| 1 | CIvil Works |
| 2 | CIVIL WORKS :All Civil works to (inclusive of its cleaning up to bottom of drain) of industrial waste water conveyance system consisting of followings:(a) Tannery waste water collecting drains connected to 4 pumping stations Approximate length 13.31 km. Cleaning & repairing of conveyance drain, casting of RCC cover with M-30 concrete, only anti sulfide cement should be used, it is also insure to outlet of tannery industry should be connected with existing conveyance channel.(b) Cleaning of screen and Grit channels at all 4 pumping stations – 2 nos in every pumping station. To take care of proper operation and maintenance of following works.(c) Intermediate pumping Stations – 4 nos. Cleaning of screen and grit chambers in all respect including disposal of screened materials (d) Sump wells at pumping station – 4 nos including as above cleaning of sump etc (civil works only).(e) Rising main from pumping station Approx. length 10.70 km.(f) Operation of all valves and gates which are not installed in pumping station premises.(g) All admin building and other civil structure in the primises to maintain in proper as per specification given in tender document. |
| 3 | All civil work (inclusive of its cleaning) of 36 mld UASB treatment plant consisting of followings :(a) Collecting chamber of tannery waste water stream, manual screens – 2 nos and grit channels – 2 nos. Maintaining proper flow as per design capacity.(b) Equalization tanks – 2 nos Cleaning of tank properly and maintaining proper level as required.(c) Intermediate pumping station with sump and rising main – 1 no including all works as mentioned above.(d) Collection chamber, manual screens – 2 nos and grit channels – 2 nos for domestic waste water stream.(e) Mixing tank – 1 no(f) Main pumping station with sump and rising main – 1 no(g) UASB reactors – 2 nos with 56 feeding pipes of 100 mm dia meter gas collectors and effluent pipes complete.(h) Sludge collecting chamber with sludge withdrawal pipe.(i) Effluent collecting well – 1 no(j) Operation of all valves and gates installed in pipe line of UASB |
| 4 | All civil work First stage post treatment plant consisting of followings:(a) Clarifloculator and sludge collecting chambers – 2 nos.(b) Sludge thickener with sludge withdrawal pipe – 1 no(c) 1 no. Belt Filter Press(d) Operation of all valves and gates in pipe line of Post Treatment Plant. |
| 5 | All civil work of 25 mld pumping station (i) Cleaning of pumping station in all respect.(ii) Operation of all valves and gates (installed) in pipe line out of the pumping station (25 mld) |
| 6 | Disposal of sludge up to 2.00 kms. from sludge drying beds including change of filter media as per specification given in tender document and belt filter press (BFP) upto the land provided by Kanpur Nagar Nigamunder 36 mld UASB treatment plant (61 nos bed, 1 no. BFP) |
| 7 | Tannery Conveyance System( Chhabilepurwa TWW Pumping Station(PS1),Sheetlabazar TWW Pumping Station(PS2), Wazidpur TWW Pumping Station(PS3) & Budhiyaghat TWW Pumping Station(PS4)) :Running & Operation of following equipmentsa)All Pumping Plants, Control Panels, Mini TW, Changeovers, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV/I.P. Cameras of Chhabilepurwa TWW Pumping station(PS1), online connectivity of CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. b) All Pumping Plants, Control Panels, Mini TW, Changeovers, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV/I.P. Cameras of Sheetlabazar TWW Pumping station(PS2), online connectivity of CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. . c) All Pumping Plants, Control Panels, Mini TW, Changeovers, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV/I.P. Cameras of Wazidpur TWW Pumping station(PS3), online connectivity of CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc.d) All Pumping Plants, Control Panels, Mini TW, Changeovers, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV/I.P. Cameras of Budhiyaghat TWW Pumping station(PS4), online connectivity of CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. |
| 8 | Maintenance/Repairing/Servicing of following equipmentsa) Pumping Plants, Control Panels, Mini TW, Changeovers, DG set, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV Cameras of Chhabilepurwa TWW Pumping station(PS1), online connectivity of CCTV Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. b) Pumping Plants, Control Panels, Mini TW, Changeovers, DG set, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV Cameras of Sheetlabazar TWW Pumping station(PS2), online connectivity of CCTV Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. . c) Pumping Plants, Control Panels, Mini TW, Changeovers, DG set, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV Cameras of Wazidpur TWW Pumping station(PS3), online connectivity of CCTV Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc.d) Pumping Plants, Control Panels, Mini TW, Changeovers, DG set, Chain Pulley Block, Lighting, Exhaust Fan, Ceiling Fan, CCTV Cameras of Budhiyaghat TWW Pumping station(PS4), online connectivity of CCTV Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. |
| 9 | Running & Operation of 125 kVA D.G. Set including cost of HSD/Lubricants, assuming average power failure of 1.5 hours per day at PS-1 |
| 10 | Running & Operation of 180 kVA D.G. Set including cost of HSD/Lubricants, assuming average power cut of 2.5 hours per day at PS-2 |
| 11 | Running & Operation of 180 kVA D.G. Set including cost of HSD/Lubricants, assuming average power cut of 1.5 hours per day at PS-3 |
| 12 | Running & Operation of 82.5 kVA D.G. Set including cost of HSD/Lubricants, assuming average power failure of 1.10 hours per day at PS-4 |
| 13 | (B) 25 MLD Domestic Pumping Station JajmauRunning & Operation of all Pumping Plants, Control Panels, Changeover switch, Chain Pulley Block, Lighting, Exhaust Fans, Ceiling Fans, Cables, Mini TW, CCTV/I.P. Cameras, online connectivity of CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charge and related accessories etc. complete in all respect. |
| 14 | Maintenance/Repairing/Servicing of Pumping Plants, Control Panels, Changeover, D.G. Set, Mini TW, Chain Pulley Block, Lighting, Exhaust, Ceiling fan, Cables, Existing CCTV/I.P. Cameras and related accessories etc. |
| 15 | Running & Operation of 250 kVA D.G. Set including cost of HSD/Lubricants, assuming average power failure of 0.30 hours per day at 25 MLD SPS JAJMAU |
| 16 | (C) 36 MLD CETP, Jajmau(C1) C.E.T.P. & PTPRunning & Operation of following equipments :a) Treatment Unit - Mechanical Tannery waste water screen, Pumping Plants of Intermediates Pumping Stations (I.P.S.), Mechanical Domestic waste water screen, Pumping Plants of Main Pumping Station (M.P.S.), Tube well, Tannery Inlet Flow Meters (02 Nos), Domestic Inlet Flow Meter (01 No) and C.E.T.P. Outlet Flow Meters (02 Nos) etc.b) Post Treatment Unit - Blowers & its related accessories, Cooling Tower, Air Diffusers, Clarifllocculators, Thickener Mechanism, Excess Sludge Pumping Plants, Centrate Pumping Plants, Filtrate Pumping Plants, related all Control Panels,c) 11/0.4 kV Substation- 11/0.4 kV Substation H.T. Panels, Transformers, L.T. Panelsd) Belt Filter Press- Belt Filter Press & its associated machineries like Screw pumps, wash water pumps, Sludge Agitator/mixer, Dosing system, their Control Panels, mini Tube Well including all its consumable like lubricants hydraulic oil, Polyelectrolyte chemical, Grease, CCTV/I.P. Cameras, Online connectivity of all CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charges and related accessories complete in all respect. |
| 17 | Maintenance/Repairing/Servicing of following equipments a) Treatment Unit - Mechanical Tannery waste water screen, Pumping Plants of Intermediates Pumping Stations (I.P.S.), Mechanical Domestic waste water screen, Pumping Plants of Main Pumping Station (M.P.S.), Tube well, Tannery Inlet Flow Meters (02 Nos), Domestic Inlet Flow Meter (01 No) and C.E.T.P. Outlet Flow Meters (02 Nos) etc.b) Post Treatment Unit - Blowers & its related accessories, Cooling Tower, Air Diffusers, Clarifllocculators, Thickener Mechanism, Excess Sludge Pumping Plants, Centrate Pumping Plants, Filtrate Pumping Plants, related all Control Panels,c) 11/0.4 kV Substation- 11/0.4 kV Substation H.T. Panels, Transformers, L.T. Panelsd) Belt Filter Press- Belt Filter Press & its associated machineries like Screw pumps, wash water pumps, Sludge Agitator/mixer, Dosing system, their Control Panels, mini Tube Well including all its consumable like lubricants hydraulic oil, Polyelectrolyte chemical, Grease, CCTV/I.P. Cameras, Online connectivity of all CCTV/I.P. Cameras to SPCB/CPCB, Internet Services Charges and related accessories complete in all respect. |
| 18 | Running & Operation of 380 kVA D.G. Set including cost of HSD/Lubricants, assuming average power cut of 0.25 hours per day at CETP JAJMAU |