading Channel (or) Connecting with PVC Pipe
142Colour washing for alround wallWall alround soakpitPlatform alroundChamber
143Towards Name board charges
144Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 12.
145Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
146Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
147Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
148Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
149Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
150Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
151Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
152Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
153Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
154Provision for Leading Channel (or) Connecting with PVC Pipe
155Colour washing for alround wallWall alround soakpitPlatform alroundChamber
156Towards Name board charges
157Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 13.
158Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
159Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
160Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
161Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
162Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
163Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
164Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
165Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
166Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
167Provision for Leading Channel (or) Connecting with PVC Pipe
168Colour washing for alround wallWall alround soakpitPlatform alroundChamber
169Towards Name board charges
170Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 14.
171Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
172Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
173Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
174Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
175Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
176Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
177Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
178Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
179Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
180Provision for Leading Channel (or) Connecting with PVC Pipe
181Colour washing for alround wallWall alround soakpitPlatform alroundChamber
182Towards Name board charges
183Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 15.
184Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
185Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
186Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
187Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
188Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
189Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
190Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
191Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
192Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
193Provision for Leading Channel (or) Connecting with PVC Pipe
194Colour washing for alround wallWall alround soakpitPlatform alroundChamber
195Towards Name board charges
196Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 16.
197Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
198Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
199Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
200Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
201Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
202Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
203Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
204Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
205Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
206Provision for Leading Channel (or) Connecting with PVC Pipe
207Colour washing for alround wallWall alround soakpitPlatform alroundChamber
208Towards Name board charges
209Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 17.
210Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
211Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
212Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
213Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
214Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
215Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
216Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
217Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
218Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
219Provision for Leading Channel (or) Connecting with PVC Pipe
220Colour washing for alround wallWall alround soakpitPlatform alroundChamber
221Towards Name board charges
222Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 18.
223Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
224Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
225Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
226Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
227Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
228Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
229Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
230Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
231Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
232Provision for Leading Channel (or) Connecting with PVC Pipe
233Colour washing for alround wallWall alround soakpitPlatform alroundChamber
234Towards Name board charges
235Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 19.
236Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
237Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
238Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
239Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
240Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
241Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
242Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
243Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
244Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
245Provision for Leading Channel (or) Connecting with PVC Pipe
246Colour washing for alround wallWall alround soakpitPlatform alroundChamber
247Towards Name board charges
248Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 20.
249Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
250Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
251Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
252Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
253Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
254Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
255Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
256Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
257Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
258Provision for Leading Channel (or) Connecting with PVC Pipe
259Colour washing for alround wallWall alround soakpitPlatform alroundChamber
260Towards Name board charges
261Construction of Community Soak Pits H/oBedrahalli Panchayatt - CSP - 21.
262Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
263Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
264Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
265Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
266Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
267Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
268Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
269Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
270Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
271Provision for Leading Channel (or) Connecting with PVC Pipe
272Colour washing for alround wallWall alround soakpitPlatform alroundChamber
273Towards Name board charges
274Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 22.
275Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
276Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
277Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
278Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
279Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
280Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
281Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
282Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
283Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
284Provision for Leading Channel (or) Connecting with PVC Pipe
285Colour washing for alround wallWall alround soakpitPlatform alroundChamber
286Towards Name board charges
287Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 23.
288Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
289Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
290Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
291Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
292Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
293Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
294Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
295Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
296Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
297Provision for Leading Channel (or) Connecting with PVC Pipe
298Colour washing for alround wallWall alround soakpitPlatform alroundChamber
299Towards Name board charges
300Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 24.
301Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
302Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
303Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
304Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
305Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
306Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
307Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
308Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
309Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
310Provision for Leading Channel (or) Connecting with PVC Pipe
311Colour washing for alround wallWall alround soakpitPlatform alroundChamber
312Towards Name board charges
313Construction of Community Soak Pits H/oBedrahalli Panchayatt- CSP - 25.
314Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform
315Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit
316Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit
317Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings
318Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos
319Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber
320Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround
321Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber
322Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom
323Provision for Leading Channel (or) Connecting with PVC Pipe
324Colour washing for alround wallWall alround soakpitPlatform alroundChamber
325Towards Name board charges
326GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 38713310
AUTHORITY Local Bodies
TENDER VALUE 3.62 Lakhs
LAST DATE 25-07-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tn04-02-14 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P14 - Construction Of Community Soak Pits H/O Bedrahalli Panchayat - P14 Construction Of Community Soak Pits H/O Bedrahalli Panchayat
Basic Detail
Tender No Roc.No.2672/2022/B5, Dt. 13.07.2023 - P14
Bidding Type Tender
Location
City nallampalli
State Tamil Nadu
Key Dates
Publish Date 19 Jul 2023
Submission Date 25 Jul 2023
Open Date 25 Jul 2023
Finance
Tender Value 3.62 Lakhs
Tender Fee Ref. Documents
EMD 3625
Exemption Not Available
Document List
BOQ_412226.xls
Price14.pdf
Tech14.pdf
Tendernotice_1.pdf
004c1e13-bfde-4c8e-91e0-64107127c938.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 19, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 25, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 25, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_412226.xls

pdf

Price14.pdf

pdf

Tech14.pdf

pdf

Tendernotice_1.pdf

html

004c1e13-bfde-4c8e-91e0-64107127c938.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders