|
| 1 | M&L Overhauling and servicing of split type AC of capacity 1.5/2.0 TR of any make at different locations atLekhapani, testing the unit with the following tasks,complete all as specified and directed by Eng-in-charge :- (a) Overhauling & servicing.(b)Inspection opening washing the condensor coil and cooling coil with chemical followed with pressurized water jet complete. (c)Inspection and treatment of leakage of refrigerant in the system. (d) Checking of operation of blower motor, condesnor motor and swing motor for noise free operations. (e) Oiling of condensor / blower motors and checking the earth continuity. (f) Inspection of all electrical parts / connections and rectification of any small defect. (g) Checking of functional of electronic remote control unit /PCB to ensure satisfactory functioning of indoor/outdoor unit complete. (h) Inspection and treatment of leakage water from indoor unit.(j) Replacing minor spares (ie groomet rubber/rubber lining/washers/nuts & bolt) as required Note:- During servicing of unit, if any major spares / parts are required to be replaced,the same shall be measured and paid separately under respective items mentioned here- in - after as S&F including removing old un serviceable spare parts. |
| 2 | All as per item 1.00 above but for Window type AC of capacity 1.5 / 2.0 TR. |
| 3 | S&F in replacement blower motor for Indoor unit of same specification/make as per existing one, suitable for all type split type AC 1.5/2.0 TR capacity including taking out of old unserviceable one complete all asspicified and directed by Eng-in-charge. |
| 4 | S&F in replacement blower fan for indoor unit, of same specification/make as per existing one suitable for all type split type AC 2.0/1.5 TR capacityincluding taking out of old unserviceable one complete all asspicified and directed by Eng-in-charge. |
| 5 | S&F in replacement blower fan with blower motor suitable for window type AC, of same specification/make as per existing one suitable for all type window type AC 2.0/1.5 TR capacity complete including taking out of old unserviceable one complete all asspicified and directed by Eng-in-charge. |
| 6 | S&F in replacement condensor fan motor with blade for outdoor unit, of same specification/make as per existing one, suitable for all type split/window type AC 1.5/2.0TR capacity complete including taking out of old unserviceable one complete all asspicified and directed by Eng-in-charge. |
| 7 | S&F in replacement hermitically type sealed, scroll or reciprocating , variable/ fixed speed compressor for all type split/windowAC of capacity 1.5/2.0 TR as per existing including brazing work, laying of extra copper tubing, pressure testing, dehydration, gas charging upto required level and testing on full load for satisfactory functioning complete all as specified and directed by Engineer-in-charge Make : Copeland/Danfoss/kirloskar/ suitable for LG/Carrier/Blue star/Voltas/Hitachi/As per site requirement |
| 8 | M&L for rewinding of condensor fan motor of all split/window type AC of cap 1.5/2.0 TR including replacement of gun metal bushes, testing for noise free operation and refixing at its existing location complete all as specified and as directed by Engineer-in-charge |
| 9 | S&F in replacement condenser unit for outdoor unit invertor/non invertor type split/window AC of capacity 1.5/2.0TR as per existing specification/make including brazing work, laying of extra copper tubing, leakage testing and testing on full load for satisfactory functioning complete all as specified and directed by Engineer-in-charge |
| 10 | S&F in replacement Oscilation motor with swing blade strip suitable for indoor unit of 1.5 TR/2 TR capacity all type Air conditioners of same specification/make as per existing one complete including taking out the old unserviceable one complete all asspicified and directed by Eng-in-charge. |
| 11 | S&F in replacementcomplete PCB with Remote control unit for invertor/non invertor type split/window AC of cap 1.5 TR/2.0 TR, microprocessor based with transmission and receiving unit, cord less with features of digital display, mode selection, timer, temperature control or as per exsting specification and model complete all as specified and directed Make : Suitable for Blue Star / LG / Carrier/ Voltas/Hitachi/Samsung ACs |
| 12 | Dismantling and taking out voltage stablizer transformer unit, capacity 1 KVA to 2 KVA, any type, any specification, repair/replacement electric circuit board, all cable connections, complete overhauling of the system including repairing/replacement of push on switch, transistor, capacitor, relay transistor, diode, condenser, zener, pre-set, IC, 12 volt transformer, 24 Volt transformer, voltmeter, PVC connector, indicator lamp, cutout, MCB, and any other parts as required for proper functioning of stabilizer complete alongwith testing, commissioning including transportationfrom site to workshop and back all as directed by the Engr-in-Charge |
| 13 | All as per Item No 12 above but capacity 3 KVA to 5 KVA. |
| 14 | S&F in replacement copper tubing flexible of dia 5/8\"including heavy duty nitrile rubber insulation complete all as specified and directed by Engineer-in-charge |
| 15 | All as per item 14 but of dia 3/8\" (inches) |
| 16 | All as per item 14 but of dia 1/2\" (inches) |
| 17 | All as per item 14 but of dia 1/4\" (inches) |
| 18 | M&L for insulation only to copper tubing of split type AC of cap 1.5 TR/2.0 TR with heavy duty rubber foam insulation as per existing density and thermal conductivity including packing material, reflactor tape and pvc tie complete all as specified and directed. |
| 19 | S&F in replacement of flexible type water drain out pipe suitable for indoor unit tray with extra PVC pipe for out side of split AC as per existing type/model complete all as specified and directed. |
| 20 | M&L Overhauling & servicing ofwater cooler any capacity by carrying out the following works at different location complete with the following tasks, all as specified and directed by Engineer-in-charge.(a) Inspection, taking down opening & dismantling descaling brushing cleaning of storage tanks (b) Examine water tightness of stotage tank after cleaning (c) Carry out operations of stop cock, push cock, float valve etc (d) Replace washer & glands of all taps to ensure water tightness (e) Inspect over flow and remove blockage obstruction if any (f) Inspection and treatment of leakage of refrigerant in the system. (g) Check thermostate, Relay capacitor,fan motor, compressor and test its functioning (h) Inspect drain pipe and remove blockage if any (j) Check & correct all electrical wiring and its functioning (k) Testing of water coolers after repairs for satisfactory functioning complete (l) Replacing minor spares (ie groomet rubber/rubber lining/washers/nuts&bolt) as required Note :- During servicing of unit, if anymajor spares / parts are required to be replaced it shall be measured and paid separately under respective items mentioned here- in - after as S&F including removing old un serviceable spare parts. |
| 21 | M&LOverhauling & servicing ofRefrigerator/Deep Freezer any capacity and make by carrying out the following works at different location of different establishment complete all as specified and directed by Engineer-in-charge (a) Inspection, taking down opening & dismantling, brushing washing cleaning of refrigerator (b) Check and correct earth continuity and all electrical wiring and its functioning complete(c) Check thermostate, Relay capacitor,fan motor, compressor and test its functioning (d) Rectification of minor defects(e) Inspection and treatment of leakage of refrigerant in the system.(k) Testing after any repairs for satisfactory functioning complete (l)Replacing minor spares (ie groomet rubber/rubber lining/washers/nuts&bolt) as required Note :- During servicing of unit, if any major spares / parts are required to be replaced it shall be measured and paid separately under respective items mentioned here- in - after as S&F including removing un serviceable spare parts. |
| 22 | M&L for disconnecting the unserviceable sealed compressor unit from the Water Cooler (capacity 20/40 Ltrs) of any make & modeland S&F new hermetically sealed compressor unit, of existing specification, including brazing work, laying of extra copper tubing, pressure testing, dehydration, gas charging upto required level, connecting itwithboth refrigerant line & electrical line for smoothoperation on single phase 230 Volts, 50HZ AC supply and testing on full load for satisfactory functioningall as specified and as directed. |
| 23 | All as per Item No 22 above but capacity 40/80Ltrs. |
| 24 | All as per Item No 22 above but capacity 60/120Ltrs. |
| 25 | M&L for disconnecting the unserviceable sealed compressor unit from the Refrigerator (capacity 165 to 260 Ltrs) of any make & model and removing the same and S&F new hermetically sealed compressor unit, of existing specification, including brazing work, laying of extra copper tubing, pressure testing, dehydration, gas charging upto required level, connecting itwithboth refrigerant line & electrical line for smoothoperation on single phase 230 Volts, 50HZ AC supply and testing on full load for satisfactory functioningall as specified and as directed. |
| 26 | All as per Item No 25 above but capacity 280 to 315 Ltrs. |
| 27 | All as per Item No 25 above but capacity 340 to 480Ltrs. |
| 28 | M&L for disconnecting the unserviceable sealed compressor unit from the Deep Freezer (capacity 300 to 400 Ltrs) of any make & model and removing the same and S&F new hermetically sealed compressor unit, of existing specification, including brazing work, laying of extra copper tubing, pressure testing, dehydration, gas charging upto required level, connecting itwithboth refrigerant line & electrical line for smoothoperation on single phase 230 Volts, 50HZ AC supply and testing on full load for satisfactory functioningall as specified and as directed. |
| 29 | All as per Item No 28above but capacity 405 to 500 Ltrs. |
| 30 | Supply and topping up/ full charging of Refrigerent Gas (R-22/R-410/R-134A/as per unit specification) for any type any specification of Air conditioners, Water coolers, Refrigerators & Deep freezers as per standard practice after pressure testing with filling of nitrogen gas, flushing out the system free from any oil / grease etc. cheking for leakages if any in the refrigerent system making good the leaking parts with necessary brazing/welding, ensuring leak proof system and testing for satifactory performance at different locations complete all as specified and as directed. (Note:- Cost of any type Refrigerent Gas included in the quoted rate) |
| 31 | Taking down Geyser 25/50 ltrs capacity of any make/type after disconnecting existing water supply and electric connections by unscrewing/cutting of holding nut & bolts incl opening of top & bottom cover, taking out complete internal assembly includinggeyser inner tank, inlet/outlet assembly, heating element, thermostat etc and descaling the geysers inner tank by chemical, cleaning and washing complete and re-assembling the same including connecting to electric and water supply system and including providing and grouting new nut bolts where required and testing of geyser for leakage and its proper functioning complete all as directed. (Note :- Defects developed during taking down geysers such as breaking of threads of pipe / geysers and GI fittings etc shall be rectified / replaced by the contractor at his own cost) |
| 32 | Fixing only geyser of 25/50 capacity, fixed on wall including supply & grouting of bolts in wall of suitable size with nuts & washers with necessary PCC work and making good the disturbed surfaces and matching with the existing surface complete all as specified and directed |
| 33 | Supply and replacing Heating element push/thread type or triangle/round base or any type with rubber gasket as per sample complete of capacity 2 KW, ISI marked suitable for 25/50 ltr cap of geyser of any make complete all as specified & directed |
| 34 | Supply and replacing inlet/outlet assembly/syfen, brass chromium plated with rubber gasket for Geyser with GI nuts & bolts suitable for housing heating element, thermostat etc. as per sample complete all as specified & directed |
| 35 | Supply and replacing geyser base assembly complete, stainless steel/brass chromium plated with rubber gasket, comprising heating element 2 KW, and suitable for housing 2 x thermostats, designed with 6/8 holes for fixing GI nuts & bolts, as per sample complete all as specified & directed. |
| 36 | Supply and replacing capillary type thermostat suitable for 25/50 ltr geyser capacity with controller and connecting copper wires as required, suitable to adjust water temperature 20 degree C to 80degree C, ISI marked complete all as specified & directed. |
| 37 | Supply and replacing multi functional safety valve, ISI marked, vertical type, made of brass suitable for 25/50 ltr geyser complete all as specified & directed |
| 38 | Supply and replacing Electronic capillary Thermal Switch, temperature adjustable type suitable for 25/50 ltr geyser complete all as specified & directed |
| 39 | Supply and replacing rigid PVC connection, heavy duty, 600mm long with CP brass adopter and washers at both ends suitable for hot water for 15mm dia pipe complete all as specified & directed |
| 40 | Supply & replacing glass wool in suitable for geyser complete all as specified & directed |
| 41 | Supply & replacing PUF insulation in geyser capacity 25/50ltr complete all as specified & directed |
| 42 | M&L for repair to defective/leaking geyser inner tank of any cap by gas welding / brass brazing etc at leaking spots and testing for leak proof repair all as specified & directed |
| 43 | M&L for scraping old paint from old geyser of 25/50 ltr capacity and applying two coats of white synthetic enamel paint as approved and writing MES No using black paint up to height 2.5 cm complete all as specified & directed |
| 44 | Supply and replacing Indicating lamp , SP, 220 volt suitable for 25/50 ltr cap geyser complete all as specified & directed |
| 45 | Supply and replacing 3 pin plug top 15 amp, ISI marked complete all as specified & directed |
| 46 | Supply and replacement of geyser inner tank made out of stainless steel sheet as per sample or suitable for 25 ltrs capacity geyser including all necessary as required and testing complete all as specified & directed |
| 47 | Supply and replacement of geyser inner tank made out of stainless steel sheet as per sample or suitable for 50 ltrs capacity geyser including all necessary as required and testing complete all as specified and directed |
| 48 | S&F in replacement of Thermostate switch / Overload protector suitrable for water cooler/ Refrigerator/Deepfreezer complete all as specified and directed. |
| 49 | S&F in replacement of Starting relay kit suitrable for water cooler/ Refrigerator/Deepfreezer complete all as specified and directed. |
| 50 | S&F in replacement of Connector open type 30 Amps, 3/4 way for AC outdoor unit complete all as specified and directed. |
| 51 | S&F in replacement of Starting capacitor 80 -100 mfd heavy duty 230v, AC supply complete all as specified and directed. Make-Epcos / Sarada / Usha / Tibcon |
| 52 | S&F in replacement of Starting capacitor 120 -150 mfd heavy duty 230v, AC supplycomplete all as specified and directed.Make-Epcos / Sarada / Usha / Tibcon |
| 53 | S&F in replacement of Running capacitor 2.5 to 6 mfd heavy duty 230v, AC supply complete all as specified and directed. Make-Epcos / Sarada / Usha / Tibcon |
| 54 | S&F in replacement of Running capacitor 30/36 mfd heavy duty 230v, AC supply complete all as specified and directed. Make-Epcos / Sarada / Usha / Tibcon |
| 55 | S&F in replacement of Running capacitor 45 mfd heavy duty 230v, AC supply complete all as specified and directed.Make-Epcos / Sarada / Usha / Tibcon |
| 56 | S&F in replacement of Running capacitor 52 + 4 mfd heavy duty 230v, AC supply complete all as specified and directed.Make-Epcos / Sarada / Usha / Tibcon |
| 57 | S&F in replacement of Running capacitor 55 mfd heavy duty 230v, AC supply complete all as specified and directed.Make-Epcos / Sarada / Usha / Tibcon |
| 58 | S&F in replacement of Condensor motor of 1/16 or 1/32 or 1/40 HP including blade complete with clamps & boltsfor suitrable for water cooler/ Refrigerator/Deepfreezer as per existing same complete all as specified and directed. |
| 59 | S&F in replacement of Hose pipe size 20mm dia heavy duty with connectors ISI markedfor water cooler complete all as specified and directed. |
| 60 | S&F in replacement of PVC float valve (mini) 15mm dia with assembly for water cooler complete all as specified and directed. |
| 61 | S&F in replacement of 15 mm bore push cock brass body chromium plated for water cooler complete all as specified and directed. |
| 62 | S&F in replacement of Shelf tray set complete including vegitable drawer with glass lid suitable for any type/capacity of Refrigerator complete all as specified and directed. |
| 63 | S&F in replacement of Door lock with key suitable for any type/capacity of Refrigerator/deep freezer/water cooler complete all as specified and directed. |
| 64 | S&F in replacement of Door rubber gasket with magnetic strip for any type/capacity of Refrigerator |
| 65 | S&F in replacement of Electronic timer unit as per existing make & capacityfor refrigerator/Deep freezor |
| 66 | S&F in replacement of Bulb with holder as per existingfor refrigerator/Deep freezor complete all as specified and directed. |
| 67 | S&F in replacement of Filter strainer/drier as per existing same for refrigerator/Deep freezor/watercoolers/window AC complete all as specified and directed. |
| 68 | S&F in replacement of Capillary tube as per existing length for refrigerator/Deep freezor/watercoolers/window AC complete all as specified and directed. |
| 69 | S&F in replacement of Evaporator cooling coil as per existing set for refrigerator/Deep freezor/watercoolers complete all as specified and directed. |
| 70 | S&F in replacement of Heater unit and providing electrical connection as per existing make & model completefor refrigerator/Deep freezor complete all as specified and directed. |
| 71 | S&F in replacement of Brass flair nuts 1/2 to1/4\" (Inches) complete all as specified and directed. |
| 72 | S&F in replacement of Brass flair nuts 3/8 to 5/8\"(Inches) complete all as specified and directed. |
| 73 | S&F in replacement of PVC insulated 3 core round flexible copper cable 1100 v grade of size 2.5 sq mm complete all as specified and directed.Make:- Plaza/Polycab/Havells/Finolex |
| 74 | S&F in replacement of PVC insulated 4 coreround flexible copper cable 1100 v grade of size 2.5 sq mm complete all as specified and directed.Make:- Plaza/Polycab/Havells/Finolex |
| 75 | S&F in replacement of Hand set remote for Split typeAC of cap 1.5 TR/2.0 TR, with features of digital display,all controls including battery all as per exsting specification and model Blue Star / LG / Carrier/ Voltas/Hitachi/Samsung(As per site requirement) |
| 76 | S&F in replacement of PCB with control unit complete for Refrigerator of any capacity, including features of digital display as per exsting specification and model.complete all as specified and directed. |
| 77 | S&F in replacement of cooling chamber/freezer with cover complete for Refrigerator of any capacity complete all as specified and directed.Note.for item sl Nos 48 to 77: Replacement the above spare parts for Air conditioners, Water coolers,Refrigerators and Deep freezers ofmake as shown above otherwise the make and model as per existing model and make as approved by GE shall be provided.General note for all Items of BOQ: (i) Tenderer will provide well experienced 1 No AC/Ref Mech/Elect with Helper for attending complaint/above works on emergengy basis (within 2-4 Hrs) rectifying the defects and making machine satisfactory functional, in addition to man power required for execution of other routine works.(ii) All complaints should be attended with in 12 hours of reporting of complaints. Panelty charges for non attending complaints/above works with in 12 hrs shall be double the quoted rate as per connected item of the above works.(iii) All Tools & Plants required for repair work shall be provided/arranged by the contractor at his ownarrangement to trade men & helpers.(iv) The unit rate quoted shall be deemed to be included in the above. |