Tender For Supply, Installation, Testing And Commissioning Of Field Instruments And Equipment For Upgradation Of Existing Pneumatic Control Loop, Sibsagar-Assam

Assam Power Generation Corporation Limited-APGCL has published Tender For Supply, Installation, Testing And Commissioning Of Field Instruments And Equipment For Upgradation Of Existing Pneumatic Control Loop. Submission Date for this Tender is 21-09-2023. Electrification Work Tenders in Sibsagar Assam. Bidders can get complete Tender details and download the document.




Tender Notice

38608900
Corrigendum : Tender For Supply, Installation, Testing And Commissioning Of Field Instruments And Equipment For Upgradation Of Existing Pneumatic Control Loop
Open Tender
Indian
Assam
Sibsagar
21-09-2023

Tender Details

Supply, Installation, Testing And Commissioning Of Field Instruments And Equipment For Upgradation Of Existing Pneumatic Control Loop ( Comprising Of Pt, Pic, Pcv, Etc. ) Into Analog 4-20 Ma Closed Loop Control System For Discharge Pressure Control Valves And Suction Pressure Control Valves Of Gas Compressor Units At Lakwa Thermal Power Station, Maibella ( Ltps ) , Suffry-785689, Dist. Charaideo, Assam.- 1 Analog Pressure Transmitter: Technical Requirement:• Loop Powered, 4-20 Ma Output. Range: 0-20Kg / Cm2, Span Adjustable.• Flame Proof Enclosure: Type “D” ( Ex D ) For Class I Division 1 Zone 0 Operation. 2 Multiple Loops Controller:Technical Requirement:• Ai 4-20 Ma, Ao 4-20 Ma With Local User Interface And Mounting Panel. 3 Redundant Power Supply:Technical Requirement: ( Input 220Vdc, Output 24Vdc, 10Amps ) Note: Individual Power Supply Module Must Be Capable Of Supplying Power To The Entire System.The Power Module Must Be Installed In One Working And One Standby Mode And Feature Of Automatic Load Transfer To The Standby Power Supply Module Must Be Available In Case The Power Supply Module In Service Becomes Faulty. Such Power Supply Switching Must Take Place Without Any Interruption Of The Controllers And Gas Compressors’ Operation. 4 Armoured Control Cable With Glands At Termination:Technical Requirement: • 4 Core, 2 Pair: • Laying Required From Control Room To Field Junction Box. 5 Armoured Control Cable With Glands At Termination: Technical Requirement:• 3 Core, 2 Pair: • Laying Required From Field Junction Box To Pressure Transmitter & Positioner. 6 Smart E / P Positioner With External I / P: ( For Operation In Natural Gas ) 7 New Mounting Brackets For The New Positioners Offered: 8 Flame Proof Junction Box With Terminal Block For Establishing Connections Between The Controllers, Pressure Transmitters And Positioners With Flame Proof Enclosure - Type “D” ( Ex D ) For Class I Division 1 Zone 0 Operation With Nema & Nec Type 3. 9 Delay Timer: Technical Requirement:• Time Delay: 0-10 Sec ( Adjustable ) . • Flame Proof Enclosure: Type “D” ( Ex D ) For Class I Division 1 Zone 0 Operation. 10 Solenoid Valve Having Flame Proof Enclosures - Type “D” ( Ex D ) For Class I Division 1 Zone 0 Operation. 11 Ss Tubes And Fittings Of Suitable Size For Connecting Pressure Transmitters, Positioners, Pressure Regulator With Moisture Drain, Pressure Control Valves, Etc. ( Required For 2 Nos. Of Gas Compressors Discharge Pcvs And 4 Nos. Of Suction Pcvs. ) 12 Pressure Regulator With Drain Facility: 13 Communication Cable From Controllers To The Desktop Pc Based Hmi, Rs485 / 232 Converters Etc.: 14 Hmi: Technical Requirement:• Desktop Pc Based To Control And Monitoring The Pressure Control Valves.• Monitor: 24 Inch, Full Hd Desktop Monitor, 75 Or Above Refresh Rate, 1920 X 1080 Pixels.• Processor: Intel Corei7, 13 Gen Intel Core Processor. System Type: 64 Bit Based Processor.• Installed Ram: 16 Gb.• Operating System Window 10 Pro.• Hmi Software Should Display And Supervisory Control The Following:I. 2Nd Stage Gas Discharge Pressure Of Gas Compressors And 1St Stage Gas Suction Pressures.Ii. Pressure Control Valve Opening / Close Position. Iii. Historical Trends Of All Hmi Data Should Be Stored For At Least 30 Days.Note: Pressure Control Valves Should Be Controlled From Pid Controller’S Manual And Auto Set Points As Well As From The Hmi Desktop Computer. 15 Panel For Mounting Controllers, Power Supply Modules, Mcb Breaker With Cooling Fan Etc. 16 Mcb With Suitable Amps Rating For Power Supply. 17 Instrument Earthing Kit For Earthing Of Controllers, Pressure Transmitters And Positioners. 18 2 Core Power Cable ( Armoured ) For Power Supply Of Controller: 19 Needle Valves 1 / 2: 20 Needle Valves 1 / 4 21 Service Charge Forerection, Installation, Testing & Commissioning Of Controllers, Equipment, Instruments Etc. For Successful And Corrected Operation Of The 06 Nos. Pressure Control Valves Of Ltps Using The New Supplied System. Integration Of All The Supplied Controllers Along With The Existing Controller Of Gas Compressor No. 6 Into A Single System, To Be Controlled And Monitored Using Desktop Pc Based Hmi. 22 P&F Charges Against Items Undersl. No. 1 To 20. 23 Freight Against Items Undersl. No. 1 To 20Note: Freight Bill To Be Submitted With Final Bill. 24 Transit Insurance Against Items Under Sl. No. 1 To 20Note: Insurance Bill To Be Submitted With Final Bill.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 02-Aug-2023 Tender Extension Date 16-08-2023
2 16-Aug-2023 Extension of last date of bid submission Date 28-08-2023
3 29-Aug-2023 3rd Extension of last date of bid submission Date 07-09-2023
4 07-Sep-2023 4th tender extension Date 21-09-2023

Key Value

Document Fees
INR 1000 /-
EMD
INR 150000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Supply, Installation, Testing and Commissioning of field instruments and equipment for upgradation of existing pneumatic control loop (comprising of PT, PIC, PCV, etc.) into Analog 4-20 mA closed loop control system for Discharge Pressure Control Valves and Suction Pressure Control Valves of Gas Compressor Units at Lakwa Thermal Power Station, Maibella (LTPS), Suffry-785689, Dist. Charaideo, Assam.
Sl. No. Item Description
1Analog Pressure Transmitter: Technical Requirement: • Loop Powered, 4-20 mA output. Range: 0-20kg/cm2, span adjustable. • Flame proof Enclosure: Type “d” (Ex d) for Class I Division 1 Zone 0 operation.
2Multiple Loops Controller: Technical Requirement: • AI 4-20 mA, AO 4-20 mA with local user interface and mounting panel.
3Redundant Power Supply: Technical Requirement: (Input 220VDC, output 24VDC, 10Amps) Note: Individual power supply module must be capable of supplying power to the entire system. The power module must be installed in one working and one standby mode and feature of automatic load transfer to the standby power supply module must be available in case the power supply module in service becomes faulty. Such power supply switching must take place without any interruption of the Controllers and gas compressors’ operation.
4Armoured Control Cable with glands at termination: Technical Requirement: • 4 core, 2 pair: • Laying required from control room to field junction box.
5Armoured Control Cable with glands at termination: Technical Requirement: • 3 core, 2 pair: • Laying required from field junction box to Pressure Transmitter & Positioner.
6Smart E/P Positioner with external I/P: (For operation in Natural Gas)
7New mounting Brackets for the new positioners offered:
8Flame proof junction box with terminal block for establishing connections between the Controllers, Pressure Transmitters and Positioners with Flame Proof Enclosure - Type “d” (Ex d) for Class I Division 1 Zone 0 operation with NEMA & NEC TYPE 3.
9Delay Timer: Technical Requirement: • Time Delay: 0-10 sec (adjustable). • Flame Proof Enclosure: Type “d”(Ex d) for Class I division 1 Zone 0 operation.
10Solenoid Valve having Flame Proof Enclosures - Type “d”(Ex d) for Class I Division 1 Zone 0 operation.
11SS tubes and fittings of suitable size for connecting Pressure transmitters, Positioners, Pressure Regulator with moisture drain, Pressure Control Valves, etc. (Required for 2 nos. of Gas Compressors Discharge PCVs and 4 nos. of Suction PCVs.)
12Pressure Regulator with drain facility:
13Communication Cable from Controllers to the Desktop PC based HMI, RS485/232 converters etc.:
14HMI: Technical Requirement: • Desktop PC based to control and monitoring the Pressure Control Valves.• Monitor: 24 inch, Full HD desktop monitor, 75 or above refresh rate,1920 x 1080 pixels.• Processor: Intel corei7,13 Gen intel core processor. System type: 64 bit based processor. • Installed RAM: 16 GB. • Operating system Window 10 Pro. • HMI software should display and supervisory control the following: i. 2nd stage gas discharge pressure of gas compressors and 1st stage gas suction pressures. ii. Pressure control valve opening/close position. iii. Historical trends of all HMI data should be stored for at least 30 days. Note: Pressure Control Valves should be controlled from PID Controller’s manual and auto set points as well as from the HMI desktop computer.
15Panel for mounting controllers, power supply modules, MCB breaker with cooling fan etc.
16MCB with suitable amps rating for power supply.
17Instrument Earthing Kit for earthing of Controllers, Pressure Transmitters and Positioners.
182 core Power cable (Armoured) for power supply of Controller:
19Needle valves 1/2":
20Needle valves 1/4"
21Service Charge forErection, Installation, Testing & Commissioning of Controllers, equipment, instruments etc. for successful and corrected operation of the 06 nos. pressure control valves of LTPS using the new supplied system. Integration of all the supplied controllers along with the existing controller of Gas Compressor no. 6 into a single system, to be controlled and monitored using Desktop PC based HMI.
22P&F Charges against Items underSl. No. 1 to 20.
23Freight against Items underSl. No. 1 to 20 Note: Freight bill to be submitted with final bill.
24Transit Insurance against items under Sl. No. 1 to 20 Note: Insurance bill to be submitted with final bill.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail