Purchase Of Machines As Well As Amc. Sub-Head:-Complete Denting & Painting With Allied Works Of Vehicle No. Dl 1M 8954, Dl 1M 8960, Dl 1M 8968, Dl 1M 8959 Power Spray Tanker Ofdho / Nz, Dho / Rz, Dho / Clz, And Dho / Kbz Also Getting Fitness Certificatefor The Year 2023-2024 Under Civil Line Zonemcd At Health And Malaria ( Auto ) Workshop. 1 Power Spray Tank Having 6000 Liters. Storage Water Tank Capacity Shall Be Clean Inside By The High Pressure Water Sprayandthan By Cleaning Chemical After Opening The Back Side Of Tank By Electric Cutter And Replace Of All The Partition For Inbuilt And Inter Connected Compartment With Separate Flange By 4 Mm Thickness Ms Sheet Through Double Electric Welding. Intake Cum Manual Access Port Of Every Compartment Shall Be Repair And Provide New Covering And Locking Arrangement. P&F Of Outlet Of The Tank Having 80 Mm Dia Ms Pipe Duly Provide With The Same Dai Ball Type Gate Valve To Regulate The Flow Of Water. On The Upper Side Of The Tank Safety Railing Shall Be Replaced By New One And Testing The Complete Unit At Full Load In Satisfactory Condition. The Complete Tank Shall Be Given Anti Corrosive Treatment And Epoxy Coating All Over Inner Side Of The Tank. Complete Outer Portion Of The Tank Shall Be Paint By Double Coated Of Blue Enamel Paint Through Spray Method With All Writing Slogans As Per Required By The Dept. 2 Complete Cabin Shall Be Repair And Denting Job Work With Removing Worn Out Portion And Patching By New Sheet Through Gas Welding And Electric Welding. All Door And Door Lock Shall Be Repair By Replace Or Setting. Complete Making Of Driver And Conductor Seat By Filling Up New Rexene And Foam With Setting. All Channel And Bleeding Of Door Shall Be Replaced. The Complete Cabin Shall Be Painted By Double Coat Of Blue Enamel Paint Through Spray Method And Writing Slogans As Per Requirement Of The Deptt . 3 Complete Rear Canopy / Platform Repaired And Patching Of Size 5”7”3” ( Feet ) By New Ms Chattered Sheet, Angle, U Channel. Replace Of Rear Canopy Roof By New One And Repair Of Both Side Pillar Having Channel Of Ms Sheet With Replace Of Platform Worn Out Portion Of Power Spray Engine Platform By Electric Weldingalong With Locking Sys Of Tool Box. Complete Rear Canopy Shall Be Paint By Blue Enamel Paint Through Spray Method. 4 Complete Servicing Of 407 Bs Iii Four Cyl, Inline, Vertical, Four Stock, Water Cooled, Self Ignition, Turbo Charger, Diesel Engine Having Bs Iii Model By Cleaning And Setting Of All Required Parts Like Air Filter, Fuel Filter, Primer Filter, Diesel Pipe, 01 No’S, Injector Leak Off Line, Complete Cleaning Of Radiator Assay And Oil Cooler And Replace Of Air Hose Pipe. 5 Complete Dismantling Of Turbo Charger Assay And Repair / Replace Of Shaft Assay, Brg And Balancing Of Impeller, Shaft Assay Along With Other Parts, Including Laboure Charges Of Vehicle No , Dl 1M 8954, Dl 1M 8959. 6 Complete O / H Of Front And Rear Suspension Sys By Opening / Dismantling The Leaf Spring And Re-Tensioning As Per Requirement. Replace Of U Bolt, V Clamp, Center Bolt, Shackle Pinwith Retensioning And Refitting The All Front And Rear Suspension Sys. 7 P&F Of All The Three Side Safety / Support By Electric Welding Having Standard Size Of Material And Gauge As Per Norms. 8 All The Electric Sys Including Replace Of Worn Out Wiring Parts, Tail Light Assay, Sensor Assay, Relays, Fuse Box Etc And General Service Of Self-Starter Assy And Alternator Assay, With Replace Of Required Parts. 9 Complete Overhauling Of Rotary F I Pump Having Sensor And Relay Type& Injector Assay By Replace Of Nozzle Shim, Brgs, Centrifugal Weight, Injector Pipe, Injector Leak Off Line, Injector Sensor, Etc. And Complete Fip And Injector Assay Shall Be Put On Calibrating Machine For Setting Of Diesel Supply At Different Load Along With Test Of Dribbling Test, Spraying Test, Droplet Test, Pressure Test As Per Ecm Starting Of Engine. Engine Shall Be Tested On Full Load Up To Sufficient Pollution Level And Provide The Pollution Certificate From The Pollution Dept. Of Vehicle No , Dl 1M 8959, Dl 1M 8954. 10 Complete Front And Rear Brake Sys Shall Be Repair By Replace Of Brake Liner, Hub Greasing All The Four Wheels By Replace Of Seal, Grease, Check Nut And Other Required Parts And Adjustment Of All The Four-Wheel Brake Sys. 11 Complete Vehicle Shall Be Put Up By The Contractor To The Transport Dept. For Getting The Fitness Certificate For The Year Of 2023-24.