Haryana Sugar Federation-HSF has published Tender For Lagging Work In The Various House. Submission Date for this Tender is 24-07-2023. Insulation work Tenders in rohtak Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Lagging work (Insulation) at various equipment/ accessories at Boiler outlet duct and hopper, steam drum and water drum areas, water wall panels, main steam pipeline, PRDS pipelines etc. (Appx. Area- 15000 sq.ft) LRB mattress-100 mm, density of LRB material- 120kg/m3, Cladding with aluminum sheet of 22 gauges(0.644mm) |
2 | Lagging work ( Insulation) at various equipment/ accessories at Boiler section (ESP hoppers, inlet and outlet nozzles, APH, ID and other ducting of boiler section etc.) (Appx. Area- 15000 sq.ft) LRB mattress – 75 & 50mm, density of LRB material- 100kg/m3, Cladding with aluminum sheet of 24 gauges (0.51mm) |
3 | Lagging work ( Insulation) at various equipment/ accessories at boiling house LRB mattress- 75 & 50mm, density of LRB material- 100kg/m3 , Cladding with aluminum sheet of 24 gauges(0.51mm) |
4 | Lagging work ( Insulation) at various equipment/ accessories at turbine section LRB mattress- 75 & 50mm, density of LRB material- 100kg/m3 , Cladding with aluminum sheet of 24 gauges(0.51mm) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail