Orissa Industrial Infrastructure Development Corporation-IDCO has published Tender For Construction Of 11Kv Ug Cable And Rmu For Bifurcation Of 11Kv Industry And New Industry Feeder At Chandaka Ie Under Electrical Section Chandrasekharpur 2, Khurdha (Under Mse-Cdp Scheme). Submission Date for this Tender is 17-08-2023. Cable Laying Tenders in chandaka Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-Aug-2023 | 1st Corrigendum | Other | 17-08-2023 |
Sl. No. | Item Description |
1 | Part A - Cost ofSupply of 11 KV UG cable of length-1 KM using 11KV, 3CX400mm2 UG XLPE cable without spare. (960 Mtr. In Open Trench method & 40 Mtr. In HDD due to road crossing) from proposed RMU inside Infocity PSS to Near LV Prasad Eye Hospital to bifurcate 11 kv industry feeder (CS pur-2 pss).(refer SLD-A.B) and Installation of 1no. of 11KV 4WAY RMU as per technical specifications and direction of EIC. |
2 | Supply of materials for 11kV, 3Core, 400sqmm, XLPE Insulation armoured UG cable with accessories. |
3 | Length of 11kV 3C, 400sqmm cable (open trench) |
4 | Length of 11kV 3C, 400sqmm cable (HDD) |
5 | Supply of 11kV, 3Core 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA-37.7kA and SC rating of Armour in kA-15kA) as per technical specifications and direction of EIC. |
6 | Supply of Straight though jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable for 3Core (set) as per technical specifications and direction of EIC. |
7 | Supply of Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG cable for 3Core (Set) as per technical specifications and direction of EIC. |
8 | Supply of Outdoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG cable for 3Core (Set) as per technical specifications and direction of EIC. |
9 | Supply of HDPE PE 80-PN8 pipe of 160mm diameter (for 400sqmm HT cable laying) as required and as per the direction of EIC. |
10 | Supply of 11kV RMU |
11 | No. of 11kV 4Way RMU (LLVV) |
12 | Supply of 11kV RMU 4 way, 2 Iso & 2 Brk 630A (LLVV) as per technical specifications and direction of EIC. |
13 | Supply of Earthing |
14 | Supply of Earthing Conductor 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc)as per technical specifications and direction of EIC. |
15 | Pipe Earthing 40mm. GI Pipe |
16 | Part A -Cost of Erection |
17 | Laying, Commissioning, Testing of 11kV, 3core, 40sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method |
18 | Laying, Commissioning, Testing of 11kV, 3core, 40sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method as per the direction of EIC. |
19 | Erection of Straight though jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kitsfor 3Core (set) as per the direction of EIC. |
20 | Erection of Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kitsfor 3Core (Set) as per the direction of EIC. |
21 | Erection of Outdoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kitsfor 3Core (Set) as per the direction of EIC. |
22 | Supply, Installation, Laying, Commissioning, Tesing of 11kV, 3core, 1Run, 400sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable in HDD method with HDPE pipe (160mm dia, PN8 PE80) for laying of individual run of UG cable at main road and unaccessable place as per the direction of EIC. |
23 | Laying of 160mm dia PE 80-PN8, HDPE Pipe inside open trench. |
24 | Erection, Commissioning, Wiring and Testing of 11kV RMU |
25 | Erection of 11kV RMU 4 Way, 2 Iso & 2 Brk 630A (LLVV) as per technical specifications and direction of EIC. |
26 | Part A -Cost of Civil works |
27 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
28 | Earth work excavation of soil (1mtr, width X 1 mtr. Depth)as per the direction of EIC. |
29 | Earth work excavation of soil as required and as per the direction of EIC. |
30 | Earth work excavation of hard rock as required and as per the direction of EIC. |
31 | Back filling with excavated soil outside and above the trench as required and as per the direction of EIC. |
32 | Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench (1mtr. Width) as required and as per the direction of EIC. |
33 | Civil works for Prefabricated RCC foundation eith supply of all materials |
34 | Prefabricated RCC foundation of 11kV RMU as required and as per the direction of EIC. |
35 | Supply of GI fencing with Gate around each RMU as required and as per the direction of EIC. |
36 | Construction Earthing chamber including installation of earthing pipe Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe as required and as per the direction of EIC. |
37 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr) as required and as per the direction of EIC. |
38 | Supply and Erection of cable Route Marker along the cable route at an interval of 30mtrs with civil works as required and as per the direction of EIC. |
39 | Part B- Cost of Supply of 1no. of Line DP with AB switch in existing Industry Feeder near to non veg world Line and Installation of 6Nos, of Lightning Arrestor in Existing DP with AB switch (3 nos. ot OTV LAB in 11kV as per technical specifications and direction of EIC. |
40 | Supply of WPB 160X152 (11 Mtr Long, 30.44KG/Mtr.) as per technical specifications and direction of EIC. |
41 | SITC of Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 3 mtr., 2 nos channel required = (2x9.56x3) as per technical specifications and direction of EIC. |
42 | SITC of Fish plate 50x6 mm, 2.36 kg/Mtr. Each 0.280 mtr. Length, 6 no"s required=(6x2.38x0.280) as per technical specifications and direction of EIC. |
43 | SITC of AB switch Mounting Channel 75x40x4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no"s channel required=(7.14x3x2) as per technical specifications and direction of EIC. |
44 | SITC of AB switch side Support Channel 100x50x6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no"s channel required=(9.56x2x0.35) as per technical specifications and direction of EIC. |
45 | SITC of Channel Support for down Pipe 75X40X4.8mm, 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no"s channel required=(7.14x0.8x1) as per technical specifications and direction of EIC. |
46 | SITC of Double pole Belting channel 75X40X4.8mm.,7.14KG/Mtr., each channel length 3.0 Mtr.,4 no"s channel required=(7.14x3x4) as per technical specifications and direction of EIC. |
47 | SITC of 50x50x6mm GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr. 4 nos anle required=(4.5x3.512x4) as per technical specifications and direction of EIC. |
48 | SITC of Danger Plate. 2 no"s as per the direction of EIC. |
49 | SITC of Back clamp for danger Plate 25X3mm. Flat,0.59Kg/Mtr. Flat of 0.510mtr length 2 no"s=(2x0.59x0.510) as per technical specifications and direction of EIC. |
50 | Supply of HT Stay clamp, 50x8 mm flat, 3.14Kg/Mtr.,0.551Mtr. Length, 2 no"s qty required (1 pair) as per technical specifications and direction of EIC. |
51 | Supply of HT Stay set (Complete) as per technical specifications and direction of EIC. |
52 | Supply of HT Stay Insulator Type-C as per technical specifications and direction of EIC. |
53 | Supply of 7/10 SWG Stay Wire 15kg/stay as per technical specifications and direction of EIC. |
54 | Supply of GI Pipe Earthing 40mm 3 Mtr. Long as per technical specifications and direction of EIC. |
55 | Supply of 50x6mm GI Flat for earthing 2.36kg/mtr., ((12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr For mesh formation and 2.5 mtr. For raising)=20.5x2.36 as per technical specifications and direction of EIC. |
56 | SITC of GIbarbed wire anticlimbing device 3 Kg per support, 2 no"s qty required=(2x3Kg) as required and as per the direction of EIC. |
57 | SITC of Back Clamp for anticlimbing device 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no"s=(8x0.59x0.510) as required and as per the direction of EIC. |
58 | SITC of Lightning Arrester (12KV, 10KA) (Station Class, class-2) as per technical specifications and direction of EIC. |
59 | SITC of AB Switch (11KV 400A 3pole, 50 Hz) as per technical specifications and direction of EIC. |
60 | SITC of 11KV pin insulator polymor as per technical specifications and direction of EIC. |
61 | SITC of H W fitting (B&S) 70KN 3Bolt as per technical specifications and direction of EIC. |
62 | SITC of Disc insulator (B&S) 70 KN polymer as per technical specifications and direction of EIC. |
63 | SITC of PG Clamp for 148 sqmm AAA conductor as per technical specifications and direction of EIC. |
64 | SITC of GI Nut, Bolt & washer of different sixes (13.718 Kg each DP with AB Switch) as per technical specifications and direction of EIC. |
65 | Supply and painting of Black Paint as required and as per the direction of EIC. |
66 | Supply and painting of Yellow Colour Paint for Background as required and as per the direction of EIC. |
67 | SITC of 148 sqmm AAA conductor for Jumpering as per technical specifications and direction of EIC. |
68 | Part B- Cost Of Civil Works |
69 | Fixing of complete 11KV line Complete stay setincludes 1)Turn Buckle Assembly. 2) Stay Rod & Stay plate.3) Stay Insulator.4) Stay Wire.5)Stay clamps with Nuts & Bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size(500mmx500mmx600mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & standardas as required and as per the direction of EIC. |
70 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)=0.45Cu.mtr as required and as per the direction of EIC. |
71 | Couping ratio 1:1.5:3 with dimension (500X500X450)=0.1125 Cu mtr as required and as per the direction of EIC. |
72 | Construction Earthing chamber including installation of earthing pipe Making earthing chamber including excavation, soil treatment with bentonide powder. Calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe as required and as per the direction of EIC. |
73 | Part C- Cost ofSupply of Augmentation of existing 11KV line of length 0.6CKM of 11Kv industry feeder from existing 80mm2 conductor to 148mm2 conductor with 5nos of interposing pole(11 KV line between polymer complex back feeding point near LV prasad Eye hospital to T-off near CIPET college. (Refer SLD-C-D) and Dismentaling of existing 80mm2 conductor as per technical specifications and direction of EIC. |
74 | Supply of WPB(GI)160x152 (11Mtr Long, 30 44KG/Mtr ) Including excavation of pole pit in all kind of soil. Complete in all respect as per the specification and direction of EIC. |
75 | SITC of 11kV V Cross Arm (10.2Kg each). Complete in all respect as per the specification and direction of EIC. |
76 | SITC of Top bracket 100x50x6mm GI channel (2Kg each). Complete in all respect as per the specification and direction of EIC. |
77 | SITC ofDanger plate 1nos for each pole as per the direction of EIC. |
78 | Supply and installation of Back Clamp for danger plate 25x3mm. Flat 0.95Kg/mtr. flat of 0.510mtr length 1nos= (1x0.59x0.510). Complete in all respect. |
79 | SITC ofGI Barbed wire anticlimbing device 3Kg per support. Complete in all respect. |
80 | SITC of Back Clamp for Anticlimbing divice 25x3mm. Flat 0.95Kg/mtr. flat of 0.510mtr length 4nos= (4x0.59x0.510). Complete in all respect. |
81 | SITC of11kV Pin insulator Polymer, 3nos required for each support. Complete in all respect as per the technical specification and direction of EIC. |
82 | SITC of Earthing of support ( Coil Type). Complete in all respect as per the specification and direction of TPCODL. |
83 | SITC of No-8 GI wire (Dia- 4.6mm) 0.131Kg/mtr , 2 Nos for connecting pole to Coil earthing. Commplete in all respect. |
84 | SITC of GI Not, Bult & Washer of different sizes ( Supply and installation of 1.45Kg per pin point). Complete in all respect. |
85 | Supply laying and installation of 148sqmmAAA Conductor. Complete inall respect as per the specification and direction of E.I.C. |
86 | Supply and painting of Black Paint as required and as per the direction of EIC. |
87 | Supply and painting of Yellow Colour Paint for Background as required and as per the direction of EIC. |
88 | Part C- Cost of Civil Work. |
89 | Concreting ratio 1:1.5:3 (500mmX500mmX2200mm) = 0.45Cu.mtr as required and as per the direction of EIC. |
90 | Couping ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr as required and as per the direction of EIC. |
91 | Dismantling of 80mm2 AAA Conductor |
92 | Part -D Cost of Supply of 11Kv UG cable of length-2Km using 11KV, 3C×400 mm2 UG XLPE cable without spare (1930 Mtr in open trench method & 70mtr in HDD due to road crossing) from infocity PSS to KIIT training centre for bifurcation of 11Kv 4WAY RMU near OTV Line and AB switch as per technical specifications and direction of EIC. |
93 | Supply of 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG Cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-15kA) as per technical specifications and direction of EIC. |
94 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG Cable kits for 3Core(set) as per technical specifications and direction of EIC. |
95 | Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits for 3Core(set) as per technical specifications and direction of EIC. |
96 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits for 3Core(set) as per technical specifications and direction of EIC. |
97 | Supply of materials for High Density Polyethelene (HDPE)PE 80- PN8 pipe 160mm diameter,( for 400sqmm HT cable laying ) as per technical specifications and direction of EIC. |
98 | Supply of RMU 11KV 4WAY, 2 Iso & 2 Brk. 630A(LLVV) as per technical specifications and direction of EIC. |
99 | Earthing |
100 | Supply of Earthing Conductor: 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc.) as per technical specifications and direction of EIC. |
101 | Supply of Pipe Earthing 40mm. GI Pipe 3mtr long. as per technical specifications and direction of EIC. |
102 | Part D- Cost of Erection |
103 | Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, aluminium, XLPE insulation armoured (extruted type) UG cable by open trench method. Complete in all respect as per the direction of EIC. |
104 | Erection of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits for 3core(set). Complete in all respect as per the direction of EIC. |
105 | Erection of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits for 3core(set). Complete in all respect as per the direction of EIC. |
106 | Erection of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits for 3core(set). Complete in all respect as per the direction of EIC. |
107 | Supply, Installation, Laying , Commissioning and Testing of 11kV, 3Core, 400sqmm, aluminium, XLPE insulation armoured (extruted type) UG cable in HDD Method Ith HDPE pipe (160mm dia ,PN8 PE80) for layinf of individual reu of UG cable at main road ans unaccessable place. as per the direction of EIC. |
108 | Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench. Complete in all respect as per the direction of EIC. |
109 | Erection of RMU 11KV 4WAY, 2 Iso & 2 Brk. 630A(LLVV). Complete in all respect as per the direction of EIC. |
110 | Part D- Cost of Civil Works |
111 | Cost of Civil Works with supply of all materials like cement, MS tor rod, brick, coarse and fine agreegates and labour, T&P, etc for UG cable trench. |
112 | Earth work excavation of soil ( 1mtr width X 1mtr Depth) as per the specification of the TPCODL. |
113 | Earth work excavation of soil as per the Direction of the EIC. |
114 | Earth work excavation of hard rock as required and as per the direction of EIC. |
115 | Back filling with excavated soil outside and above the trench as required and as per the direction of EIC. |
116 | Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench (1mtr. Width) as required and as per the direction of EIC. |
117 | Prefabricated RCC Foundation of 11kV RMU. Complete in all respect as per the speecification and Drawing approval of TPCODL as required and as per the direction of EIC. |
118 | Supply and erection of GI fancing with gate around each RMU. Complete in all respect as per the specification and drwaing approval of TPCODL as required and as per the direction of EIC. |
119 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe . as per the specification and direction of TPCODL as required and as per the direction of EIC. |
120 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.) for Cable rising as required and as per the direction of EIC. |
121 | Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works, complete in all respect as per the specification and direction of TPCODL as required and as per the direction of EIC. |
122 | Part E- Cost of Supply of RMU inside infocity PSS (Refer point A in existing SLD of industry feeder- CS Pur-2) and laying of 3C×400mm2 UG XLPE cable of length-30mtr with 1run spare from Rajvatika feeder VCB inside infocity PSS to proposed RMU for feeder birfurcation as per technical specifications and direction of EIC. |
123 | Supply of 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG Cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-15kA) as per technical specifications and direction of EIC. |
124 | Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits for 3Core(set) as per technical specifications and direction of EIC. |
125 | Supply of RMU 11KV 4WAY, 2 Iso & 2 Brk. 630A(LLVV) as per technical specifications and direction of EIC. |
126 | Supply of Earthing materials. |
127 | Supply of Earthing Conductor: 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc.) as per technical specifications and direction of EIC. |
128 | Supply of Pipe Earthing 40mm. GI Pipe 3mtr long. as per technical specifications and direction of EIC. |
129 | Part E- Cost of Erection |
130 | Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, aluminium, XLPE insulation armoured (extruted type) UG cable by open trench method. Complete in all respectas per the specification and direction of EIC. |
131 | Erection of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits for 3core(set). Complete in all respectas per the specification and direction of EIC. |
132 | Erection of RMU 11KV 4WAY, 2 Iso & 2 Brk. 630A(LLVV). Complete in all respect as per the specification and direction of EIC. |
133 | Part E- Cost of Civil Works |
134 | Prefabricated RCC Foundation of 11kV RMU. Complete in all respectas per the specification and direction of EIC |
135 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe as per the specification and direction of EIC |