Haridwar Development Authority has published Tender For Lawn Tennis Court At Sports Complex Near H.R.D.A. Stadium In Haridwar. Submission Date for this Tender is 02-08-2023. Sports Complex Tenders in haridwar Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Note : - The Contractor shall quote his/their rates without GST, GST will be paid extra by the Department as per prevelling rates at the time of payment. |
2 | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area . |
3 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
4 | Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm internal diameter of metal asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe, cross section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site ) |
5 | Water Bound Macadam Sub-base/base WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means |
6 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
7 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batchtype hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (bituminous binder @ 5.4 % of mix) |
8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
9 | Brick masonry work in cement mortar in foundation complete excluding pointing andplastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:3 cement mortar |
10 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications |
11 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
12 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
13 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 |
14 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications |
15 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) |
16 | Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade) |
17 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
18 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
19 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 |
20 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications |
21 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) |
22 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction ofEngineer-in-charge. |
23 | Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade) |
24 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
25 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15 |
26 | Brick masonry work in cement mortar in foundation complete excluding pointing andplastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:3 cement mortar |
27 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 |
28 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications |
29 | 500 CUSHION SPORTS FLOORING (9 - Layer System) for Lawn Tennis Court Supply and Application of sports Flooring with hybrid waterborne PU top coat finish on Asphult sub base which is durable, required minimal maintenance, All-weather suitable/friendly, eco-friendly, Protective Against UV rays consists of the following layers-Acrylic Resurfacer for filling and smoothing subfloor (2 layer)-Triple Layer of Acrylic Rubber cushion (3- Layers) -Anti Skid Base Coat (1- layer) (base color Coat)- Acrylic Top Coat (1 Layer) -Hybrid waterborne HPU-500 Top coat to protect flooring against UV Rays followed by Game Line marking (2- layers) |
30 | Providing and fixing of 22 ft hight4 MS pole placed on 2 pole each side : 12 metal halidefixtures (200W Philips make) on 04 poles( 3 nos on each pole), one double door weather proof distribution board with MS sheet, with four poleMCBs, earthing electrode, full wiring from distribution board to poles and to the fixtures. |
31 | Provinding and fixing of SS-304refereechair |
32 | Provinding and fixing of SS-304 setting Bench three Seater |
33 | Provinding and fixing of Tennis net with Pole with fixing in ground 1:1.5:3 (1 cement :1.5 fine aggregate: 3 courese aggregate) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail