Ttps – Mech.Ii – Tm I - Unit-I – Overhauling Of Turbine Lub Oil System, Seal Oil System, Valves And Equipments During The Forthcoming Overhaul, Tuticorin-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Ttps – Mech.Ii – Tm I - Unit-I – Overhauling Of Turbine Lub Oil System, Seal Oil System, Valves And Equipments During The Forthcoming Overhaul. Submission Date for this Tender is 31-07-2023. Air Compressor Tenders in Tuticorin Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

38655654
Ttps – Mech.Ii – Tm I - Unit-I – Overhauling Of Turbine Lub Oil System, Seal Oil System, Valves And Equipments During The Forthcoming Overhaul
Open Tender
Indian
Tamil Nadu
Tuticorin
31-07-2023

Tender Details

Ttps – Mech.Ii – Tm I - Unit-I – Overhauling Of Turbine Lub Oil System, Seal Oil System, Valves And Equipments During The Forthcoming Overhaul

Key Value

Document Fees
Refer document
EMD
INR 6400.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: TTPS – Mech.II – TM I - Unit-I – Overhauling of Turbine Lub oil system, seal oil system, Valves and equipments during the forthcoming overhaul
Sl. No. Item Description
1Overhauling OF SEAL OIL COOLER : Draining of oil from SOC, shifting oil barrels, after attending hydraulic testing of tube nest top up oil to MOT through centrifuge etc.
2Dismantling of top water box, brush cleaning of all tubes, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts and charging of oil & water side etc.
3OVERHAULING OF LUB OIL COOLERDismantling of existing Turbine Lub oil cooler top water box ,Draining of oil from LOC ,cleaning of tube nest and shiftingoil barrels after overhaulingof tube nest and tup up oil to MOT through centrifuge.
4Inspection of LOC/SOC Bottom water box:Inspection of LOC/SOC Bottom water box & rectification work including cost of welding rods,epoxy paints etc.
5Inspectionand cleaning of MOT: Draining the oil to clean oil tank through centrifuge,Removal of MOT strainers, Cleaning the tank after removing the slag,Drawal of new oil and devolution of empty barrel,Topping up of oil from clean oil tank through centrifuge.
6Overhauling of clean oil tank: complete cleaning of slag and painting of internals.
7Overhauling of NRV Overhaulingof PNRV 100/250 ATA , GLV100 / 40 , 16ATA, GLV 4” / 600, 300class HO / MO , SCNRV 150/ 40, 16 ATA,SRV 2.5 ” X4 ” / 300 Class ,GV 350/125class &GV 300/125 class, GV150/64 ATA HO, SCNRV 350/125 class : Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing andapply lubrication.
8Overhauling ofGV 150/64, 40, 16 ATA HO, GV 6 "/ 600, 300, 150 class HO, GLV150 /40 ATA ,GLV 6 ” / 300 class HO/MO, SCNRV 200/40, 16 ATA. Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing andapply lubrication.
9Overhauling of GV 150/64, 40, 16 ATA HO, GV 6 "/ 600, 300, 150 class HO, GLV150 /40 ATA ,GLV 6 ” / 300 class HO/MO, SCNRV 200/40, 16 ATA. Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing andapply lubrication.
10Overhauling of GV 10"/1500 Class HO and PNRV 250/250 ATA, SCNRV 300/150 Class. GV/GVL 10 "/150 class,12 "/150,300 class. Dismantling the valve, cleaning all the parts, Checking the seating surface. Lapping the gate/seat & flap/disc for perfect blue matching. Reassembling the valves with new self sealing ring and bonnet gaskets and gland packing rings.
11Overhauling of GV 20"(400/500mm) 150 class H.O : Dismantlingthe valve, cleaning all the parts, checking the bearings and seating surfaces. Lapping the gate / seatfor perfect blue matching. Re-assembling the valve with new bonnet gasket and packings.
12Replacement of 400/500 mm Gate valve by Butterfly valve in lub oil cooler HDPE cooling water lines: This activities invloves dismantling of old valves from HDPE lines, position, aligning new valves with HDPE lines andtightening with flangesincluding rectification if any in the HDPE pipe ends.
13Overhauling of vapour extraction fan :Dismantling of VEF complete assembly, Inspection and renewal of wornout spares and assembling and commissioning... .
14Repair of FRP lining : Repair of FRP lining per sq.meter in thelub/seal oil coolers bottom water boxes including cost of FRP materials .
15Inspection of couplingBearing and mechanical seal in AC lub Oil/ DC/ AC/DC seal oil pumpspump: Dismantling of bearing and mechanical seal assembly and renewal if required and assembling.
16Cleaning and painting works including cost of paintings: Cleaning and painting ofMOT/LO/SO cooler strainer and related valves, pipelines in turbine oil system .
17Repairing of gear pump in Turbine lub Oil centrifuge system: complete dismantling and renewal of wornout spares and assembling.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail