Labour Contract Cleaning, Sanitation &Various Allied Works At Central Products Dairy, Alappuzha Through “Piece Rate Principal To Principal Independent Labour Contract” Basis
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Jul 2023
0 days left
EMD
15000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
punnapra → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Labour Contract Cleaning, Sanitation &Various Allied Works At Central Products Dairy, Alappuzha Through “Piece Rate Principal To Principal Independent Labour Contract” Basis
BOQ
| Sl. No. | Item Description |
| 1 | LABOUR CONTRACT CLEANING, SANITATION &VARIOUS ALLIED WORKS AT CENTRAL PRODUCTS DAIRY, ALAPPUZHA THROUGH “PIECE RATE PRINCIPAL TO PRINCIPAL INDEPENDENT LABOUR CONTRACT” BASIS |
| 2 | FOR DAILY CLEANING ACTIVITIES:Milk reception dock, Tray washer, Cold storage room, Anti room |
| 3 | Cleaning of steel panel in Milk filling room and Ghee room |
| 4 | Wash and clean the steel panelling provided in the anteroom and cold storage room, Wash andclean the steel panellingfromreception dock to the cold storage. |
| 5 | Open gutters, pit and canals through which water from gutters, which are located below the reception dock. |
| 6 | Two milk filling machine hall and corridors associated with hall |
| 7 | Processing hall and CIP tank room |
| 8 | Stairs from processing hall to the overhead tank and both tank halls on the first and second floor |
| 9 | Main entrance ,hall, office rooms associated with dairy plant |
| 10 | Complete cleaning of laboratory in the Ist floor |
| 11 | Corridors connecting dairy and powder plant |
| 12 | Workers dress changing room and its surroundings |
| 13 | Toilets and bathrooms (both ladies and gents) in dairy, store building and also in dress changing room. |
| 14 | Boiler hall, Refrigeration hall & new IBT hall. |
| 15 | Work shop and adjoin work area, Water softener room, Generatorroom (2 Nos.), panel room, corridor connecting processing hall and boiler & milk silo platform including SS passage inside dairy. |
| 16 | All rooms, conference hall, Managers room, toilet and Record keeping room located on the first floor of Admin. block and reception, bathroom& stairs on the lower floor etc |
| 17 | Dairy stores building ( including Raw Material store, Engineering store etc) |
| 18 | Ghee filling hall, Juice hall and Milma Plus filling hall, Flavoured Milk incubation area, Finished Goods Store area in MPF |
| 19 | Main dockyard(concreted portion) located in front of dairy |
| 20 | Open places and places in front of main godown and its surroundings within 3 meter perimeter in the dairy |
| 21 | Front portion of old dairy, surroundings of old generator set, the portion in between main godown and old dairy |
| 22 | Surroundings of security cabin and north portion of dockyard |
| 23 | All roads and sidewalks within dairy, spaces in between the dairy plant and MPF plant |
| 24 | Open space around the store and eastern portion of road till MPF building |
| 25 | Security cabin (two Nos.) |
| 26 | Rest room for staffs ,Bath rooms and toilets in the rest room |
| 27 | FOR WEEKLY CLEANING ACTIVITIES: Main godown of dairy (3 cells and front portion) |
| 28 | MPF godown for ghee and powder, Dock and first floor |
| 29 | Butter and ghee room in MPF |
| 30 | Following rooms and halls in MPF1) L.T Room2) Boiler/Air heating room and platform were oil tank is placed3) Evaporation hall, drying hall & all structures within the hall including stairs and platforms.4) Powder packing hall5) Generator room and platform 6) Technical officers’ room |
| 31 | Works carried out under daily cleaning activities from Sl. No. 1.19-1.23. |
| 32 | Bell mouth up to the tarred part of NH ( Main Gate) |
| 33 | 8 Mtr. wide around canteen building |
| 34 | 8 Mtr. wide around North and West side of administrative building |
| 35 | Scooter shed-2 Nos., Car shed- 1 No. |
| 36 | All rooms on the ground floor of Admin Block including conference hall, toilet etc |
| 37 | Removal of grasses,shurbsetc growing inside the dairy compound.( Assign two employees separately for this job) |
| 38 | FOR MONTHLY CLEANING ACTIVITIES: Cleaning works that has to carried out on the roofs of the buildings as follows:a) Whole dairy plant b) MPF Building completelyc) Dairy store building completely d) Two Security cabin e )Canteen building completely f) Administrative blockg) Main dairy godownh) Old dairy buildingi) Old dairy store buildingj) ETP pump house |
| 39 | Clean the weed growth in transformer yard and furnace oil yard in two meters wide around it |
| 40 | Monthly amount for cleaning related to ETP PlantSl. No.10 in Page No. 16 of Tender Document |
| 41 | Monthly amount for Garden Maintenance, Cleaningand also for watering of fruit trees during non –rainy season Sl. No.11 in Page No. 16 of Tender Document |
AI Tender Summary
Tender Timeline
Jul 13, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 21, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 22, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender