Institute Of Medical Sciences-IOMS has published Tender For Providing And Laying Precast Concrete Tiles Pavement Including Line Drains For The Approach Road Of U.G. Ladies Hostel (Sanarei House) At Rims, Imphal.. Submission Date for this Tender is 31-07-2023. Road Work Tenders in Imphal West Manipur. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil ad directed, within a lead of 50m. |
2 | All kinds of soil |
3 | Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre. |
4 | Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering |
5 | i) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
6 | ii) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
7 | Brick work with 1st class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: Cement mortar 1:4 (1cement : 4 coarse sand) |
8 | Half brick masonry with 1st class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: Cement mortar 1:4 (1cement : 4 coarse sand) |
9 | ExcavationinSoilbyManualMeans.(Excavationfor roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 meters.) |
10 | Preparation andSurfaceTreatmentofformation. (Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.) |
11 | Construction of granular sub-base by crusher run, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complate as per clause 401. |
12 | Construction of footpath/separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick cement concrete grade M15, over laid with pre-cast concrete tiles in cement mortar 1:3 including provision of all drainage arrangements but excluding kerb channel. |
13 | 12 mm cement plaster with a floating coat of neat cement of mix: 1:3 (1cement : 3 fine sand) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail