Tender For Tn04-02-04 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P04 - Construction Of Community Soak Pits H/O Madhemangalam - No Of Works - 10 - P04
Tender Value
1.45 Lakhs
Estimated cost
Bid Submission
25 Jul 2023
0 days left
EMD
1450
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nallampalli → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tn04-02-04 / Aip - 2023-24 - Sbm(G) - Csp - Nallampalli Block P04 - Construction Of Community Soak Pits H/O Madhemangalam - No Of Works - 10 - P04 Construction Of Community Soak Pits H/O Madhemangalam - No Of Works - 10
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Community Soak Pits H/oMadhemangalam Panchayat -CSP - 1. |
| 2 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 3 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 4 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 5 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 6 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 7 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 8 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 9 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 10 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 11 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 12 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 13 | Towards Name board charges |
| 14 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 2. |
| 15 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 16 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 17 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 18 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 19 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 20 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 21 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 22 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 23 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 24 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 25 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 26 | Towards Name board charges |
| 27 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 3. |
| 28 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 29 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 30 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 31 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 32 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 33 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 34 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 35 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 36 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 37 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 38 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 39 | Towards Name board charges |
| 40 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 4. |
| 41 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 42 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 43 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 44 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 45 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 46 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 47 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 48 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 49 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 50 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 51 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 52 | Towards Name board charges |
| 53 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 5. |
| 54 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 55 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 56 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 57 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 58 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 59 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 60 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 61 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 62 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 63 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 64 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 65 | Towards Name board charges |
| 66 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 6. |
| 67 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 68 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 69 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 70 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 71 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 72 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 73 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 74 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 75 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 76 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 77 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 78 | Towards Name board charges |
| 79 | Construction of Community Soak Pits H/oMadhemangalam Panchayat- CSP - 7. |
| 80 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 81 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 82 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 83 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 84 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 85 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 86 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 87 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 88 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 89 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 90 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 91 | Towards Name board charges |
| 92 | Construction of Community Soak Pits H/oMadhemangalam Panchayat- CSP - 8. |
| 93 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 94 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 95 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 96 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 97 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 98 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 99 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 100 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 101 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 102 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 103 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 104 | Towards Name board charges |
| 105 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 9. |
| 106 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 107 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 108 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 109 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 110 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 111 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 112 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 113 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 114 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 115 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 116 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 117 | Towards Name board charges |
| 118 | Construction of Community Soak Pits H/oMadhemangalam Panchayat - CSP - 10. |
| 119 | Earth work exacavation and depositing on bank wiith initial Lead and lift in all Clauses of Soil as per SS20B CompleteSoak PitChanberPlatform |
| 120 | Filling with 225mm size Boulders including cost and conveyance ofmaterials to site etc.Soak Pit |
| 121 | Filling with 40mm size Metal including cost and conveyance of materials to site etc.Soak Pit |
| 122 | Filling with 20mm size Metal including cost and conveyance of materials to site etc.Soak PitD/f Rcc Rings |
| 123 | Supply and delivery of 60Cm dia 45cm depth RCC rings - 2Nos |
| 124 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and labour charges etc.. CompletePlatformkerb all alroundChamber |
| 125 | Solid block in CM 1:5mix using solid blocks including cost and conveyance of materials to site and labour charges etc.Soakpit alroundTub wall AlroundChamber alround |
| 126 | Plastering with Cement mortar 1:5 mix, 12mm thick including cost of materials to site and labour charges etc.PlatformWall alround soakpitPlatform alroundChamber |
| 127 | Supply and delivery of 60Cm dia Cover Slab 2 Nos One for Top & One for Bottom |
| 128 | Provision for Leading Channel (or) Connecting with PVC Pipe |
| 129 | Colour washing for alround wallWall alround soakpitPlatform alroundChamber |
| 130 | Towards Name board charges |
| 131 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Jul 15, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 25, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 25, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender