Supply And Works Under Edsd-2Nd Under Uerc Head 2023-24., bageshwar-Uttarakhand

Uttarakhand Power Corporation Limited-UPCL has published Supply And Works Under Edsd-2Nd Under Uerc Head 2023-24.. Submission Date for this Tender is 02-08-2023. Road Work Tenders in bageshwar Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

38590986
Supply And Works Under Edsd-2Nd Under Uerc Head 2023-24.
Open Tender
Indian
Uttarakhand
bageshwar
02-08-2023

Tender Details

Supply And Works Under Edsd-2Nd Under Uerc Head 2023-24.- Supply Of Items :- 2 Holding Clamp For Sp-23 Pole With N&B 3 Stay Clamp S / Ended For Sp-23 Pole With N&B 4 Breasing Set Clamp Top For Sp-23 Pole With N&B 5 Breasing Set Clamp Bottom For Sp-23 Pole With N&B 6 Earth Wire Clamp For Sp-23 Pole With N&B 7 Aluminium Lugs 70 Sqmm 8 Aluminium Lugs 120 Sqmm 9 Aluminium Lugs 150 Sqmm 10 Lt Shackle Insulator 100X115 Mm With N&B 11 Lt Shackle Insulator Clamp For Sp-10 Pole With N&B 12 Lt Stay Insulator 13 Lt Stay Clamp For Sp-10 Pole With N&B 14 Earth Wire Clamp For Sp-10 Pole With N&B 15 Labour Charges :- 16 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 0-20Km ) 17 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 21-50Km ) 18 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 51-70Km ) 19 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 71-100Km ) 20 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 100-150Km ) 21 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 150-200Km ) 22 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 0-20Km ) 23 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 21-50Km ) 24 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 51-70Km ) 25 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 71-100Km ) 26 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 100-150Km ) 27 Cartage Of St Pole 8.5 Mtr Sp- 21 / 23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking ( 150-200Km ) 28 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 0-20Km ) 29 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 21-50Km ) 30 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 51-70Km ) 31 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 71-100Km ) 32 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 100-150Km ) 33 Cartage Of Material ( Other Than Poles ) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends ( 150-200Km ) 34 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 0-20Km ) 35 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 21-50Km ) 36 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 51-70Km ) 37 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 71-100Km ) 38 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 100-150Km ) 39 Cartageof The Transformer 11 / 0.4Kv, 16 / 25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 150-200Km ) 40 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 0-20Km ) 41 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 21-50Km ) 42 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 51-70Km ) 43 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 71-100Km ) 44 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 100-150Km ) 45 Cartageof The Transformer 11 / 0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 150-200Km ) 46 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 0-20Km ) 47 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 21-50Km ) 48 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 51-70Km ) 49 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 71-100Km ) 50 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 100-150Km ) 51 Cartageof The Transformer 11 / 0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points ( 150-200Km ) 52 Headload Cartage Of St Pole 8.0Mtr Sp-10 From Road To Site ( Upto 0.0 To 1.0 Km ) 53 Headload Cartage Of St Pole 8.0Mtr Sp-10 From Road To Site ( Upto 1.0 To 3.0 Km ) 54 Headload Cartage Of St Pole 8.5Mtr Sp-21 / 23 From Road To Site ( Upto 0.0 To 1.0 Km ) 55 Headload Cartage Of St Pole 8.5Mtr Sp-21 / 23 From Road To Site ( Upto 1.0 To 3.0 Km ) 56 Head Load Cartageof Smallmaterial. ( Up To 0.0 To 1.0 Km ) 57 Head Load Cartageof Smallmaterial. ( Up To 1.0 To 3.0 Km ) 58 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 16Kva Along With Loading / Unloading At Both Points. ( Up To 0 To 1 Km ) 59 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 16Kva Along With Loading / Unloading At Both Points. ( Up To 1 To 3 Km ) 60 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 25Kva Along With Loading / Unloading At Both Points. ( Up To 0 To 1 Km ) 61 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 25Kva Along With Loading / Unloading At Both Points. ( Up To 1 To 3 Km ) 62 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 63Kva Along With Loading / Unloading At Both Points. ( Up To 0 To 1 Km ) 63 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 63Kva Along With Loading / Unloading At Both Points. ( Up To 1 To 3 Km ) 64 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 100Kva Along With Loading / Unloading At Both Points. ( Up To 0 To 1 Km ) 65 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of The Transformer 11 / 0.4Kv, 100Kva Along With Loading / Unloading At Both Points. ( Up To 1 To 3 Km ) 66 Excavation Of Earth For Pole Pit Of Size 0.9X0.6X1 / 6 Of Full Length Of Ple For Erection Of Pole In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 67 Erection Of St Pole 8.0 Mtr Sp-10 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 68 Erection Of St Pole 8.0 Mtr Sp-21 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 69 Erection Of St Pole 8.0 Mtr Sp-23 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 70 Erection Of Sp-23 Double Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel, X-Bracing & Clamps As Per Resspo Construction Manual. 71 Grouting Of Pole In Size 0.45X0.45X1 / 9 Of The Support In Cc Ratio 1:4:8 ( 1 Cement: 4Graded Stone20 Mm Nominal Size : 8 Coarse Sand ) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Construction Manual. 72 Muffing Of Polessize 0.45 Cm X 0.60 Cm Radious With Cc1:3:6 ( 1 Cement: 3 Coarse Sand: 6 Graded Stone10 Mm Nominal Size ) Block Size 45 Cm Height From Ground Level Including Cost Of Cement , Stone And Sand Etc. 73 Fabrication Of M.S Channel Angle Iron After Cutting In Required Sizeswith Drilling Of Holes Up To Good Finish For Top Channel, Bracing And Special Type Bracket Etc. As Per Resspo Sehedule And Local Approved Drawing. 74 Excavation Of Earth For Stay Pit Of Size 0.6X0.6X1.2 Mtr In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 75 Fixing, Tightening And Nozzalling Of Lt Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 76 Fixing, Tightening And Nozzalling Of 11Kv Linestay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 77 Grouting Of Stay Insize 0.6X0.6X0.3In Cc Ratio 1:4:8 ( 1 Cement: 4Graded Stone20 Mm Nominal Size : 8 Coarse Sand ) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Manual. 78 Earthing Of Support With M.S. Earth Rod Of 2.5 Meter Long By Hammaring Of M.S. Rod To Proper Depth And Connecting The Earth Electrode With The Help Of G.I. Wire As Per Construction Manual. 79 Laying, Spreading, Stringing And Sagging Of 11 Kv / 33Kv Line In 3 Phase ( 3 Phase 4 Wire ) Of The Acsr Weasel Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 80 Laying Spreading Stringing And Sagging Of 11 Kv / 33Kv Line In 3 Phase ( 3 Phase 4 Wire ) Of The Acsr Rabbit Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 81 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase5wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 82 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase4wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 83 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 2Phase3wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 84 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 1Phase2wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 85 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase5wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 86 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase4wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 87 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 2Phase3wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 88 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 1Phase2wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspospecn. 89 Chemicalearthing : Earthing Of Distribution Transformer Including Digging Of Pit Of Size 2.5 Mtr Depth And Make Hole Of Size 150 Mm. Placing Of Earthing Electrode ( To Be Supplied By Contractor As Per Drawing No. A ) As Drawing B, Connecting The Same With G.I Strip ( To Be Supplied By Contractor ) Of Size 35X6 Mm As Per Drawing Cfor A Minimum Length 6 M. Treatment Of Soil With Highly Condctive Substance As Per Is 30343 Complete In All Respect, Result Of Earthing Resistance After Earthing Should Be Less Than 1 Ohm. 90 Guarding Of Lt / 11Kv Line Over ( Telephone / Road / L.T. Line Crossing As Per Drawing With 6 / 8 Swg G.I. Including Fixing Of Guarding Channel / Angle As Per Ressp Manual L.T / 11 Kv. 91 Laying And Erection Of L.T. Pvc Cable Including Crimping Of Lugs Of Size 1X70, 120, 150 Sq. Mm. ( Including All Cost Of Material ) 92 Laying And Erection Of L.T. Pvc Single Leadcable Including Crimping Of Lugs Of Size 1X240, 400, 680 Sq. Mm. Etc ( Including All Cost Of Material ) 93 Mounting & Fixing Of Tpmo On Double Pole Structures Including Making Of Connections Complete Work. 94 Mounting & Fixing Of Fuse Sets On Double Pole Structures Including Making Of Connections Complete Work 95 Mounting And Fixing Of Lighting Arrestor Set ( 3 Nos. ) On Double Pole Structure Including Making All Connections By G.I. Strip Size 35X6 Mm To Earth Point Complete Work ( Excluding Cost Ofg.I. Strip ) 96 Painting Of St Pole Sp-23 / 21 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 97 Painting Of St Pole Sp-10 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 98 Jointing And Fixing Of 11Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor / Outdoor Cable Bosex. 99 Dismantling Of 100Kva Transformers From Double Pole / Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 100 Dismantling Of 63Kva Transformers From Double Pole / Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 101 Dismantling Of 25Kva Transformers From Double Pole / Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 102 Dismantling Of 16Kva Transformers From Double Pole / Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 103 Installation / Mounting Of New 100Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 104 Installation / Mounting Of New 63Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 105 Installation / Mounting Of New 25Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 106 Installation / Mounting Of New 16Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 107 Route Cleareance By Cutting Of Tree Branches / Proning, Loping And Chopping Of Trees For L.T, 11& 33 Kv Line. 108 T - Off Connection Complete 11 Kv Line. 109 Providing And Fixing Of Danger Board And Number Plate Complete By Providing Of Mrs. Flat 50X6 Mm And Nuts & Bolts, Danger Boards Of M.S Sheet 2 Mm Thick 11X7 Size ( Including Cost Of All Material ) 110 Digging Of Trench Of Size 0.60X1.5X1.5 Mtr, And Laying Of Under Ground 11 Kv Xlpecable With Making Of Brick Housing And Filling Of Sand Including Filling Of Earth With Ramming. & Repairing Of Road Including Cost Of Cement Sand And Stone Blast.

Key Value

Document Fees
INR 590 /-
EMD
INR 36000.0 /-
Tender Value
INR 10 Lakhs /-

BOQ Items

Name of Work: SUPPLY AND WORKS UNDER EDSD-2ND UNDER UERC HEAD 2023-24.
Sl. No. Item Description
1SUPPLY OF ITEMS :-
2HOLDING CLAMP FOR SP-23 POLE WITH N&B
3STAY CLAMP S/ENDED FOR SP-23 POLE WITH N&B
4BREASING SET CLAMP TOP FOR SP-23 POLE WITH N&B
5BREASING SET CLAMP BOTTOM FOR SP-23 POLE WITH N&B
6EARTH WIRE CLAMP FOR SP-23 POLE WITH N&B
7ALUMINIUM LUGS 70 SQMM
8ALUMINIUM LUGS 120 SQMM
9ALUMINIUM LUGS 150 SQMM
10LT SHACKLE INSULATOR 100X115 MM WITH N&B
11LT SHACKLE INSULATOR CLAMP FOR SP-10 POLE WITH N&B
12LT STAY INSULATOR
13LT STAY CLAMP FOR SP-10 POLE WITH N&B
14EARTH WIRE CLAMP FOR SP-10 POLE WITH N&B
15LABOUR CHARGES :-
16Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (0-20KM)
17Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (21-50KM)
18Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (51-70KM)
19Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (71-100KM)
20Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (100-150KM)
21Cartage of ST Pole 8.0 mtr SP- 10 from store centre to construction site with loading, unloading at both points and proper stacking (150-200KM)
22Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (0-20KM)
23Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (21-50KM)
24Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (51-70KM)
25Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (71-100KM)
26Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (100-150KM)
27Cartage of ST Pole 8.5 mtr SP- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (150-200KM)
28Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(0-20KM)
29Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(21-50KM)
30Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(51-70KM)
31Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(71-100KM)
32Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(100-150KM)
33Cartage of material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(150-200KM)
34Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (0-20KM)
35Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (21-50KM)
36Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (51-70KM)
37Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (71-100KM)
38Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (100-150KM)
39Cartageof the Transformer 11/0.4Kv, 16/25 KVA capacity from store center to construction site with loading and unloading at both points (150-200KM)
40Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (0-20KM)
41Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (21-50KM)
42Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (51-70KM)
43Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (71-100KM)
44Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (100-150KM)
45Cartageof the Transformer 11/0.4Kv, 63 KVA capacity from store center to construction site with loading and unloading at both points (150-200KM)
46Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (0-20KM)
47Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (21-50KM)
48Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (51-70KM)
49Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (71-100KM)
50Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (100-150KM)
51Cartageof the Transformer 11/0.4Kv, 100 KVA capacity from store center to construction site with loading and unloading at both points (150-200KM)
52Headload cartage of ST Pole 8.0mtr SP-10 From road to site (upto 0.0 to 1.0 KM)
53Headload cartage of ST Pole 8.0mtr SP-10 From road to site (upto 1.0 to 3.0 KM)
54Headload cartage of ST Pole 8.5mtr SP-21/23 From road to site (upto 0.0 to 1.0 KM)
55Headload cartage of ST Pole 8.5mtr SP-21/23 From road to site (upto 1.0 to 3.0 KM)
56Head load Cartageof smallmaterial. (Up to 0.0 to 1.0 KM)
57Head load Cartageof smallmaterial. (Up to 1.0 to 3.0 KM)
58Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 16KVA along with loading/ Unloading at both points. (Up to 0 to 1 KM)
59Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 16KVA along with loading/ Unloading at both points. (Up to 1 to 3 KM)
60Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 25KVA along with loading/ Unloading at both points. (Up to 0 to 1 KM)
61Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 25KVA along with loading/ Unloading at both points. (Up to 1 to 3 KM)
62Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 63KVA along with loading/ Unloading at both points. (Up to 0 to 1 KM)
63Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 63KVA along with loading/ Unloading at both points. (Up to 1 to 3 KM)
64Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 100KVA along with loading/ Unloading at both points. (Up to 0 to 1 KM)
65Head load Cartage/ manual shifting/ lifting with crane/hydra of the Transformer 11/0.4KV, 100KVA along with loading/ Unloading at both points. (Up to 1 to 3 KM)
66Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of ple for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
67Erection of ST Pole 8.0 mtr SP-10 Single support pole in proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
68Erection of ST Pole 8.0 mtr SP-21 Single support pole in proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
69Erection of ST Pole 8.0 mtr SP-23 Single support pole in proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
70Erection of SP-23 Double support pole in proper level and alignment along with fixing of all accessories, like top channel, X-Bracing & clamps as per RESSPO construction Manual.
71Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement: 4graded stone20 mm nominal size : 8 coarse sand) block including cost of Cement , sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment , leveling as per RESSPO construction Manual.
72Muffing of polessize 0.45 cm x 0.60 cm radious with CC1:3:6 (1 cement: 3 coarse sand: 6 graded stone10 mm nominal size)block size 45 cm height from ground level including cost of Cement , stone and sand etc.
73Fabrication of M.S Channel Angle iron after cutting in required sizeswith drilling of holes up to good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
74Excavation of earth for Stay pit of size 0.6x0.6x1.2 mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
75Fixing, tightening and nozzalling of LT Stay with pole and stay rod on required tension as per drawing / RESSPO manual.
76Fixing, tightening and nozzalling of 11KV LineStay with pole and stay rod on required tension as per drawing / RESSPO manual.
77Grouting of Stay insize 0.6x0.6x0.3in CC ratio 1:4:8 (1 cement: 4graded stone20 mm nominal size : 8 coarse sand) block including cost of Cement , sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment , leveling as per RESSPO Manual.
78Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual.
79Laying, Spreading, Stringing and sagging of 11 Kv /33Kv line in 3 Phase ( 3 Phase 4 Wire) of the ACSR Weasel Conductor as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart.
80Laying Spreading Stringing and sagging of 11 Kv /33Kv line in 3 Phase ( 3 Phase 4 Wire) of the ACSR Rabbit Conductor as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart.
81Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Weasel Conductor 3Phase5Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
82Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Weasel Conductor 3Phase4Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
83Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Weasel Conductor 2Phase3Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
84Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Weasel Conductor 1Phase2Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
85Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Rabbit Conductor 3Phase5Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
86Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Rabbit Conductor 3Phase4Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
87Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Rabbit Conductor 2Phase3Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
88Laying, Spreading, Stringing and sagging of L.T.Lines of the ACSR Rabbit Conductor 1Phase2Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPOSpecn.
89ChemicalEarthing : Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. placing of earthing electrode (to be supplied by contractor as per drawing No. A ) as drawing B, connecting the same with G.I Strip ( to be supplied by contractor ) of size 35x6 mm as per drawing Cfor a minimum length 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance after earthing should be less than 1 Ohm.
90Guarding of LT/11KV Line over ( Telephone / Road /L.T. line crossing as per drawing with 6/8 SWG G.I. including fixing of guarding channel / angle as per RESSP manual L.T /11 Kv.
91Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120,150 Sq. mm. (including all cost of material)
92Laying and erection of L.T. PVC single leadCable including crimping of lugs of size 1x240,400,680 Sq. mm. etc (including all cost of material)
93Mounting & Fixing of TPMO on double pole structures including making of connections complete work.
94Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work
95Mounting and Fixing of Lighting arrestor set (3 Nos.) on double pole structure including making all connections by G.I. strip size 35x6 mm to earth point complete work (excluding cost ofG.I. Strip)
96Painting of ST Pole SP-23/21 poles with angle channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and whiter Paint 30 Cm wide up to 1.5 Mtrs. From ground level.
97Painting of ST Pole SP-10 poles with angle channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and whiter Paint 30 Cm wide up to 1.5 Mtrs. From ground level.
98Jointing and Fixing of 11KV XLPE Heat shrinkable Cable jointing Kits indoor/ outdoor cable bosex.
99Dismantling of 100KVA Transformers from double pole /plinth including opening of all connetions , circuts & earthing strip etc.
100Dismantling of 63KVA Transformers from double pole /plinth including opening of all connetions , circuts & earthing strip etc.
101Dismantling of 25KVA Transformers from double pole /plinth including opening of all connetions , circuts & earthing strip etc.
102Dismantling of 16KVA Transformers from double pole /plinth including opening of all connetions , circuts & earthing strip etc.
103Installation / mounting of new 100KVA Transformer on double pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
104Installation / mounting of new 63KVA Transformer on double pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
105Installation / mounting of new 25KVA Transformer on double pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
106Installation / mounting of new 16KVA Transformer on double pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
107Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T, 11& 33 KV line.
108T - off Connection Complete 11 Kv line.
109Providing and fixing of Danger Board and number plate complete by providing of Mrs. Flat 50x6 mm and Nuts & Bolts,danger Boards of M.S Sheet 2 mm Thick 11"x7" size (Including cost of all material)
110Digging of trench of size 0.60x1.5x1.5 Mtr, and laying of under ground 11 KV XLPEcable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone blast.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail